Filter interviews by
I applied via Walk-in and was interviewed before Sep 2023. There was 1 interview round.
Possible causes and solutions for poor pickup issue in a vehicle
Causes: clogged air filter, dirty fuel injectors, faulty spark plugs, low fuel pressure
Solutions: replace air filter, clean fuel injectors, replace spark plugs, check fuel pump
Example: A clogged air filter can restrict airflow to the engine, leading to poor pickup
Potential causes of engine starting issues include battery problems, fuel issues, ignition system faults, and mechanical issues.
Weak or dead battery
Fuel pump failure
Clogged fuel filter
Faulty spark plugs
Ignition coil issues
Starter motor problems
Broken timing belt
Low engine compression
Regular maintenance, timely inspections, proper training for operators, using quality parts and components.
Regularly schedule maintenance checks to identify and address potential issues before they lead to breakdowns.
Train operators on proper vehicle usage and maintenance procedures to prevent unnecessary wear and tear.
Use high-quality parts and components during repairs to ensure longevity and reliability of the vehic...
Top trending discussions
posted on 23 Oct 2020
I applied via Recruitment Consultant and was interviewed in Apr 2020. There were 3 interview rounds.
posted on 14 Jul 2017
I appeared for an interview before Jul 2016.
posted on 16 Aug 2021
I applied via Naukri.com and was interviewed in Feb 2021. There were 4 interview rounds.
Engine overhauling is performed when the engine is worn out or experiencing significant performance issues.
Engine overhauling is done to restore the engine's performance and extend its lifespan.
It is typically performed after a certain number of operating hours or when specific symptoms are observed.
Half engine overhauling involves disassembling and inspecting only half of the engine components, while full engine overh...
Earth compaction machinery commonly used at construction sites include vibratory rollers, plate compactors, and pneumatic compactors.
Vibratory rollers are heavy-duty machines that use vibrating drums to compact soil and asphalt.
Plate compactors are smaller machines with a flat plate that vibrates to compact soil and granular materials.
Pneumatic compactors use rubber tires or pads to compact soil and are often used for ...
I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Company Website
posted on 20 Dec 2020
I applied via Naukri.com and was interviewed in Nov 2020. There was 1 interview round.
The percentage of bitumen in DBM varies depending on the specific mix design and project requirements.
DBM stands for Dense Bituminous Macadam, which is a type of road construction material.
The percentage of bitumen in DBM typically ranges from 4% to 6% by weight.
The exact percentage of bitumen is determined based on factors such as traffic load, climate conditions, and desired durability.
Higher percentages of bitumen a...
I seek new challenges and opportunities for growth that align with my career goals and values.
Desire for professional growth: I want to work on more complex projects that challenge my skills.
Alignment with company values: I admire your company's commitment to innovation and sustainability.
Seeking a collaborative environment: I thrive in teams that encourage knowledge sharing and creativity.
Career advancement opportunit...
posted on 7 Aug 2021
I applied via Company Website and was interviewed in Feb 2021. There were 5 interview rounds.
I applied via Walk-in and was interviewed in Jun 2023. There were 2 interview rounds.
The process of making a minor bridge involves planning, design, construction, and inspection.
1. Planning phase involves determining the location, size, and type of bridge needed.
2. Design phase includes creating detailed drawings and calculations for the bridge structure.
3. Construction phase involves building the foundation, supports, and deck of the bridge.
4. Inspection phase ensures the bridge meets safety and quali...
Piling point can be assured by conducting thorough soil investigation, using appropriate piling equipment, and monitoring the piling process.
Conduct soil investigation to determine soil conditions and suitability for piling.
Select appropriate piling equipment based on soil conditions and project requirements.
Monitor the piling process to ensure proper installation and alignment of piles.
Perform load tests on completed ...
Some of the top questions asked at the Universal Contractors And Engineers Mechanical Engineer interview -
based on 1 interview experience
Difficulty level
Duration
based on 1 review
Rating in categories
Civil Site Engineer
13
salaries
| ₹1.8 L/yr - ₹3.5 L/yr |
Billing Engineer
8
salaries
| ₹4.9 L/yr - ₹9.7 L/yr |
Project Manager
5
salaries
| ₹10.7 L/yr - ₹14.7 L/yr |
Billing Manager
5
salaries
| ₹7.8 L/yr - ₹11 L/yr |
Planning & Billing Engineer
5
salaries
| ₹7.4 L/yr - ₹11.6 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies