Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Vcs Quality Services Team. If you also belong to the team, you can get access from here

Vcs Quality Services Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Vcs Quality Services IT Infrastructure Manager Interview Questions and Answers

Updated 19 Dec 2023

Vcs Quality Services IT Infrastructure Manager Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Peronal details & Previous work Experience
Round 2 - Technical 

(1 Question)

  • Q1. IT Network Related & IT Operation related
Round 3 - Group Discussion 

HR With Technical Round

Interview Preparation Tips

Interview preparation tips for other job seekers - Should be confident & to the point answer

Top trending discussions

View All
Interview Hub
1w (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about Vcs Quality Services?
Ask anonymously on communities.

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Technical questions related to inventory,scm and stock management

Interview Preparation Tips

Round: Resume Shortlist
Experience: Experience and key skills

IT Infrastructure Manager Interview Questions Asked at Other Companies

Q1. What is your plan to manage increased load during festival times ... read more
Q2. Tell me about your technical and managerial experience.
Q3. How are you managing the IT infrastructure in your current compan ... read more
Q4. What are the best practices for data center management and cybers ... read more
Q5. The first round will be with the IT Infrastructure Head, focusing ... read more

I applied via LinkedIn and was interviewed before Apr 2021. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Assignment 

Industrial Knowledge

Round 3 - HR 

(1 Question)

  • Q1. Salary structure and working experience
Round 4 - One-on-one 

(1 Question)

  • Q1. Deep Drive on my experience, family members, education and futures aspects
Round 5 - HR 

(1 Question)

  • Q1. Salary negotiation and work location

Interview Preparation Tips

Interview preparation tips for other job seekers - Please share your thoughts and futures aspects as per your career goals openly at the time of interview

I applied via Company Website and was interviewed in Jan 2022. There was 0 interview round.

Interview Preparation Tips

Topics to prepare for Reliance Industries Software Engineer interview:
  • Computer Operating
Interview preparation tips for other job seekers - Amazing nd nic interview.first Round in subpurb

I applied via Campus Placement and was interviewed before Jul 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Whats your long terms goal towards organization.

Interview Preparation Tips

Interview preparation tips for other job seekers - Confidence

I applied via Company Website and was interviewed before Jul 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Questions related to Communication,computer networks,electromagnetic field theory,microprocessors were asked
Round 3 - HR 

(1 Question)

  • Q1. Introduction Why should we hire you What changes would you make if you were given a chance to join the company.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be clear with your basics.
Dont try to give absurd answers if you dont know anything about it.
Be interview-ready. Browse the most asked HR questions.
illustration image

Interview Questionnaire 

1 Question

  • Q1. About the work experience
Are these interview questions helpful?

I applied via Referral and was interviewed before Jul 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Aptitude Test 

General information about electronic products which is used in daily life and technical questions related about the electronic equipments.

Round 3 - HR 

(1 Question)

  • Q1. Information about yourself and Negotiation about LPA

Interview Preparation Tips

Interview preparation tips for other job seekers - Just go for it nothing is impossible to get.

Interview Questionnaire 

1 Question

  • Q1. Question was related to turbine interlock and CMC

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was good taken by NTPC panel and they want to know basic concepts and they also want to know about process knowledge

I applied via Company Website and was interviewed in Jun 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. How to find bearings details from bearing number.
  • Ans. 

    To find bearing details from bearing number, refer to bearing catalogs or manufacturer's website.

    • Refer to bearing catalogs or manufacturer's website for detailed information

    • Search for the bearing number on the manufacturer's website to find specifications, dimensions, load ratings, and other details

    • Consult the bearing catalog to understand the type of bearing, its construction, and its applications

    • Contact the manufactu...

  • Answered by AI
  • Q2. How to coal yard management ?
  • Ans. 

    Coal yard management involves efficient handling, storage, and transportation of coal.

    • Ensure proper storage and handling of coal to prevent contamination and loss

    • Implement safety measures to prevent accidents and injuries

    • Regularly inspect and maintain equipment to ensure smooth operations

    • Monitor coal inventory and plan for timely replenishment

    • Coordinate with suppliers and transporters for timely delivery of coal

    • Impleme...

  • Answered by AI
  • Q3. How to calculate SCC
  • Ans. 

    SCC stands for Social Cost of Carbon and is calculated by estimating the economic damages caused by each ton of carbon dioxide emissions.

    • SCC is calculated by estimating the economic damages caused by each ton of carbon dioxide emissions

    • It takes into account the long-term effects of climate change on agriculture, health, property damage, and other factors

    • The SCC value is used to determine the cost-effectiveness of polic...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - * just answer cool mind & just look over the coal handling consumption.

Skills evaluated in this interview

Vcs Quality Services Interview FAQs

How many rounds are there in Vcs Quality Services IT Infrastructure Manager interview?
Vcs Quality Services interview process usually has 4 rounds. The most common rounds in the Vcs Quality Services interview process are Resume Shortlist, HR and Technical.

Tell us how to improve this page.

Overall Interview Experience Rating

5/5

based on 1 interview experience

Difficulty level

Moderate 100%

Duration

Less than 2 weeks 100%
View more
Senior Engineer
107 salaries
unlock blur

₹3.8 L/yr - ₹7 L/yr

Site Engineer
30 salaries
unlock blur

₹3.7 L/yr - ₹6 L/yr

Project Management Consultant
29 salaries
unlock blur

₹3.6 L/yr - ₹5.6 L/yr

Inspection Engineer
29 salaries
unlock blur

₹3.3 L/yr - ₹7.2 L/yr

Senior Inspection Engineer
15 salaries
unlock blur

₹6 L/yr - ₹8.4 L/yr

Explore more salaries
Compare Vcs Quality Services with

Reliance Industries

4.0
Compare

Oil And Natural Gas Corporation

4.4
Compare

Sterling Oil Exploration & Energy Production

3.6
Compare

NTPC GE Power Services

3.9
Compare
write
Share an Interview