Key aspects of turbine protection include overspeed protection, vibration monitoring, temperature monitoring, and lube oil system protection.
Overspeed protection is crucial to prevent catastrophic failure in case of excessive turbine speed.
Vibration monitoring helps detect any abnormal vibrations that could indicate potential issues with the turbine.
Temperature monitoring ensures that the turbine operates within safe t...
I appeared for an interview before Mar 2024, where I was asked the following questions.
In my previous role, I utilized Python and SQL for data analysis, visualization, and reporting to drive business insights.
Used Python libraries like Pandas and NumPy for data manipulation and cleaning, ensuring data integrity.
Developed SQL queries to extract and aggregate data from relational databases, enabling efficient reporting.
Created visualizations using Matplotlib and Seaborn in Python to present findings to sta...
Electroplating is a process of depositing a thin layer of metal onto a conductive surface using an electric current.
Involves immersing the object to be plated in a solution containing metal ions
Passing an electric current through the solution causes the metal ions to be deposited onto the object
Commonly used for decorative purposes, corrosion resistance, and improving conductivity
Examples include chrome plating on car ...
I applied via Recruitment Consulltant and was interviewed in Jul 2022. There was 1 interview round.
I applied via LinkedIn and was interviewed before Jun 2023. There were 2 interview rounds.
The critical path is the longest sequence of tasks in a project that must be completed on time in order for the project to finish on schedule.
Identifying the critical path helps in determining the minimum time needed to complete a project.
It consists of tasks that have zero slack or float, meaning any delay in these tasks will delay the entire project.
Activities on the critical path are often marked with a double line ...
I will plan a 50 Mwp project by conducting feasibility studies, creating a detailed project timeline, securing necessary permits, sourcing materials and contractors, and implementing a quality control plan.
Conduct feasibility studies to assess site suitability and potential challenges
Create a detailed project timeline outlining key milestones and deadlines
Secure necessary permits and approvals from local authorities
Sou...
MSP (Microsoft Project) is a project management software developed by Microsoft, while Primavera is a project management software developed by Oracle.
MSP is developed by Microsoft, while Primavera is developed by Oracle.
MSP is more commonly used for smaller projects, while Primavera is preferred for larger and more complex projects.
MSP is known for its user-friendly interface and ease of use, while Primavera is known f...
I appeared for an interview before Jun 2024, where I was asked the following questions.
Senior Engineer
97
salaries
| ₹4.1 L/yr - ₹7.8 L/yr |
Engineer
81
salaries
| ₹3 L/yr - ₹6.2 L/yr |
Deputy Manager
60
salaries
| ₹6.5 L/yr - ₹10.8 L/yr |
Electrical Engineer
36
salaries
| ₹2.6 L/yr - ₹6.5 L/yr |
Mechanical Engineer
33
salaries
| ₹2.4 L/yr - ₹6.2 L/yr |
Dhoot Transmission
SHV Energy
Operational Energy Group India
New Allenberry Works