Filter interviews by
4-stroke engines complete a cycle in four strokes of the piston, while 2-stroke engines do it in two, affecting efficiency and power.
4-stroke engines have four stages: intake, compression, power, and exhaust. Example: Most cars use 4-stroke engines.
2-stroke engines complete a power cycle in two strokes: compression and power. Example: Chainsaws and lawnmowers often use 2-stroke engines.
4-stroke engines are general...
Turbines convert fluid energy into mechanical energy, powering various applications like electricity generation and propulsion.
Turbines operate on the principle of converting kinetic energy from fluid flow into rotational energy.
Common types include steam turbines, gas turbines, and water turbines, each suited for specific energy sources.
In a steam turbine, high-pressure steam spins blades connected to a generator...
Hydraulic processes use fluid mechanics to transmit force and motion through incompressible fluids in various applications.
Hydraulics operates on Pascal's principle, where pressure applied to a confined fluid is transmitted equally in all directions.
Common applications include hydraulic brakes in vehicles, where force from the brake pedal is transmitted to brake pads.
Hydraulic systems are used in construction equi...
OEE measures production efficiency, identifying areas for improvement in manufacturing processes.
OEE is calculated using three components: Availability, Performance, and Quality.
For example, if a machine is down for maintenance, it affects Availability.
Performance considers the speed of production; if a machine runs slower than its capacity, it impacts OEE.
Quality measures the number of good products produced vers...
OEE data analysis led to reduced cycle times and improved efficiency in a construction project.
Identified bottlenecks in equipment usage through OEE metrics, leading to targeted improvements.
Implemented preventive maintenance schedules based on OEE data, reducing downtime by 15%.
Trained staff on efficient equipment operation, increasing overall productivity by 20%.
Utilized OEE insights to optimize workflow, result...
OEE measures the efficiency of manufacturing processes by evaluating availability, performance, and quality.
OEE is calculated using the formula: OEE = Availability x Performance x Quality.
Availability measures the percentage of scheduled time that the equipment is available for production.
Performance assesses the speed at which the equipment operates compared to its maximum potential.
Quality evaluates the proporti...
OEE helps identify inefficiencies, guiding better production planning and scheduling in construction projects.
Identifies equipment downtime: By tracking OEE, engineers can pinpoint when equipment is underperforming, allowing for timely maintenance.
Improves resource allocation: Understanding OEE helps in scheduling resources more effectively, ensuring that high-performing equipment is prioritized.
Enhances workflow ...
Poka yoke is a Japanese term for mistake-proofing or error prevention in manufacturing processes.
Poka yoke aims to prevent mistakes by designing processes or products in a way that makes errors impossible or easily detectable.
Examples of poka yoke include using color coding or shapes to ensure correct assembly of parts, or designing a machine to stop if a step is missed.
The concept helps improve quality, reduce de...
Formulas in Excel using LEFT, RIGHT, and MID functions.
LEFT function extracts a specified number of characters from the left side of a text string.
RIGHT function extracts a specified number of characters from the right side of a text string.
MID function extracts a specific number of characters from a text string, starting at a specified position.
Example: =LEFT(A1, 5) would extract the first 5 characters from cell ...
PPLH stands for Pilot Proficiency and Learning Hours.
PPLH is a measure of the time a pilot spends on training and practicing to improve their skills.
It includes both flight hours and ground-based learning activities.
PPLH is important for maintaining and enhancing pilot proficiency and safety.
Examples of PPLH activities include simulator sessions, classroom instruction, and flight training exercises.
I appeared for an interview in May 2025, where I was asked the following questions.
I have extensive experience managing construction projects, focusing on optimizing production and manufacturing processes for efficiency.
Managed a team of engineers and subcontractors to ensure timely project delivery, improving overall efficiency by 20%.
Implemented Lean construction techniques, reducing waste and enhancing productivity on-site.
Coordinated with suppliers to streamline material procurement, ensuring jus...
OEE measures the efficiency of manufacturing processes by evaluating availability, performance, and quality.
OEE is calculated using the formula: OEE = Availability x Performance x Quality.
Availability measures the percentage of scheduled time that the equipment is available for production.
Performance assesses the speed at which the equipment operates compared to its maximum potential.
Quality evaluates the proportion of...
OEE helps identify inefficiencies, guiding better production planning and scheduling in construction projects.
Identifies equipment downtime: By tracking OEE, engineers can pinpoint when equipment is underperforming, allowing for timely maintenance.
Improves resource allocation: Understanding OEE helps in scheduling resources more effectively, ensuring that high-performing equipment is prioritized.
Enhances workflow effic...
OEE data analysis led to reduced cycle times and improved efficiency in a construction project.
Identified bottlenecks in equipment usage through OEE metrics, leading to targeted improvements.
Implemented preventive maintenance schedules based on OEE data, reducing downtime by 15%.
Trained staff on efficient equipment operation, increasing overall productivity by 20%.
Utilized OEE insights to optimize workflow, resulting i...
OEE measures production efficiency, identifying areas for improvement in manufacturing processes.
OEE is calculated using three components: Availability, Performance, and Quality.
For example, if a machine is down for maintenance, it affects Availability.
Performance considers the speed of production; if a machine runs slower than its capacity, it impacts OEE.
Quality measures the number of good products produced versus to...
I appeared for an interview in May 2025, where I was asked the following questions.
4-stroke engines complete a cycle in four strokes of the piston, while 2-stroke engines do it in two, affecting efficiency and power.
4-stroke engines have four stages: intake, compression, power, and exhaust. Example: Most cars use 4-stroke engines.
2-stroke engines complete a power cycle in two strokes: compression and power. Example: Chainsaws and lawnmowers often use 2-stroke engines.
4-stroke engines are generally mo...
Turbines convert fluid energy into mechanical energy, powering various applications like electricity generation and propulsion.
Turbines operate on the principle of converting kinetic energy from fluid flow into rotational energy.
Common types include steam turbines, gas turbines, and water turbines, each suited for specific energy sources.
In a steam turbine, high-pressure steam spins blades connected to a generator, pro...
I applied via Naukri.com and was interviewed in Aug 2023. There were 3 interview rounds.
Kaizen is a Japanese term meaning continuous improvement. It involves making small, incremental changes to processes in order to improve efficiency and quality.
Kaizen focuses on involving all employees in the improvement process
It emphasizes making small, gradual changes rather than large, disruptive ones
Kaizen is a key principle of lean manufacturing and Six Sigma methodologies
Examples of kaizen include implementing 5...
5s and TPM are methodologies used in manufacturing to improve efficiency and productivity.
5s stands for Sort, Set in order, Shine, Standardize, Sustain. It is a method for organizing the workplace to improve efficiency and safety.
TPM stands for Total Productive Maintenance. It is a method for maximizing the effectiveness of equipment by involving all employees in the maintenance process.
Both 5s and TPM are commonly use...
OEE (Overall Equipment Effectiveness) is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying Availability, Performance, and Quality percentages.
Availability measures the percentage of time the equipment is running during planned production time.
Performance measures the speed at which the equipment is running compared to its maximum speed.
Quality measures the percentage of good p...
4m and 3m are abbreviations for different types of process analysis tools used in manufacturing.
4m stands for Man, Machine, Material, and Method - used to analyze potential causes of a problem in manufacturing processes.
3m stands for Man, Machine, and Method - used to analyze the efficiency of a manufacturing process.
These tools help identify areas for improvement and optimization in manufacturing processes.
Six Sigma is a data-driven methodology used to improve processes by reducing defects and variations.
Six Sigma aims to achieve near perfection in processes by identifying and eliminating causes of defects or errors.
It involves statistical analysis, process mapping, and continuous improvement techniques.
Six Sigma uses a set of quality management methods, including DMAIC (Define, Measure, Analyze, Improve, Control) and DM...
Man power handling refers to the management and coordination of human resources within a process or organization.
Man power handling involves assigning tasks, monitoring progress, and ensuring efficiency in the use of human resources.
It includes managing work schedules, resolving conflicts, and providing training and support to employees.
Examples of man power handling in a process engineering role could include coordina...
Veving problem refers to a common issue in weaving processes where the fabric pattern is not aligned properly.
Veving problem can occur due to incorrect warp or weft tension.
It can also be caused by misalignment of the weaving machine.
Examples include misaligned stripes or patterns in the fabric.
Wrinkle problem refers to the occurrence of wrinkles or creases in a material, often caused by improper processing or handling.
Wrinkle problems can occur in various materials such as plastics, fabrics, or paper during manufacturing processes.
Common causes of wrinkle problems include improper tension control, inadequate drying or curing time, or incorrect temperature settings.
Examples of wrinkle problems include creases...
I applied via Naukri.com and was interviewed in Jun 2023. There were 2 interview rounds.
5S is a workplace organization method that focuses on creating a clean and efficient work environment. FIFO stands for First In, First Out and is a method used to manage inventory and ensure older items are used or sold first.
5S is a methodology for organizing and maintaining a clean and efficient workplace.
It involves five steps: Sort, Set in Order, Shine, Standardize, and Sustain.
FIFO is a method used to manage inven...
OEE (Overall Equipment Efficiency) is a calculation used to measure the effectiveness of a production process.
OEE is a metric that combines availability, performance, and quality to assess the overall efficiency of equipment or a production line.
It is calculated by multiplying the availability, performance, and quality factors together.
OEE provides insights into how well the equipment is being utilized and identifies a...
TPM-JH stands for Total Productive Maintenance - Jishu Hozen.
TPM-JH is a maintenance methodology used in manufacturing industries.
It focuses on maximizing equipment effectiveness and minimizing downtime.
TPM-JH involves proactive maintenance activities and employee involvement.
It aims to improve overall equipment efficiency and reduce defects.
Examples of TPM-JH techniques include autonomous maintenance and planned maint...
Bakido and chokorate are not recognized terms in the field of production engineering.
Bakido and chokorate are not commonly used terms in production engineering.
There is no known definition or explanation for bakido and chokorate in the context of production engineering.
It is possible that the interviewer made a mistake or was referring to something unrelated to the field.
PPLH stands for Pilot Proficiency and Learning Hours.
PPLH is a measure of the time a pilot spends on training and practicing to improve their skills.
It includes both flight hours and ground-based learning activities.
PPLH is important for maintaining and enhancing pilot proficiency and safety.
Examples of PPLH activities include simulator sessions, classroom instruction, and flight training exercises.
Instruments knowledge refers to the understanding and familiarity with various tools and equipment used in production engineering.
Knowledge of different types of instruments used in production engineering
Understanding of how to operate and calibrate instruments
Ability to troubleshoot and maintain instruments
Knowledge of safety protocols and regulations related to instrument usage
Familiarity with software and computer s...
Manpower refers to the total number of workers or employees in a company or organization.
Manpower is a term used to describe the human resources or workforce available in a company.
It includes all the employees, workers, and staff members who contribute to the production process.
Manpower is an important factor in determining the productivity and efficiency of a company.
It can be measured in terms of the number of emplo...
Preventive maintenance is a proactive approach to maintenance that involves regularly scheduled inspections, repairs, and replacements to prevent equipment failure.
Preventive maintenance aims to identify and address potential issues before they cause equipment breakdowns or failures.
It involves creating a maintenance schedule and following it consistently.
Regular inspections, lubrication, cleaning, and calibration are ...
In my previous role, I utilized various documents for production planning, quality control, and process optimization.
Production schedules: Used to plan and allocate resources effectively.
Quality assurance documents: Ensured compliance with industry standards.
Standard Operating Procedures (SOPs): Provided guidelines for consistent production processes.
Work instructions: Detailed steps for specific tasks to maintain effi...
I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 3 interview rounds.
Kazan process is a method used in woodworking to join two pieces of wood together.
Involves cutting a groove in one piece of wood and a corresponding tongue in the other piece
The tongue fits into the groove, creating a strong joint
Commonly used in making cabinets, drawers, and furniture
Regular work and kazan mechanical
I applied via Naukri.com and was interviewed in Aug 2023. There was 1 interview round.
I applied via Times Job and was interviewed before Dec 2023. There was 1 interview round.
I applied via Walk-in and was interviewed in Sep 2022. There were 3 interview rounds.
Topic they gave randomgutyutyuhuj
Strategy is a plan of action designed to achieve a long-term or overall aim.
Strategy involves setting goals and objectives, analyzing the current situation, and determining the best course of action to achieve those goals.
It requires making decisions about resource allocation, identifying potential risks and opportunities, and developing tactics to execute the plan.
Examples of strategies include market penetration, pro...
Top trending discussions
Some of the top questions asked at the YKK interview -
The duration of YKK interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 23 interview experiences
Difficulty level
Duration
Assistant Engineer
223
salaries
| ₹1.5 L/yr - ₹3.5 L/yr |
Process Engineer
60
salaries
| ₹2.7 L/yr - ₹7.2 L/yr |
Senior Executive
46
salaries
| ₹4.4 L/yr - ₹10 L/yr |
Production Engineer
44
salaries
| ₹2 L/yr - ₹6 L/yr |
Engineer
36
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Monte Carlo
Safari Industries India
Van Heusen
Uniqlo