Filter interviews by
I applied via Campus Placement
Pi cognitive Assessment test
I applied via Other
Yes
Proficient in reading and interpreting electrical diagrams
Familiarity with symbols, circuitry, and components used in electrical diagrams
Ability to understand wiring connections and troubleshoot electrical systems
Experience with schematic diagrams, block diagrams, and ladder logic diagrams
Knowledge of electrical codes and standards
Top trending discussions
posted on 16 Jan 2021
posted on 28 Mar 2024
posted on 28 Mar 2024
SDLC stands for Software Development Life Cycle, which is a process used by software development teams to design, develop, and test high-quality software.
SDLC consists of several phases including planning, analysis, design, implementation, testing, and maintenance.
Each phase has its own set of activities and deliverables to ensure the software meets the requirements and quality standards.
Examples of SDLC models include...
CAN protocol is a communication standard used in automotive and industrial applications.
CAN protocol stands for Controller Area Network
It is a message-based protocol used for communication between electronic control units (ECUs)
CAN protocol allows for high-speed communication and real-time data transmission
It is commonly used in automotive applications for functions such as engine control, transmission control, and bod...
posted on 31 Jan 2024
I applied via Recruitment Consulltant and was interviewed in Jul 2023. There were 2 interview rounds.
posted on 19 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There were 2 interview rounds.
Consists of 10 questions
Consists of 20 questions
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
Software testing methodologies are techniques used to test software for quality and functionality.
There are various testing methodologies such as Agile, Waterfall, and DevOps.
Agile methodology involves continuous testing and feedback throughout the development process.
Waterfall methodology involves testing at the end of each phase of development.
DevOps methodology involves testing in a continuous integration and delive...
posted on 9 Apr 2021
I applied via Naukri.com and was interviewed before Apr 2020. There were 4 interview rounds.
In case of Incomer failure, auxiliary supply can be restored by following these steps.
Check the power source and ensure it is functioning properly.
Identify the cause of the incomer failure and rectify it.
Switch to the backup power source.
Ensure that the auxiliary supply is stable and functioning properly.
Monitor the system to ensure that there are no further issues.
based on 1 interview experience
Bombardier Transportation
Indian Railway Catering and Tourism
Hyva
Linfox Logistics