Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Varroc Group Team. If you also belong to the team, you can get access from here

Varroc Group Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Varroc Group Production Engineer Interview Questions and Answers

Updated 1 Jul 2025

Varroc Group Production Engineer Interview Experiences

7 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
  • Q1. Type of material & pridrying temp
  • Ans. 

    Material type and pre-drying temperature are crucial for optimizing production processes and ensuring product quality.

    • Different materials require specific pre-drying temperatures to remove moisture effectively.

    • For example, thermoplastics like ABS may need pre-drying at 80°C to prevent defects.

    • Metals often require lower pre-drying temperatures to avoid warping or oxidation.

    • Ceramics typically need higher temperatures, ar...

  • Answered by AI
  • Q2. Company manufacturing production targets related.

Interview Preparation Tips

Interview preparation tips for other job seekers - Company manufacturing production quality properly
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I appeared for an interview in Jan 2025, where I was asked the following questions.

  • Q1. How many years of experience do you have in the production department?
  • Ans. 

    I have over 5 years of experience in the production department, focusing on process optimization and team management.

    • Led a team of 10 in a manufacturing plant, improving production efficiency by 20%.

    • Implemented lean manufacturing techniques that reduced waste and increased output.

    • Conducted regular training sessions for staff on safety protocols and equipment handling.

    • Collaborated with quality assurance to ensure produc...

  • Answered by AI
  • Q2. What is machine monitoring?
  • Ans. 

    Machine monitoring involves tracking the performance and condition of machinery to optimize operations and prevent failures.

    • Real-time data collection: Sensors gather data on machine performance, such as speed, temperature, and vibration.

    • Predictive maintenance: Analyzing data trends helps predict when maintenance is needed, reducing downtime.

    • Efficiency tracking: Monitoring helps identify inefficiencies in production pro...

  • Answered by AI

Production Engineer Interview Questions Asked at Other Companies

Q1. How do you detect faults in robots?
asked in Foxconn
Q2. If product A fails in the last stage, what is the root cause?
Q3. Did you know about soldering and what is the criteria for solderi ... read more
Q4. What is the minimum value that can be measured by a vernier calip ... read more
Q5. What is the difference between mass production and batch producti ... read more
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Recruitment Consulltant

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Basic mechanical engineering
  • Q2. Field related basic question
  • Q3. How many installation done
  • Ans. 

    I have completed 15 installations in the past year for various projects.

    • Completed 15 installations in the past year

    • Installed equipment for projects such as XYZ and ABC

    • Ensured proper functioning of installations through testing and maintenance

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. Roles and responsibility

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Why you choose this engineering feild ?

Production Engineer Interview Questions & Answers

user image Praveen Kumar Singh

posted on 19 Mar 2025

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. General question like what is your roll and responsibility in your previous organization
  • Q2. Reson for leaving

I applied via Campus Placement and was interviewed in Oct 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Injection moulding machine full processing

Interview Preparation Tips

Interview preparation tips for other job seekers - Good information basic knowledge by injection molding machine

Varroc Group HR Interview Questions

26 questions and answers

Q. How do you approach your work?
Q. How many years of experience do you have in the production department?
Q. Why are you leaving your current company?

Interview Questionnaire 

1 Question

  • Q1. Forging production

Interview Preparation Tips

Interview preparation tips for other job seekers - All producation problem solve
Are these interview questions helpful?

Top trending discussions

View All
Interview Hub
1w (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about Varroc Group?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Walk-in and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

8 Questions

  • Q1. Tell me about yourself.
  • Ans. 

    I am a production engineer with experience in optimizing manufacturing processes and ensuring efficient production.

    • Experienced production engineer

    • Skilled in optimizing manufacturing processes

    • Ensuring efficient production

    • Strong knowledge of production equipment and technologies

    • Proficient in analyzing data and implementing improvements

    • Collaborative team player

  • Answered by AI
  • Q2. What is your position in previous company ?
  • Ans. 

    I was a Senior Production Engineer in my previous company.

    • I held the position of Senior Production Engineer.

    • I was responsible for overseeing production processes and ensuring efficiency.

    • I worked closely with the production team to identify and resolve any issues.

    • I implemented improvements to optimize production output and reduce costs.

    • I collaborated with other departments to coordinate production schedules and meet dea...

  • Answered by AI
  • Q3. What is your role in it ?
  • Ans. 

    As a Production Engineer, my role is to oversee the manufacturing process, optimize production efficiency, and ensure quality control.

    • Overseeing the manufacturing process

    • Optimizing production efficiency

    • Ensuring quality control

    • Identifying and resolving production issues

    • Implementing process improvements

    • Collaborating with cross-functional teams

    • Monitoring production metrics and analyzing data

    • Creating and maintaining produc...

  • Answered by AI
  • Q4. As a Jr. Quality Engineer. I have checked raw materials inspection, Dimensional inspection of job with respect to revised drawings, Leak test of job, Blasting & painting , And quality related issues with t...
  • Q5. What is the full form of DFT in painting ?
  • Q6. Dry Film Thickness.
  • Ans. 

    Dry film thickness refers to the thickness of a coating after it has dried and cured.

    • It is measured using a coating thickness gauge.

    • It is important to ensure that the dry film thickness meets the specifications for the coating.

    • The dry film thickness can affect the performance and durability of the coating.

    • Examples of coatings that require specific dry film thickness include paint, powder coating, and plating.

    • Dry film t...

  • Answered by AI
  • Q7. What if the DFT is more than requirement ?
  • Ans. 

    Excess DFT can lead to increased cost and longer production time.

    • Excess DFT can lead to increased material usage and waste.

    • It can also lead to longer production time and increased cost.

    • The excess DFT may also affect the performance and durability of the product.

    • It is important to ensure that the DFT is within the specified range to avoid these issues.

  • Answered by AI
  • Q8. There is a peel off and rundown in the job as DFT is more than requirement.

Interview Preparation Tips

Interview preparation tips for other job seekers - As per my opinion. Prepare your previous job experiene and basic knowledge of your respective department.

I applied via Referral and was interviewed in Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Tell me about your self
  • Q2. About me which is not in resume
  • Ans. 

    I am a passionate engineer with a knack for problem-solving and a love for continuous learning beyond my resume.

    • I enjoy woodworking as a hobby, which enhances my attention to detail and creativity.

    • I have volunteered for local community projects, helping to design and build sustainable solutions.

    • I am an avid reader of engineering journals, keeping myself updated with the latest industry trends and technologies.

    • I have a ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Fully confidence and feel free during interview and please Don't be nervous.

I applied via Recruitment Consulltant and was interviewed in Jul 2021. There was 1 interview round.

Round 1 - HR 

(7 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Share details of your previous job.
  • Q4. Why should we hire you?
  • Q5. Why are you looking for a change?
  • Q6. What are your strengths and weaknesses?
  • Q7. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Hurry up my interview please sir

Varroc Group Interview FAQs

How many rounds are there in Varroc Group Production Engineer interview?
Varroc Group interview process usually has 2 rounds. The most common rounds in the Varroc Group interview process are Resume Shortlist, Technical and One-on-one Round.
How to prepare for Varroc Group Production Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Varroc Group. The most common topics and skills that interviewers at Varroc Group expect are Manpower Handling, Paint Shop, Powder Coating and Production Supervising.
What are the top questions asked in Varroc Group Production Engineer interview?

Some of the top questions asked at the Varroc Group Production Engineer interview -

  1. How many installation d...read more
  2. What is machine monitori...read more
  3. Type of material & pridrying t...read more

Tell us how to improve this page.

Overall Interview Experience Rating

3.9/5

based on 7 interview experiences

Difficulty level

Moderate 100%

Duration

4-6 weeks 100%
View more
Varroc Group Production Engineer Salary
based on 234 salaries
₹2.2 L/yr - ₹6.5 L/yr
11% more than the average Production Engineer Salary in India
View more details

Varroc Group Production Engineer Reviews and Ratings

based on 82 reviews

3.8/5

Rating in categories

3.5

Skill development

3.4

Work-life balance

3.5

Salary

3.3

Job security

3.5

Company culture

3.1

Promotions

3.4

Work satisfaction

Explore 82 Reviews and Ratings
Quality Engineer
305 salaries
unlock blur

₹1.9 L/yr - ₹5.8 L/yr

Senior Engineer
258 salaries
unlock blur

₹3.8 L/yr - ₹8.3 L/yr

Production Engineer
234 salaries
unlock blur

₹2.2 L/yr - ₹6.5 L/yr

Assistant Manager
233 salaries
unlock blur

₹6 L/yr - ₹13.9 L/yr

Engineer
201 salaries
unlock blur

₹3.3 L/yr - ₹7.5 L/yr

Explore more salaries
Compare Varroc Group with

JBM Group

3.9
Compare

Subros

3.8
Compare

UNO Minda

3.9
Compare

Apollo Tyres

4.0
Compare
write
Share an Interview