Filter interviews by
A project is declared a national project based on its significance, funding, and impact on public welfare.
National significance: The project addresses critical issues like water scarcity or pollution.
Government endorsement: Requires approval from national authorities or ministries.
Funding allocation: Secured funding from national budgets or international grants.
Public impact: Demonstrates potential to improve publ...
I have successfully managed multiple water and wastewater projects, enhancing efficiency and sustainability.
Led a $10 million wastewater treatment plant upgrade, increasing capacity by 30%.
Implemented a water conservation program that reduced consumption by 15% in urban areas.
Oversaw the construction of a new water distribution system serving 50,000 residents.
Developed a comprehensive maintenance plan that decreas...
Some problems of irrigation projects include water scarcity, inefficient water distribution, environmental impact, and maintenance issues.
Water scarcity leading to insufficient supply for irrigation needs
Inefficient water distribution systems causing uneven water distribution
Environmental impact such as soil salinization and water pollution
Maintenance issues like clogging of irrigation channels or equipment breakd...
Transmission lines should be laid at a distance from the centre line of roads based on pavement width to ensure safety and efficiency.
Transmission lines should be laid at a distance that allows for safe maintenance and operation without interfering with road traffic.
For roads with narrow pavement width, transmission lines should be placed further away from the centre line to avoid potential hazards.
In contrast, fo...
The Ken-Betwa Link Project aims to provide irrigation and drinking water through interlinking rivers in India.
The project involves the interlinking of the Ken and Betwa rivers to enhance water availability.
It aims to irrigate around 1.5 million hectares of agricultural land in Madhya Pradesh.
The project is expected to provide drinking water to over 62 lakh people in the Bundelkhand region.
Environmental concerns in...
I have completed various projects at NWDA related to business development.
Developed new business strategies to increase revenue
Identified potential clients and formed partnerships
Analyzed market trends and competitor activities
Implemented marketing campaigns to promote products/services
Currently involved in large-scale irrigation projects in rural areas
Implementing drip irrigation systems to conserve water
Utilizing solar-powered pumps for efficient water distribution
Working with local communities to educate on sustainable irrigation practices
I applied via Naukri.com and was interviewed in Sep 2023. There were 2 interview rounds.
I have completed various projects at NWDA related to business development.
Developed new business strategies to increase revenue
Identified potential clients and formed partnerships
Analyzed market trends and competitor activities
Implemented marketing campaigns to promote products/services
Some problems of irrigation projects include water scarcity, inefficient water distribution, environmental impact, and maintenance issues.
Water scarcity leading to insufficient supply for irrigation needs
Inefficient water distribution systems causing uneven water distribution
Environmental impact such as soil salinization and water pollution
Maintenance issues like clogging of irrigation channels or equipment breakdowns
The latest model for solving sewage and drainage problems involves implementing green infrastructure solutions such as rain gardens and permeable pavement.
Green infrastructure solutions help manage stormwater runoff by allowing water to infiltrate into the ground instead of overwhelming sewer systems.
Examples of green infrastructure include rain gardens, bioswales, permeable pavement, and green roofs.
These solutions ca...
Currently involved in large-scale irrigation projects in rural areas
Implementing drip irrigation systems to conserve water
Utilizing solar-powered pumps for efficient water distribution
Working with local communities to educate on sustainable irrigation practices
I appeared for an interview in Mar 2025, where I was asked the following questions.
I have successfully managed multiple water and wastewater projects, enhancing efficiency and sustainability.
Led a $10 million wastewater treatment plant upgrade, increasing capacity by 30%.
Implemented a water conservation program that reduced consumption by 15% in urban areas.
Oversaw the construction of a new water distribution system serving 50,000 residents.
Developed a comprehensive maintenance plan that decreased do...
The Ken-Betwa Link Project aims to provide irrigation and drinking water through interlinking rivers in India.
The project involves the interlinking of the Ken and Betwa rivers to enhance water availability.
It aims to irrigate around 1.5 million hectares of agricultural land in Madhya Pradesh.
The project is expected to provide drinking water to over 62 lakh people in the Bundelkhand region.
Environmental concerns include...
A project is declared a national project based on its significance, funding, and impact on public welfare.
National significance: The project addresses critical issues like water scarcity or pollution.
Government endorsement: Requires approval from national authorities or ministries.
Funding allocation: Secured funding from national budgets or international grants.
Public impact: Demonstrates potential to improve public he...
I have completed multiple project reports during my service period.
Led a team to compile and analyze data for a quarterly project report
Implemented new reporting tools to streamline the process and improve accuracy
Presented findings to senior management and stakeholders for decision-making
Ensured all reports were completed on time and met quality standards
posted on 7 Dec 2024
Over all performance
Project work related
posted on 21 Mar 2025
I appeared for an interview before Mar 2024, where I was asked the following questions.
I applied via Referral and was interviewed in May 2022. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed before Apr 2019. There was 1 interview round.
Transmission lines should be laid at a distance from the centre line of roads based on pavement width to ensure safety and efficiency.
Transmission lines should be laid at a distance that allows for safe maintenance and operation without interfering with road traffic.
For roads with narrow pavement width, transmission lines should be placed further away from the centre line to avoid potential hazards.
In contrast, for roa...
Top trending discussions
Some of the top questions asked at the MSV International interview -
based on 16 interview experiences
Difficulty level
Duration
based on 144 reviews
Rating in categories
Quantity Surveyor
24
salaries
| ₹3.6 L/yr - ₹7.3 L/yr |
Assistant Highway Engineer
22
salaries
| ₹3 L/yr - ₹6 L/yr |
Assistant Bridge Engineer
14
salaries
| ₹3.6 L/yr - ₹7.2 L/yr |
Field Engineer
12
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Civil Site Engineer
11
salaries
| ₹2.4 L/yr - ₹4.8 L/yr |
GAMMON INDIA
McNally Bharat Engineering
ABCI Infrastructures
VIKRAN Engineering & Exim