i
Vcs Quality
Services
Filter interviews by
I appeared for an interview before Aug 2024, where I was asked the following questions.
Detail-oriented Office Manager with 5 years of experience in administrative support and team coordination.
Experienced in managing office operations, including scheduling and inventory management.
Skilled in using software like Microsoft Office Suite and project management tools.
Proven ability to improve office efficiency by implementing new filing systems.
Strong communication skills, facilitating effective collaboration...
I expect a competitive salary based on my experience and the industry standards for an Office Manager role.
Research industry standards: For example, the average salary for an Office Manager in my area is $50,000 to $60,000.
Consider my experience: With over 5 years in office management, I believe a salary on the higher end is justified.
Flexibility: I am open to discussing a salary range that reflects my skills and the r...
Yes, I am comfortable traveling for work and see it as an opportunity to enhance my skills and contribute to the team.
I have previously traveled for work-related conferences, which helped me network and learn new skills.
I am adaptable and can manage travel logistics efficiently, ensuring minimal disruption to my work.
Traveling allows me to engage with clients and team members in person, fostering better relationships.
Top trending discussions
I applied via LinkedIn and was interviewed before Apr 2021. There were 5 interview rounds.
Industrial Knowledge
I applied via Campus Placement and was interviewed before Jul 2020. There was 1 interview round.
I applied via Company Website and was interviewed before Jul 2021. There were 3 interview rounds.
I applied via Referral and was interviewed before Jul 2021. There were 3 interview rounds.
General information about electronic products which is used in daily life and technical questions related about the electronic equipments.
posted on 4 Dec 2021
I applied via Company Website and was interviewed in Jun 2021. There were 3 interview rounds.
To find bearing details from bearing number, refer to bearing catalogs or manufacturer's website.
Refer to bearing catalogs or manufacturer's website for detailed information
Search for the bearing number on the manufacturer's website to find specifications, dimensions, load ratings, and other details
Consult the bearing catalog to understand the type of bearing, its construction, and its applications
Contact the manufactu...
Coal yard management involves efficient handling, storage, and transportation of coal.
Ensure proper storage and handling of coal to prevent contamination and loss
Implement safety measures to prevent accidents and injuries
Regularly inspect and maintain equipment to ensure smooth operations
Monitor coal inventory and plan for timely replenishment
Coordinate with suppliers and transporters for timely delivery of coal
Impleme...
SCC stands for Social Cost of Carbon and is calculated by estimating the economic damages caused by each ton of carbon dioxide emissions.
SCC is calculated by estimating the economic damages caused by each ton of carbon dioxide emissions
It takes into account the long-term effects of climate change on agriculture, health, property damage, and other factors
The SCC value is used to determine the cost-effectiveness of polic...
posted on 9 Oct 2024
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
The main reason for belt joint failure is usually due to improper installation or maintenance.
Improper installation of the belt joint, such as incorrect alignment or tensioning
Lack of proper maintenance, leading to wear and tear of the joint
Use of low-quality materials for the joint
Excessive load or stress on the belt joint
Environmental factors like temperature or humidity affecting the joint
The alignment maximum tolerance refers to the maximum allowable deviation from the specified alignment.
Alignment maximum tolerance is the maximum allowable deviation from the specified alignment.
It is typically expressed in terms of a percentage or a specific measurement unit.
For example, a machine part may have an alignment maximum tolerance of +/- 0.005 inches.
Exceeding the alignment maximum tolerance can lead to per...
To replace the bucket wheel reclaimer luffing cylinder, follow these steps.
1. Shut down the machine and ensure all power sources are disconnected.
2. Remove any surrounding components that may obstruct access to the luffing cylinder.
3. Use appropriate tools to disconnect the hydraulic hoses and fittings from the cylinder.
4. Support the weight of the cylinder as it is removed to prevent damage to surrounding components.
5...
JSA stands for Job Safety Analysis, focusing on specific job tasks, while HIRA stands for Hazard Identification and Risk Assessment, focusing on overall workplace hazards.
JSA is task-specific, focusing on individual job tasks and potential hazards
HIRA is broader, looking at overall workplace hazards and assessing risks
JSA involves breaking down a job into steps and identifying potential hazards for each step
HIRA involv...
To create a PR in SAP, you can use transaction code ME51N or ME21N.
Use transaction code ME51N to create a purchase requisition in SAP.
Enter the necessary details such as material, quantity, delivery date, etc.
Save the purchase requisition and it will be created in the system.
Alternatively, you can also use transaction code ME21N to create a purchase order directly.
The procedure of pulley replacement involves identifying the faulty pulley, removing the old pulley, installing the new pulley, and testing the system.
Identify the faulty pulley by checking for any signs of wear or damage.
Use appropriate tools to remove the old pulley, such as a pulley puller or wrench.
Install the new pulley by aligning it properly and securing it in place.
Test the system to ensure the new pulley is fu...
PTW stands for Permit to Work, a procedure used to ensure that work is carried out safely in potentially hazardous environments.
PTW is a formal written system used to control certain types of work that are identified as potentially hazardous.
Before starting work, a permit must be obtained from a designated authority.
The permit outlines the work to be done, the hazards involved, and the necessary precautions to be taken...
based on 1 interview experience
Difficulty level
Duration
Senior Engineer
107
salaries
| ₹3.8 L/yr - ₹7 L/yr |
Site Engineer
30
salaries
| ₹3.7 L/yr - ₹6 L/yr |
Project Management Consultant
29
salaries
| ₹3.6 L/yr - ₹5.6 L/yr |
Inspection Engineer
29
salaries
| ₹3.3 L/yr - ₹7.2 L/yr |
Senior Inspection Engineer
15
salaries
| ₹6 L/yr - ₹8.4 L/yr |
Reliance Industries
Oil And Natural Gas Corporation
Sterling Oil Exploration & Energy Production
NTPC GE Power Services