Upload Button Icon Add office photos

My Home Constructions

Compare button icon Compare button icon Compare

Filter interviews by

My Home Constructions Project Engineer Interview Questions and Answers

Updated 28 Jul 2024

My Home Constructions Project Engineer Interview Experiences

1 interview found

Project Engineer Interview Questions & Answers

user image Gopalakrishna Shaik

posted on 28 Jul 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. What's footing clear cover
  • Ans. 

    Footing clear cover is the distance between the outer face of the concrete footing and the nearest surface of the concrete cover.

    • Footing clear cover is important for protecting the reinforcement bars from corrosion and ensuring structural integrity.

    • It is typically specified in building codes and design drawings.

    • The footing clear cover can vary depending on the type of structure and environmental conditions.

    • For example,...

  • Answered by AI
  • Q2. What's Lapp joint length formula
  • Ans. 

    The Lapp joint length formula is used to calculate the required length of lap joint for a specific application.

    • The formula for calculating Lapp joint length is L = 1.5 * d * t

    • Where L is the required lap joint length, d is the diameter of the fastener, and t is the thickness of the material being joined

    • This formula helps in determining the optimal length of overlap for a strong and secure joint

    • For example, if the diamet...

  • Answered by AI
  • Q3. How much cubs in test rmc load
  • Ans. 

    The number of cubes in a test RMC load varies depending on the specific requirements of the project.

    • The number of cubes in a test RMC load is typically specified by the project engineer or testing standards.

    • Common numbers of cubes in a test RMC load include 3, 7, or 28 cubes.

    • The cubes are used for testing the compressive strength of the concrete mix.

    • The cubes are cast from the same batch of concrete used in the project...

  • Answered by AI

Top trending discussions

View All
Interview Hub
1w (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about My Home Constructions?
Ask anonymously on communities.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. How much experience in finishing work

Project Engineer Interview Questions Asked at Other Companies

asked in Wipro
Q1. Triangle Star Pattern Task Your task is to print a triangle patte ... read more
asked in Wipro
Q2. Encode The String Problem Statement Given a string S of length N, ... read more
asked in Wipro
Q3. Given a starting time, find the minimum number of minutes needed ... read more
asked in Wipro
Q4. Binary to Decimal Conversion Challenge Transform a given binary n ... read more
asked in Wipro
Q5. Mindbending Product Problem Statement You are given an array ARR ... read more

Junior Engineer Interview Questions & Answers

Nyati Group user image Chandan Shirbhayye

posted on 16 Mar 2025

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Feb 2025, where I was asked the following questions.

  • Q1. Have you ever used ERP ? And which one
  • Q2. Tell me about your past experience in your previous company
  • Ans. 

    I worked as a Junior Engineer, focusing on project design, implementation, and team collaboration to enhance operational efficiency.

    • Collaborated with a team of engineers to design and implement a new water treatment system, improving efficiency by 20%.

    • Conducted regular maintenance checks on machinery, reducing downtime by 15% through proactive troubleshooting.

    • Assisted in the development of project documentation, ensuri...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - For junior level you will get good experience in this company
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Tell me about your self
  • Q2. Density of building materials
  • Ans. 

    Building materials have varying densities depending on their composition.

    • Density is the mass per unit volume of a material.

    • Common building materials and their densities include concrete (2.4 g/cm³), brick (1.9-2.2 g/cm³), and wood (0.5-0.8 g/cm³).

    • Density affects the strength and durability of a structure, as well as its weight and cost.

  • Answered by AI
  • Q3. Billing procedure of your current company

Interview Preparation Tips

Interview preparation tips for other job seekers - Do not join if they told you to join in contracting division.
Interview experience
2
Poor
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
-

I applied via Walk-in and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is Youngs Modulus
  • Ans. 

    Young's Modulus is a measure of the stiffness of a material and its ability to withstand deformation under stress.

    • Young's Modulus is also known as the modulus of elasticity.

    • It is defined as the ratio of stress to strain in a material under tension or compression.

    • Materials with high Young's Modulus values are stiffer and more resistant to deformation.

    • For example, steel has a high Young's Modulus value compared to rubber...

  • Answered by AI
  • Q2. How to find bearing capacity of sandy soil
  • Ans. 

    To find bearing capacity of sandy soil, conduct standard penetration test, determine soil type, calculate bearing capacity using appropriate formula.

    • Conduct standard penetration test (SPT) to determine soil properties

    • Identify soil type (sandy soil)

    • Calculate bearing capacity using appropriate formula (e.g. Terzaghi's bearing capacity equation)

    • Consider factors such as soil cohesion, angle of internal friction, and depth ...

  • Answered by AI

I applied via Company Website and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Type of work I am doing in previous company
  • Q2. All construction activities I handeld

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Company & Good Culture

My Home Constructions HR Interview Questions

17 questions and answers

Q. How do you manage the work pressure imposed by your superiors?
Q. What do you consider to be your weaknesses?
Q. What do you consider to be your strengths?

Interview Questionnaire 

2 Questions

  • Q1. What projects i had done in Bachelors?
  • Ans. 

    I completed various projects during my Bachelor's degree, including a design project for a new bridge and a research project on renewable energy.

    • Designed a new bridge using CAD software

    • Researched and implemented renewable energy sources on campus

    • Collaborated with classmates on a group project to improve campus sustainability

  • Answered by AI
  • Q2. Where i did my 6 months internship?

Interview Preparation Tips

Round: Technical Interview
Experience: I was fresher, so they usually ask me about my university projects and my final training.
Tips: It will be good if you relate your projects with the company profile.

Are these interview questions helpful?
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I appeared for an interview in Apr 2025, where I was asked the following questions.

  • Q1. Types of Construction process / interior process
  • Q2. General roles / responsibilities
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Diffirence between project and project engineering
  • Ans. 

    Project refers to a specific task with a defined start and end, while project engineering involves the technical aspects of planning, designing, and executing the project.

    • Project is the overall task or objective to be completed within a specific timeframe.

    • Project engineering focuses on the technical aspects such as planning, designing, and executing the project.

    • Project management involves coordinating resources and tas...

  • Answered by AI
  • Q2. Types of services in interior fitout
  • Ans. 

    Types of services in interior fitout include design, construction, project management, and installation.

    • Design services involve creating layouts, selecting materials, and creating 3D visualizations.

    • Construction services include building partitions, ceilings, and flooring.

    • Project management services involve coordinating schedules, budgets, and contractors.

    • Installation services include fitting furniture, fixtures, and eq...

  • Answered by AI
Round 3 - One-on-one 

(2 Questions)

  • Q1. Problems faced in site
  • Ans. 

    Some common problems faced on site include delays in material delivery, inclement weather, and coordination issues.

    • Delays in material delivery can impact project timelines and budgets

    • Inclement weather can halt work progress and cause safety concerns

    • Coordination issues between different teams can lead to misunderstandings and errors

  • Answered by AI
  • Q2. Difference between agreement and bond
  • Ans. 

    Agreement is a mutual understanding between parties, while a bond is a legal document that ensures fulfillment of obligations.

    • Agreement is a mutual understanding between two or more parties.

    • A bond is a legal document that guarantees the fulfillment of obligations.

    • Agreements are usually informal and may not always be legally binding.

    • Bonds are formal and legally enforceable documents.

    • Examples of agreements include contra...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Rate Analysis , Reconciliation of materials
  • Q2. Coefficient of cement
  • Ans. 

    The coefficient of cement is a measure of its ability to expand or contract due to changes in temperature or moisture.

    • The coefficient of cement is also known as the coefficient of thermal expansion.

    • It is an important factor to consider in construction projects to prevent cracking or damage to structures.

    • The coefficient of cement varies depending on the type and composition of the cement.

    • For example, Portland cement typ...

  • Answered by AI
  • Q3. Escalation of materials
  • Ans. 

    Escalation of materials refers to the process of increasing the priority or urgency of obtaining necessary materials for a project.

    • Escalation may occur when there are delays in the delivery of materials or when the demand for materials exceeds the supply.

    • Project managers may escalate materials by contacting suppliers to expedite delivery or by seeking alternative sources for the materials.

    • Escalation can impact project ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company , well balanced life, flexible time
Job security

My Home Constructions Interview FAQs

How many rounds are there in My Home Constructions Project Engineer interview?
My Home Constructions interview process usually has 1 rounds. The most common rounds in the My Home Constructions interview process are Technical.
What are the top questions asked in My Home Constructions Project Engineer interview?

Some of the top questions asked at the My Home Constructions Project Engineer interview -

  1. What's Lapp joint length form...read more
  2. How much cubs in test rmc l...read more
  3. What's footing clear co...read more

Tell us how to improve this page.

Overall Interview Experience Rating

4/5

based on 1 interview experience

My Home Constructions Project Engineer Salary
based on 18 salaries
₹3.4 L/yr - ₹5.5 L/yr
16% less than the average Project Engineer Salary in India
View more details

My Home Constructions Project Engineer Reviews and Ratings

based on 3 reviews

4.1/5

Rating in categories

3.8

Skill development

4.7

Work-life balance

4.4

Salary

4.3

Job security

4.8

Company culture

3.8

Promotions

4.0

Work satisfaction

Explore 3 Reviews and Ratings
Junior Engineer
94 salaries
unlock blur

₹2 L/yr - ₹4.5 L/yr

Senior Engineer
91 salaries
unlock blur

₹4.2 L/yr - ₹9 L/yr

Engineer
54 salaries
unlock blur

₹3.9 L/yr - ₹6.4 L/yr

Assistant Manager
47 salaries
unlock blur

₹5.2 L/yr - ₹12 L/yr

Associate Manager
47 salaries
unlock blur

₹8 L/yr - ₹14 L/yr

Explore more salaries
Compare My Home Constructions with

Knight Frank

4.1
Compare

M3M India

4.0
Compare

R.S. Infraprojects

3.9
Compare

SMEC

3.6
Compare
write
Share an Interview