Before casting a tower foundation, several things need to be checked to ensure its stability and durability.
Check the soil condition and bearing capacity
Ensure proper reinforcement and formwork
Verify the dimensions and alignment of the foundation
Check for any obstructions or utilities in the excavation area
Ensure proper curing of the concrete
Verify compliance with local building codes and regulations
Trapezoidal foundation quantity is calculated by finding the average width and multiplying it by the length and depth.
Measure the length and depth of the foundation
Measure the width at both ends and find the average width
Multiply the average width by the length and depth to get the volume
Calculate the quantity by multiplying the volume with the unit weight of concrete
posted on 1 Oct 2021
I applied via Naukri.com and was interviewed in Apr 2021. There was 1 interview round.
The rebar grade should be selected based on the design requirements and the structural load capacity.
The rebar grade is determined by the design engineer based on the structural requirements.
The grade of rebar is usually specified in the structural drawings and specifications.
The most commonly used rebar grades are 40, 60, and 75.
The higher the grade of rebar, the stronger it is and the more load it can bear.
The rebar ...
I applied via Naukri.com
Steel can be made strong by controlling its composition and heat treatment.
Increasing the carbon content and adding other alloying elements like manganese, chromium, and nickel can improve strength.
Heat treatment processes like quenching and tempering can also increase strength.
Proper quality control during manufacturing and testing can ensure the steel meets strength requirements.
Examples of high-strength steels inclu...
Achieving very good finishing in civil engineering involves meticulous planning, quality materials, and skilled workmanship.
Use high-quality materials: For example, selecting premium concrete mixes can enhance durability and finish.
Employ skilled labor: Experienced workers can ensure precise execution of designs and details.
Implement proper curing techniques: Adequate curing of concrete prevents cracks and improves sur...
posted on 12 Mar 2024
I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.
SOLAR ENERGY RELETED CIVIL CONSTRUCTION DISCUSSION
Solar system refers to the collection of planets and other objects that orbit around a star, typically referring to our own solar system with the Sun at its center.
The solar system consists of the Sun, eight planets, moons, asteroids, comets, and other celestial bodies.
The planets in our solar system are Mercury, Venus, Earth, Mars, Jupiter, Saturn, Uranus, and Neptune.
The Sun is the central star of our solar system, p...
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.
Grades of concrete in a mixed batch can be estimated by performing a slump test and conducting compressive strength tests on samples.
Perform a slump test to determine the workability of the concrete mix.
Take samples from the mixed batch and cast test specimens for compressive strength testing.
Conduct compressive strength tests on the specimens to determine the grade of concrete.
Compare the test results with the standar...
Plastering work calculation involves determining the surface area of the wall and the thickness of the plaster.
Calculate the surface area of the wall by multiplying the height and length of each wall segment.
Determine the total surface area to be plastered by adding up the surface areas of all wall segments.
Multiply the total surface area by the desired thickness of the plaster to get the volume of plaster needed.
Consi...
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
A man day is a unit of measure representing the amount of work one person can complete in a single day.
Typically used in project management to estimate labor costs and timelines.
One man day usually equals 8 hours of work.
For example, if a task requires 40 man days, it would take one person 40 days or 5 people 8 days to complete.
Helps in resource allocation and planning for projects.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
based on 2 interview experiences
based on 21 reviews
Rating in categories
Site Engineer
70
salaries
| ₹2 L/yr - ₹5.2 L/yr |
Civil Site Engineer
68
salaries
| ₹2.2 L/yr - ₹7.2 L/yr |
Billing Engineer
41
salaries
| ₹2.4 L/yr - ₹6.6 L/yr |
Civil Engineer
33
salaries
| ₹2.3 L/yr - ₹5.5 L/yr |
Senior Engineer
31
salaries
| ₹4 L/yr - ₹8.9 L/yr |
L&T Energy Hydrocarbon
AECOM
Sterling & Wilson
Apco Infratech