Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by VIKRAN Engineering & Exim Team. If you also belong to the team, you can get access from here

VIKRAN Engineering & Exim Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

VIKRAN Engineering & Exim Deputy Manager Interview Questions and Answers

Updated 29 May 2025

VIKRAN Engineering & Exim Deputy Manager Interview Experiences

2 interviews found

Deputy Manager Interview Questions & Answers

user image sai krishna kaushik yendamuri

posted on 29 May 2025

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before May 2024, where I was asked the following questions.

  • Q1. Basic technical
  • Q2. Collection process

I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. How we define daviation of line and spotting of towers, major statuary clerance and their proposal and clearance proposals
  • Ans. 

    Deviation of line and spotting of towers refer to the process of ensuring proper clearance for power lines and structures.

    • Deviation of line refers to the process of ensuring that power lines follow a safe and efficient path.

    • Spotting of towers involves determining the optimal location for power line towers to ensure proper clearance.

    • Major statutory clearance refers to the minimum distance required between power lines an...

  • Answered by AI
  • Q2. Where is your strengths of transmission line construction activity and why?
  • Ans. 

    My strengths in transmission line construction activity lie in my experience in managing large-scale projects and ensuring adherence to safety standards.

    • Experience in managing large-scale transmission line construction projects

    • Expertise in ensuring adherence to safety standards and regulations

    • Ability to coordinate with cross-functional teams and stakeholders

    • Strong problem-solving and decision-making skills

    • Familiarity w...

  • Answered by AI
  • Q3. Why are you left your current employer

Interview Preparation Tips

Interview preparation tips for other job seekers - Ask what you, dont give incomplete answer

Deputy Manager Interview Questions Asked at Other Companies

asked in HDFC Bank
Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with u ... read more
Q2. How would you sell our products to your existing clients?
asked in ICICI Bank
Q3. What are the important ratios you would check to sanction a loan ... read more
Q4. What actions do you take when there is a shortage of materials re ... read more
asked in ICICI Bank
Q5. Which do you prioritize: quality or quantity, and why?

Top trending discussions

View All
Interview Hub
4d (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about VIKRAN Engineering & Exim?
Ask anonymously on communities.

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Case study regarding water base plant

Interview Preparation Tips

Interview preparation tips for other job seekers - Go thoroughly in the case study part. They will check how your brain work

I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Explain compressor troubleshooting
  • Ans. 

    Compressor troubleshooting involves identifying and resolving issues with the compressor in a system.

    • Check for leaks in the system

    • Inspect the compressor for damage or wear

    • Check the electrical connections and wiring

    • Monitor the pressure and temperature readings

    • Clean or replace air filters

    • Check the oil level and quality

    • Inspect the belts and pulleys for wear or damage

  • Answered by AI
  • Q2. Prespare well and before interview make sure

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well and all types mechanical equipment
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. What is experience
Round 2 - Technical 

(1 Question)

  • Q1. Where did you worked
Round 3 - HR 

(1 Question)

  • Q1. What are your expectations
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Dec 2024, where I was asked the following questions.

  • Q1. Why you change
  • Ans. 

    I embrace change as a catalyst for growth, innovation, and improved team dynamics in a fast-paced environment.

    • Change fosters innovation; for example, implementing new technology improved our workflow efficiency by 30%.

    • Adapting to change enhances team collaboration; I led a team through a restructuring that resulted in a more cohesive unit.

    • Embracing change allows for personal growth; I took on new responsibilities that ...

  • Answered by AI
  • Q2. How much stable
Be interview-ready. Browse the most asked HR questions.
illustration image
Round 1 - One-on-one 

(1 Question)

  • Q1. Casual discuss about experience
Round 2 - Technical 

(1 Question)

  • Q1. Previous experience and logical scenarios

Interview Preparation Tips

Interview preparation tips for other job seekers - Brush up your resume skills
Stay confident. Go to the world and the best
Are these interview questions helpful?
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Not Selected

I appeared for an interview in Sep 2024, where I was asked the following questions.

  • Q1. What's your name ?
  • Ans. 

    My name is Alex Johnson, a dedicated professional with a passion for team leadership and fostering collaboration.

    • I have over 10 years of experience in team management.

    • Led a team of 15 in a successful project that increased productivity by 30%.

    • I believe in open communication and regularly hold team meetings to gather feedback.

  • Answered by AI
  • Q2. What's ur experience?

I applied via Recruitment Consulltant

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Electrical Construction Free Commissioning Activity
  • Q2. HV..MV..VSD.AFD.MCC.LV UPS.PP.PDP..LP..ELP Cable Meggering laying & glanding Termination. Testing equipments Motor Solo run testing
  • Ans. Electrical supervisor
  • Answered Anonymously
  • Q3. Earth pit testing free commissioning
  • Q4. Motor Solo Run Testing

Interview Preparation Tips

Interview preparation tips for other job seekers - Electrical Cunstruction Free commissioning Activity

I applied via Company Website and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - One-on-one 

(4 Questions)

  • Q1. How can do surveyor work?
  • Q2. How can do detail surveyor?
  • Q3. How can do layout and line level check?
  • Ans. 

    Layout and line level check can be done using various tools and techniques.

    • Use a theodolite or total station to measure angles and distances accurately.

    • Use a level to ensure that the ground is level and the lines are straight.

    • Use string lines and pegs to mark out the layout of the site.

    • Check the measurements and levels regularly to ensure accuracy.

    • Make adjustments as necessary to ensure that the layout and lines are co...

  • Answered by AI
  • Q4. What is surveyor work ?

Interview Preparation Tips

Interview preparation tips for other job seekers - My name is dinesh Shrestha i from Gorkha in Nepal i am surveyor cuntiune surveyor work 2 year .now surveyor work .thank you.

Skills evaluated in this interview

VIKRAN Engineering & Exim Interview FAQs

How to prepare for VIKRAN Engineering & Exim Deputy Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at VIKRAN Engineering & Exim. The most common topics and skills that interviewers at VIKRAN Engineering & Exim expect are Costing, Tendering, Account Opening, Attendance and Boq Preparation.
What are the top questions asked in VIKRAN Engineering & Exim Deputy Manager interview?

Some of the top questions asked at the VIKRAN Engineering & Exim Deputy Manager interview -

  1. How we define daviation of line and spotting of towers, major statuary clerance...read more
  2. Where is your strengths of transmission line construction activity and w...read more
  3. Collection proc...read more

Tell us how to improve this page.

Overall Interview Experience Rating

2.5/5

based on 2 interview experiences

Difficulty level

Moderate 100%

Duration

Less than 2 weeks 100%
View more
VIKRAN Engineering & Exim Deputy Manager Salary
based on 30 salaries
₹8.2 L/yr - ₹14 L/yr
7% more than the average Deputy Manager Salary in India
View more details

VIKRAN Engineering & Exim Deputy Manager Reviews and Ratings

based on 16 reviews

3.5/5

Rating in categories

2.7

Skill development

3.6

Work-life balance

2.7

Salary

3.0

Job security

2.8

Company culture

2.7

Promotions

2.9

Work satisfaction

Explore 16 Reviews and Ratings
Senior Engineer
66 salaries
unlock blur

₹3.3 L/yr - ₹7.8 L/yr

Assistant Manager
48 salaries
unlock blur

₹5.1 L/yr - ₹12 L/yr

Engineer
39 salaries
unlock blur

₹2.4 L/yr - ₹6.5 L/yr

Deputy Manager
30 salaries
unlock blur

₹8.2 L/yr - ₹14 L/yr

Site Engineer
22 salaries
unlock blur

₹2.5 L/yr - ₹4.2 L/yr

Explore more salaries
Compare VIKRAN Engineering & Exim with

ABCI Infrastructures

3.4
Compare

The Louis Berger Group

4.3
Compare

Perkins

4.3
Compare

El Seif Engineering Contracting

4.1
Compare
write
Share an Interview