Filter interviews by
Supply chain management involves overseeing the flow of goods, information, and finances from production to consumption.
Involves coordination between suppliers, manufacturers, and retailers.
Example: A car manufacturer sourcing parts from various suppliers.
Focuses on optimizing efficiency and reducing costs.
Example: Just-in-time inventory systems to minimize storage costs.
Incorporates logistics, procurement, and in...
Planning management involves strategizing and organizing resources to achieve specific goals efficiently.
Defines objectives: Establishes clear, measurable goals for projects.
Resource allocation: Determines the best use of resources like time, money, and personnel.
Risk management: Identifies potential risks and develops mitigation strategies.
Timeline creation: Develops schedules to ensure timely completion of tasks...
Replenishing data involves proactive strategies to ensure timely updates and prevent delays in model clearance.
Implement automated data pipelines to ensure real-time data updates, reducing manual intervention.
Schedule regular data audits to identify gaps or outdated information, ensuring the model uses the most relevant data.
Utilize version control for datasets to track changes and quickly revert to previous versi...
Inventory types include raw materials, work-in-progress, finished goods, and maintenance, repair, and operations supplies.
Raw Materials: Basic materials used in production, e.g., steel for manufacturing cars.
Work-in-Progress (WIP): Items that are in the production process, e.g., partially assembled electronics.
Finished Goods: Completed products ready for sale, e.g., packaged food items.
Maintenance, Repair, and Ope...
Implementing proactive strategies can effectively reduce line shortages caused by material shortages and losses.
Conduct regular inventory audits to identify potential shortages early.
Establish strong relationships with multiple suppliers to ensure material availability.
Implement a just-in-time (JIT) inventory system to minimize excess and reduce waste.
Utilize technology for real-time tracking of materials to preve...
SMT (Surface Mount Technology) is a method for producing electronic circuits by mounting components directly onto the surface of PCBs.
SMT allows for higher component density on PCBs, enabling smaller devices.
Common SMT components include resistors, capacitors, and integrated circuits.
SMT is widely used in consumer electronics, such as smartphones and laptops.
The process involves solder paste application, component...
OEE (Overall Equipment Effectiveness) measures manufacturing productivity by evaluating availability, performance, and quality.
OEE = Availability x Performance x Quality.
Availability considers downtime; for example, if a machine is down for maintenance.
Performance measures the speed of production; for instance, if a machine produces 80 units/hour instead of 100.
Quality assesses the number of good units produced ve...
BOM stands for Bill of Materials, a list of raw materials, components, and assemblies needed to manufacture a product.
BOM helps in tracking inventory levels and managing production processes.
It includes details like part numbers, quantities, and descriptions of each item.
BOM can be hierarchical, with sub-assemblies listed under main assemblies.
Example: In a BOM for a bicycle, components like frame, wheels, pedals,...
Starters are devices used to control the starting and stopping of motors.
Starters provide protection to motors by preventing overload and short circuits.
There are different types of starters such as direct-on-line starters, star-delta starters, and soft starters.
Direct-on-line starters provide full voltage to the motor during start-up.
Star-delta starters initially connect the motor in star configuration to reduce ...
SMT process refers to the surface mount technology used in electronic manufacturing.
Involves placing electronic components directly onto the surface of a printed circuit board (PCB)
Uses pick-and-place machines, solder paste, and reflow ovens
Requires precise control of temperature, humidity, and cleanliness
Can be done with either leaded or lead-free solder
Commonly used in the production of smartphones, laptops, and...
I appeared for an interview in Jun 2025, where I was asked the following questions.
I appeared for an interview in Jan 2025, where I was asked the following questions.
Planning management involves strategizing and organizing resources to achieve specific goals efficiently.
Defines objectives: Establishes clear, measurable goals for projects.
Resource allocation: Determines the best use of resources like time, money, and personnel.
Risk management: Identifies potential risks and develops mitigation strategies.
Timeline creation: Develops schedules to ensure timely completion of tasks.
Moni...
Supply chain management involves overseeing the flow of goods, information, and finances from production to consumption.
Involves coordination between suppliers, manufacturers, and retailers.
Example: A car manufacturer sourcing parts from various suppliers.
Focuses on optimizing efficiency and reducing costs.
Example: Just-in-time inventory systems to minimize storage costs.
Incorporates logistics, procurement, and invento...
I applied via Walk-in and was interviewed in Mar 2024. There were 2 interview rounds.
SAP is a software company that provides enterprise resource planning solutions. Previous company experience includes working with SAP software.
SAP is a multinational software corporation known for its ERP software
Experience with SAP software may include implementing, customizing, or supporting SAP solutions
Previous company experience may involve working with SAP modules such as SAP HANA, SAP S/4HANA, SAP ERP, etc.
I applied via Job Fair and was interviewed in Nov 2023. There were 2 interview rounds.
Ha Mai handle kar leta hu
The voltage of panels refers to the electrical potential difference across the panels.
The voltage of panels is typically measured in volts (V).
It represents the amount of electrical potential energy per unit charge available in the panels.
The voltage of panels can vary depending on the specific application and design.
For example, solar panels typically have a voltage range of 12V to 48V.
Higher voltage panels are often ...
Load of Motorsports
Motorsports require a variety of loads to function properly.
Loads in motorsports can include the weight of the vehicle, aerodynamic forces, and mechanical resistance.
The load on motorsports components can vary depending on the specific discipline, such as drag racing, circuit racing, or off-road racing.
Understanding and managing the load is crucial for optimizing performance and ensuring safety in mo...
Ha maine collage me sikhaya gya tha
I appeared for an interview before Jul 2024, where I was asked the following questions.
Inventory types include raw materials, work-in-progress, finished goods, and maintenance, repair, and operations supplies.
Raw Materials: Basic materials used in production, e.g., steel for manufacturing cars.
Work-in-Progress (WIP): Items that are in the production process, e.g., partially assembled electronics.
Finished Goods: Completed products ready for sale, e.g., packaged food items.
Maintenance, Repair, and Operatio...
Replenishing data involves proactive strategies to ensure timely updates and prevent delays in model clearance.
Implement automated data pipelines to ensure real-time data updates, reducing manual intervention.
Schedule regular data audits to identify gaps or outdated information, ensuring the model uses the most relevant data.
Utilize version control for datasets to track changes and quickly revert to previous versions i...
Implementing proactive strategies can effectively reduce line shortages caused by material shortages and losses.
Conduct regular inventory audits to identify potential shortages early.
Establish strong relationships with multiple suppliers to ensure material availability.
Implement a just-in-time (JIT) inventory system to minimize excess and reduce waste.
Utilize technology for real-time tracking of materials to prevent lo...
I appeared for an interview before Mar 2024, where I was asked the following questions.
I appeared for an interview in Sep 2023.
BOM stands for Bill of Materials, a list of raw materials, components, and assemblies needed to manufacture a product.
BOM helps in tracking inventory levels and managing production processes.
It includes details like part numbers, quantities, and descriptions of each item.
BOM can be hierarchical, with sub-assemblies listed under main assemblies.
Example: In a BOM for a bicycle, components like frame, wheels, pedals, etc....
posted on 28 Sep 2023
I applied via Job Portal
Top trending discussions
The duration of Bhagwati Products interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 19 interview experiences
Difficulty level
Duration
based on 364 reviews
Rating in categories
Engineer
54
salaries
| ₹1.8 L/yr - ₹5.9 L/yr |
Assistant Manager
53
salaries
| ₹5 L/yr - ₹10.3 L/yr |
Quality Engineer
47
salaries
| ₹1.8 L/yr - ₹4.5 L/yr |
Senior Engineer
42
salaries
| ₹3.3 L/yr - ₹7.2 L/yr |
Production Engineer
42
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Samsung
HARMAN
LG Electronics
OPPO