i
PIX
Transmissions
Filter interviews by
I appeared for an interview before Jul 2024, where I was asked the following questions.
Handling situations requires a calm approach, effective communication, and problem-solving skills to navigate challenges successfully.
Stay calm under pressure; for example, during a machinery breakdown, assess the situation before reacting.
Communicate clearly with team members; if a task is behind schedule, discuss solutions collaboratively.
Prioritize safety; in case of an emergency, follow established protocols to ens...
Top trending discussions
I applied via Naukri.com and was interviewed before Apr 2021. There were 2 interview rounds.
posted on 21 May 2023
The question is unclear and lacks context.
The interviewer needs to provide more information or rephrase the question.
It is important to understand the specific context and requirements of the job.
Induction motors are commonly used in industrial applications.
Rotating condition may refer to the motor's speed or direction of rotation.
Good questions about coding
PIQ code is a unique identifier used in the oil and gas industry to track equipment and materials throughout the production process.
PIQ code stands for Production Identification Code.
It is typically a combination of letters and numbers assigned to each piece of equipment or material.
PIQ codes help streamline production processes by easily identifying and tracking items.
Example: PIQ code ABC1234 could be assigned to a s...
I applied via Campus Placement and was interviewed before Jul 2022. There were 4 interview rounds.
Aptitude test is only based on awareness and normal as like basic test.
I appeared for an interview before May 2024, where I was asked the following questions.
I applied via Naukri.com and was interviewed in Jun 2023. There were 2 interview rounds.
5S is a workplace organization method that focuses on creating a clean and efficient work environment. FIFO stands for First In, First Out and is a method used to manage inventory and ensure older items are used or sold first.
5S is a methodology for organizing and maintaining a clean and efficient workplace.
It involves five steps: Sort, Set in Order, Shine, Standardize, and Sustain.
FIFO is a method used to manage inven...
OEE (Overall Equipment Efficiency) is a calculation used to measure the effectiveness of a production process.
OEE is a metric that combines availability, performance, and quality to assess the overall efficiency of equipment or a production line.
It is calculated by multiplying the availability, performance, and quality factors together.
OEE provides insights into how well the equipment is being utilized and identifies a...
TPM-JH stands for Total Productive Maintenance - Jishu Hozen.
TPM-JH is a maintenance methodology used in manufacturing industries.
It focuses on maximizing equipment effectiveness and minimizing downtime.
TPM-JH involves proactive maintenance activities and employee involvement.
It aims to improve overall equipment efficiency and reduce defects.
Examples of TPM-JH techniques include autonomous maintenance and planned maint...
Bakido and chokorate are not recognized terms in the field of production engineering.
Bakido and chokorate are not commonly used terms in production engineering.
There is no known definition or explanation for bakido and chokorate in the context of production engineering.
It is possible that the interviewer made a mistake or was referring to something unrelated to the field.
PPLH stands for Pilot Proficiency and Learning Hours.
PPLH is a measure of the time a pilot spends on training and practicing to improve their skills.
It includes both flight hours and ground-based learning activities.
PPLH is important for maintaining and enhancing pilot proficiency and safety.
Examples of PPLH activities include simulator sessions, classroom instruction, and flight training exercises.
Instruments knowledge refers to the understanding and familiarity with various tools and equipment used in production engineering.
Knowledge of different types of instruments used in production engineering
Understanding of how to operate and calibrate instruments
Ability to troubleshoot and maintain instruments
Knowledge of safety protocols and regulations related to instrument usage
Familiarity with software and computer s...
Manpower refers to the total number of workers or employees in a company or organization.
Manpower is a term used to describe the human resources or workforce available in a company.
It includes all the employees, workers, and staff members who contribute to the production process.
Manpower is an important factor in determining the productivity and efficiency of a company.
It can be measured in terms of the number of emplo...
Preventive maintenance is a proactive approach to maintenance that involves regularly scheduled inspections, repairs, and replacements to prevent equipment failure.
Preventive maintenance aims to identify and address potential issues before they cause equipment breakdowns or failures.
It involves creating a maintenance schedule and following it consistently.
Regular inspections, lubrication, cleaning, and calibration are ...
In my previous role, I utilized various documents for production planning, quality control, and process optimization.
Production schedules: Used to plan and allocate resources effectively.
Quality assurance documents: Ensured compliance with industry standards.
Standard Operating Procedures (SOPs): Provided guidelines for consistent production processes.
Work instructions: Detailed steps for specific tasks to maintain effi...
I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.
Yes, my performance was evaluated through regular performance reviews and feedback sessions.
Performance evaluations were conducted on a quarterly basis.
Feedback sessions were held to discuss strengths and areas for improvement.
Achievements and goals were reviewed to track progress.
Received positive feedback on project completion and problem-solving skills.
My strengths in my previous company included strong problem-solving skills, attention to detail, and the ability to work well under pressure.
Strong problem-solving skills - I was able to quickly identify and resolve production issues to minimize downtime.
Attention to detail - I consistently ensured that all production processes were carried out accurately and efficiently.
Ability to work well under pressure - I thrived ...
based on 1 interview experience
Difficulty level
Duration
based on 1 review
Rating in categories
Assistant Manager
37
salaries
| ₹6.4 L/yr - ₹12.8 L/yr |
Senior Engineer
32
salaries
| ₹4.5 L/yr - ₹8 L/yr |
Area Manager
21
salaries
| ₹5.9 L/yr - ₹11 L/yr |
Area Sales Manager
20
salaries
| ₹3.9 L/yr - ₹8.5 L/yr |
Production Engineer
17
salaries
| ₹2.4 L/yr - ₹7.3 L/yr |
Indorama
Monte Carlo
Go Colors
YKK