i
WSP
Filter interviews by
Client input for BIM Technician - ELV includes project requirements, specifications, and design preferences.
Project Requirements: Clients provide detailed descriptions of their needs, such as the type of ELV systems required (e.g., CCTV, access control).
Specifications: Clients may specify technical standards or compliance requirements that the ELV systems must meet.
Design Preferences: Clients often share their vis...
Dialux software uses various file types for project management, lighting design, and data export.
DIALUX project files (.dialux) - Main files containing the lighting design project.
DIALUX export files (.dxf, .dwg) - Used for exporting designs to CAD software.
Image files (.jpg, .png) - For saving rendered images of lighting simulations.
Report files (.pdf) - For generating and exporting detailed reports of the lighti...
Effective coordination of electrical services with MEP systems in ceiling voids ensures functionality and safety in building design.
Use of 3D BIM models to visualize spatial relationships between electrical, mechanical, and plumbing systems.
Regular coordination meetings among MEP teams to discuss potential clashes and resolve them early in the design phase.
Implementation of clash detection software to identify con...
An extension of time is a formal request to prolong project deadlines due to unforeseen circumstances.
An extension of time is typically requested when delays occur due to factors beyond the contractor's control.
Examples include adverse weather conditions, supply chain disruptions, or changes in project scope.
Communication with the client involves providing detailed documentation of the reasons for the delay.
I woul...
A network diagram visually represents project tasks, their dependencies, and the sequence of activities.
Illustrates the flow of tasks in a project.
Helps identify critical paths and dependencies.
Common types include PERT and CPM diagrams.
Example: A construction project showing tasks like design, permits, and building phases.
The Spotlight feature enhances user experience by providing focused insights and streamlined navigation within applications.
Offers contextual information based on user actions, improving decision-making.
Facilitates quick access to relevant data, reducing time spent searching.
Can highlight key performance indicators (KPIs) for project tracking.
Example: In project management software, it may spotlight overdue tasks ...
OBS (Organizational Breakdown Structure) and EPS (Enterprise Project Structure) are frameworks for project management organization.
OBS defines the hierarchy of the organization involved in the project, showing roles and responsibilities.
EPS outlines the overall structure of projects within an organization, including all projects and their relationships.
Example of OBS: A project team may include a project manager, ...
The S curve is a graphical representation of project progress over time, showing cumulative costs or work completed.
1. Define the project scope and timeline to establish baseline data.
2. In Primavera P6, use the 'Earned Value' feature to track progress.
3. Create a cumulative cost curve by plotting actual vs. planned costs over time.
4. In Excel, use a line chart to visualize cumulative data points for planned and a...
Creating an S-curve involves plotting project progress over time to visualize performance against the planned schedule.
1. In Primavera P6, go to the 'Reports' section and select 'S-Curve'.
2. Choose the desired project and set the time frame for the S-curve.
3. Select the data to be plotted, such as planned vs. actual progress.
4. Generate the report and export it to Excel if needed.
5. In Excel, create a line chart u...
The S curve represents project progress over time, illustrating cumulative work against time in a graphical format.
Visual representation of project progress, showing phases of growth.
Typically shaped like an 'S', indicating slow start, rapid growth, and leveling off.
Used in project management to track performance and forecast completion.
Example: In construction, the S curve can show the cumulative costs versus tim...
I applied via Campus Placement and was interviewed before Sep 2023. There were 3 interview rounds.
A floor plan was given to design the electrical circuiting , small power etc.
Fire alarm systems detect smoke and heat, alerting occupants and enabling timely evacuation to ensure safety.
Components include smoke detectors, heat detectors, and alarm panels.
Types of smoke detectors: ionization (fast response to flaming fires) and photoelectric (better for smoldering fires).
Fire alarm systems can be manual (pull stations) or automatic (detectors triggering alarms).
Integration with sprinkler systems...
I appeared for an interview in Mar 2025, where I was asked the following questions.
Client input for BIM Technician - ELV includes project requirements, specifications, and design preferences.
Project Requirements: Clients provide detailed descriptions of their needs, such as the type of ELV systems required (e.g., CCTV, access control).
Specifications: Clients may specify technical standards or compliance requirements that the ELV systems must meet.
Design Preferences: Clients often share their vision f...
Dialux software uses various file types for project management, lighting design, and data export.
DIALUX project files (.dialux) - Main files containing the lighting design project.
DIALUX export files (.dxf, .dwg) - Used for exporting designs to CAD software.
Image files (.jpg, .png) - For saving rendered images of lighting simulations.
Report files (.pdf) - For generating and exporting detailed reports of the lighting an...
ELV services encompass low-voltage systems for communication, security, and automation in buildings.
1. CCTV (Closed-Circuit Television) - Used for surveillance and security monitoring.
2. Access Control Systems - Manages entry to buildings or specific areas, e.g., card readers.
3. Fire Alarm Systems - Detects smoke or fire and alerts occupants, e.g., smoke detectors.
4. Public Address Systems - For announcements and emerg...
Smart Circuiting automates circuit design in Revit, enhancing efficiency over manual methods.
Smart Circuiting uses algorithms to automatically assign circuits based on load requirements.
Manual Circuiting requires users to manually select and assign circuits, which is time-consuming.
Smart Circuiting can quickly adapt to changes in the model, while manual methods require rework.
For example, if a new device is added, Smar...
Effective coordination of electrical services with MEP systems in ceiling voids ensures functionality and safety in building design.
Use of 3D BIM models to visualize spatial relationships between electrical, mechanical, and plumbing systems.
Regular coordination meetings among MEP teams to discuss potential clashes and resolve them early in the design phase.
Implementation of clash detection software to identify conflict...
I applied via Campus Placement and was interviewed in Nov 2024. There were 3 interview rounds.
Normal to medium level general aptitude questions
I appeared for an interview in Jul 2025, where I was asked the following questions.
I want to join WSP for its commitment to innovation, sustainability, and professional growth in engineering and environmental solutions.
WSP's focus on sustainability aligns with my passion for environmentally responsible engineering, as seen in projects like the Green Building initiatives.
The opportunity to work on diverse projects globally excites me, such as the Crossrail project in London, which showcases cutting-ed...
I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.
I applied via LinkedIn and was interviewed in Sep 2024. There were 2 interview rounds.
Moment and shear connections are critical in steel structures for transferring loads between members.
Moment connections transfer bending forces between beams and columns
Shear connections transfer shear forces between beams and columns
Common types of moment connections include bolted end plate connections and welded connections
Common types of shear connections include bolted shear tabs and welded shear plates
I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.
I appeared for an interview in Sep 2024.
I applied via Campus Placement
There will be 30 questions mainly focus on data interpretation
WSP is a global engineering professional services firm that provides a wide range of projects in various sectors.
WSP has worked on transportation projects such as the California High-Speed Rail and the Sydney Metro
They have also been involved in environmental projects like the Thames Tideway Tunnel in London
WSP has experience in building projects like the One World Trade Center in New York City
Top trending discussions
Some of the top questions asked at the WSP interview -
The duration of WSP interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 81 interview experiences
Difficulty level
Duration
Senior Engineer
109
salaries
| ₹15 L/yr - ₹25 L/yr |
BIM Modeller
104
salaries
| ₹5 L/yr - ₹12 L/yr |
Principal Engineer
101
salaries
| ₹22.5 L/yr - ₹36 L/yr |
Engineer
69
salaries
| ₹10 L/yr - ₹15 L/yr |
Assistant Engineer
65
salaries
| ₹6.5 L/yr - ₹11.2 L/yr |
Deloitte
Ernst & Young
PwC
ZS