i
Tata
Power
Work with us
Proud winner of ABECA 2025 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Walk-in and was interviewed in Sep 2023. There was 1 interview round.
I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.
Top trending discussions
I appeared for an interview before May 2016.
I applied via Referral and was interviewed before Aug 2021. There were 2 interview rounds.
The Brayton cycle is a thermodynamic cycle that describes the workings of gas turbine engines, involving compression and expansion of air.
The Brayton cycle consists of four main processes: isentropic compression, isobaric heat addition, isentropic expansion, and isobaric heat rejection.
It is commonly used in jet engines and power plants, where air is compressed, heated, and then expanded to produce work.
The cycle opera...
Maintaining gas turbine speed is crucial for efficiency, performance, and safety in power generation and aviation applications.
Optimal speed ensures efficient fuel combustion, maximizing energy output.
Maintaining speed prevents mechanical stress and potential damage to turbine components.
In aviation, consistent turbine speed is vital for stable flight and engine performance.
Speed regulation helps in meeting grid demand...
I applied via Campus Placement and was interviewed in Aug 2023. There were 3 interview rounds.
There were a total of 60 technical questions asked
Maths, combinatorics, MCQs.
based on 3 interview experiences
Difficulty level
Duration
based on 6 reviews
Rating in categories
Lead Engineer
931
salaries
| ₹5.1 L/yr - ₹10.4 L/yr |
Team Lead
288
salaries
| ₹7.5 L/yr - ₹13.1 L/yr |
Assistant Manager
203
salaries
| ₹9 L/yr - ₹16.7 L/yr |
Graduate Engineer Trainee (Get)
159
salaries
| ₹5.5 L/yr - ₹7 L/yr |
Manager
148
salaries
| ₹14 L/yr - ₹24.9 L/yr |
Suzlon Group
Adani Group
NTPC
GE VERNOVA