Water treatment plant (STP)
Installation of all machines in Sewage Treatment Plant (STP) is crucial for its proper functioning.
Ensure proper layout and spacing for each machine to allow for easy maintenance and operation.
Follow manufacturer's guidelines for installation and connect all necessary utilities such as power and water supply.
Test each machine after installation to ensure it is functioning correctly.
Train staff on how to operate and mai...
I applied via Referral and was interviewed in Mar 2024. There was 1 interview round.
There are various types of gears used in mechanical engineering.
Spur gears: used for parallel shafts and have straight teeth.
Helical gears: used for parallel shafts and have angled teeth for smoother operation.
Bevel gears: used for perpendicular shafts and have conical teeth.
Worm gears: used for perpendicular shafts and have a worm-like screw and gear combination.
Planetary gears: used in gear systems with high torque a...
The amount of litter in one MLD varies depending on the type of litter and the specific MLD system.
The amount of litter in one MLD can range from a few grams to several kilograms.
The type of litter, such as plastic bottles, food waste, or paper, affects the volume and weight.
The efficiency of the MLD system in capturing and removing litter also plays a role.
For example, if the MLD system is designed to capture larger d...
Top trending discussions
posted on 24 Mar 2022
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
I applied via Referral and was interviewed in Dec 2020. There was 1 interview round.
posted on 12 Oct 2021
I applied via Walk-in and was interviewed in Apr 2021. There were 3 interview rounds.
posted on 4 Sep 2021
I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.
Deviation of line and spotting of towers refer to the process of ensuring proper clearance for power lines and structures.
Deviation of line refers to the process of ensuring that power lines follow a safe and efficient path.
Spotting of towers involves determining the optimal location for power line towers to ensure proper clearance.
Major statutory clearance refers to the minimum distance required between power lines an...
My strengths in transmission line construction activity lie in my experience in managing large-scale projects and ensuring adherence to safety standards.
Experience in managing large-scale transmission line construction projects
Expertise in ensuring adherence to safety standards and regulations
Ability to coordinate with cross-functional teams and stakeholders
Strong problem-solving and decision-making skills
Familiarity w...
posted on 29 May 2025
I appeared for an interview before May 2024, where I was asked the following questions.
posted on 10 Jun 2025
I appeared for an interview in May 2025, where I was asked the following questions.
I have extensive experience in rural electrification projects, focusing on sustainable energy solutions and community engagement.
Led a project in rural India that provided solar power to over 500 households, improving quality of life and local businesses.
Collaborated with local governments and NGOs to identify areas in need of electrification, ensuring community needs were met.
Implemented training programs for local te...
based on 2 interview experiences
Difficulty level
Duration
based on 30 reviews
Rating in categories
Site Engineer
8
salaries
| ₹1.8 L/yr - ₹4.2 L/yr |
Mechanical Engineer
6
salaries
| ₹1.7 L/yr - ₹4 L/yr |
Civil Engineer
5
salaries
| ₹1.9 L/yr - ₹4.3 L/yr |
Electrical Engineer
4
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Maintenance Engineer
4
salaries
| ₹1.8 L/yr - ₹3.7 L/yr |
Lea Associates South Asia
R.V.R. PROJECTS
McNally Bharat Engineering
ABCI Infrastructures