Filter interviews by
I applied via Naukri.com and was interviewed in Sep 2023. There were 2 interview rounds.
I have completed various projects at NWDA related to business development.
Developed new business strategies to increase revenue
Identified potential clients and formed partnerships
Analyzed market trends and competitor activities
Implemented marketing campaigns to promote products/services
Some problems of irrigation projects include water scarcity, inefficient water distribution, environmental impact, and maintenance issues.
Water scarcity leading to insufficient supply for irrigation needs
Inefficient water distribution systems causing uneven water distribution
Environmental impact such as soil salinization and water pollution
Maintenance issues like clogging of irrigation channels or equipment breakdowns
The latest model for solving sewage and drainage problems involves implementing green infrastructure solutions such as rain gardens and permeable pavement.
Green infrastructure solutions help manage stormwater runoff by allowing water to infiltrate into the ground instead of overwhelming sewer systems.
Examples of green infrastructure include rain gardens, bioswales, permeable pavement, and green roofs.
These solutions ca...
Currently involved in large-scale irrigation projects in rural areas
Implementing drip irrigation systems to conserve water
Utilizing solar-powered pumps for efficient water distribution
Working with local communities to educate on sustainable irrigation practices
Top trending discussions
posted on 20 Apr 2024
posted on 24 Mar 2022
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
posted on 4 Sep 2021
I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.
Deviation of line and spotting of towers refer to the process of ensuring proper clearance for power lines and structures.
Deviation of line refers to the process of ensuring that power lines follow a safe and efficient path.
Spotting of towers involves determining the optimal location for power line towers to ensure proper clearance.
Major statutory clearance refers to the minimum distance required between power lines an...
My strengths in transmission line construction activity lie in my experience in managing large-scale projects and ensuring adherence to safety standards.
Experience in managing large-scale transmission line construction projects
Expertise in ensuring adherence to safety standards and regulations
Ability to coordinate with cross-functional teams and stakeholders
Strong problem-solving and decision-making skills
Familiarity w...
posted on 15 Jul 2024
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
Compressor troubleshooting involves identifying and resolving issues with the compressor in a system.
Check for leaks in the system
Inspect the compressor for damage or wear
Check the electrical connections and wiring
Monitor the pressure and temperature readings
Clean or replace air filters
Check the oil level and quality
Inspect the belts and pulleys for wear or damage
I applied via Campus Placement and was interviewed in Apr 2024. There was 1 interview round.
I am from a small town in the Midwest and I am passionate about environmental conservation.
I grew up in a close-knit community in the Midwest
I have always been interested in protecting the environment
I enjoy outdoor activities like hiking and gardening
I have a Bachelor's degree in Computer Science from XYZ University.
Bachelor's degree in Computer Science
Graduated from XYZ University
Specialized in software development
posted on 30 May 2025
I appeared for an interview before May 2024, where I was asked the following questions.
I am a proactive problem-solver with strong technical skills and a collaborative mindset, dedicated to delivering high-quality results.
Strong technical expertise: I have over 10 years of experience in software development, specializing in scalable web applications.
Proactive problem-solving: In my last project, I identified a critical performance bottleneck and implemented a solution that improved load times by 30%.
Team...
posted on 21 Aug 2023
I applied via Recruitment Consulltant and was interviewed in Feb 2023. There were 4 interview rounds.
based on 1 interview experience
Difficulty level
Duration
based on 1 review
Rating in categories
Quantity Surveyor
24
salaries
| ₹3.6 L/yr - ₹7.3 L/yr |
Assistant Highway Engineer
22
salaries
| ₹3 L/yr - ₹6 L/yr |
Assistant Bridge Engineer
14
salaries
| ₹3.6 L/yr - ₹7.2 L/yr |
Field Engineer
12
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Civil Site Engineer
11
salaries
| ₹2.4 L/yr - ₹4.8 L/yr |
GAMMON INDIA
McNally Bharat Engineering
ABCI Infrastructures
VIKRAN Engineering & Exim