Filter interviews by
Tribach calibration check is done by placing the tribach on a flat surface and checking the bubble level.
Place the tribach on a flat surface
Check the bubble level in all directions
Adjust the leveling screws if necessary
Repeat the process to ensure accuracy
Document the results for future reference
Top trending discussions
I applied via Referral and was interviewed in Dec 2020. There was 1 interview round.
posted on 24 Mar 2022
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
posted on 4 Sep 2021
I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.
Deviation of line and spotting of towers refer to the process of ensuring proper clearance for power lines and structures.
Deviation of line refers to the process of ensuring that power lines follow a safe and efficient path.
Spotting of towers involves determining the optimal location for power line towers to ensure proper clearance.
Major statutory clearance refers to the minimum distance required between power lines an...
My strengths in transmission line construction activity lie in my experience in managing large-scale projects and ensuring adherence to safety standards.
Experience in managing large-scale transmission line construction projects
Expertise in ensuring adherence to safety standards and regulations
Ability to coordinate with cross-functional teams and stakeholders
Strong problem-solving and decision-making skills
Familiarity w...
posted on 15 Jul 2024
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
I am a motivated student with a passion for technology and problem-solving, eager to contribute and learn in a dynamic internship environment.
Currently pursuing a degree in Computer Science, focusing on software development.
Completed a project on web application development using React and Node.js.
Interned at XYZ Company, where I assisted in debugging and improving existing software.
Active member of the university codi...
Your company is a leader in innovative technology solutions, focusing on enhancing user experience and driving digital transformation.
Founded in [Year], the company has grown to become a key player in the tech industry.
Known for products like [Product Name], which revolutionized [specific field or function].
Committed to sustainability, the company has implemented eco-friendly practices in its operations.
The company val...
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Mivan formwork is a construction technique that uses aluminum formwork system for casting concrete structures.
Mivan formwork involves setting up aluminum formwork panels, fixing reinforcement bars, pouring concrete, and removing the formwork after the concrete has set.
It is a fast and efficient construction method commonly used for high-rise buildings and large residential projects.
The system allows for smooth finishes...
posted on 5 May 2023
I applied via Recruitment Consulltant and was interviewed before May 2022. There were 2 interview rounds.
I have extensive commercial experience related to client billing.
Managed client billing for a software company, ensuring timely and accurate invoicing
Developed and implemented billing processes for a consulting firm, resulting in a 20% increase in revenue
Collaborated with sales team to resolve billing discrepancies and improve client satisfaction
I applied via Walk-in and was interviewed in Apr 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
Grade of concrete at site refers to the strength of the concrete mix used in construction.
Grade of concrete is specified by its compressive strength in megapascals (MPa) at 28 days.
Common grades of concrete include M20, M25, M30, etc.
Higher grade concrete indicates higher strength and durability.
The grade of concrete is determined by the mix design and testing of samples.
For example, M25 grade concrete has a compressiv...
Executive Accountant
6
salaries
| ₹3.5 L/yr - ₹5.2 L/yr |
Assistant Manager
5
salaries
| ₹5.7 L/yr - ₹6.6 L/yr |
Civil Engineer
5
salaries
| ₹2.1 L/yr - ₹7.4 L/yr |
Senior Civil Engineer
4
salaries
| ₹5 L/yr - ₹7 L/yr |
Mechanical Engineer
4
salaries
| ₹4.2 L/yr - ₹6.4 L/yr |
Lea Associates South Asia
R.V.R. PROJECTS
ABCI Infrastructures
VIKRAN Engineering & Exim