i
Colliers
India
Filter interviews by
A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.
Shunt relay is connected in parallel with the main circuit of the ACB.
It detects overcurrents and activates to divert the excess current through a shunt path.
This helps in protecting the main circuit from damage due to overcurrents.
Shunt relays are commonly used in Air Circuit Breakers ...
A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.
Monitors voltage levels in electrical systems
Triggers alarm or protective action if voltage exceeds or falls below set threshold
Used to protect equipment from damage due to voltage fluctuations
Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.
Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.
Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.
BOD ...
CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.
CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.
It is often required in HVAC projects to ensure quality and compliance.
CoC may include details such as product specifications, testing results, and manufacturer information.
WTP plant works on the principle of physical and chemical processes to remove impurities from water.
Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.
Coagulation involves adding chemicals to water to make impurities clump together.
Flocculation helps in forming larger particles called floc for easier removal.
Sedimentation allows the floc to...
I provide daily and monthly reports on project progress, issues, and key metrics to track performance.
Daily reports include updates on tasks completed, challenges faced, and plans for the next day.
Monthly reports summarize overall progress, budget status, and any potential risks or delays.
Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource u...
I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.
A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.
Shunt relay is connected in parallel with the main circuit of the ACB.
It detects overcurrents and activates to divert the excess current through a shunt path.
This helps in protecting the main circuit from damage due to overcurrents.
Shunt relays are commonly used in Air Circuit Breakers (ACBs...
CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.
CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.
It is often required in HVAC projects to ensure quality and compliance.
CoC may include details such as product specifications, testing results, and manufacturer information.
Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.
Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.
Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.
BOD is a ...
A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.
Monitors voltage levels in electrical systems
Triggers alarm or protective action if voltage exceeds or falls below set threshold
Used to protect equipment from damage due to voltage fluctuations
WTP plant works on the principle of physical and chemical processes to remove impurities from water.
Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.
Coagulation involves adding chemicals to water to make impurities clump together.
Flocculation helps in forming larger particles called floc for easier removal.
Sedimentation allows the floc to sett...
I provide daily and monthly reports on project progress, issues, and key metrics to track performance.
Daily reports include updates on tasks completed, challenges faced, and plans for the next day.
Monthly reports summarize overall progress, budget status, and any potential risks or delays.
Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...
Top trending discussions
I applied via Naukri.com and was interviewed in May 2021. There were 4 interview rounds.
Dressing and personality
I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.
The structure work at the site involves the construction of a new building using steel beams and concrete columns.
Steel beams are being used for the framework of the building
Concrete columns are being installed to support the structure
The construction process includes pouring concrete, welding steel beams, and erecting walls
Managing site works involves overseeing construction activities, coordinating with contractors, ensuring safety regulations are followed, and meeting project deadlines.
Coordinate with contractors and subcontractors to ensure work is completed on time and within budget
Monitor progress of construction activities and address any issues that may arise
Ensure compliance with safety regulations and quality standards
Communicat...
I applied via Approached by Company and was interviewed in Jan 2023. There were 4 interview rounds.
Copy Monitor is a Revit tool that allows users to monitor and synchronize changes made to linked models.
Copy Monitor is used in Revit to ensure that changes made to linked models are reflected in the current model.
It allows users to monitor and synchronize changes made to linked models.
Copy Monitor can be used to track changes to elements such as walls, floors, and roofs.
It can also be used to monitor changes to parame...
Revit models can be linked using the 'Link Revit' tool in the 'Insert' tab.
Open the host model and go to the 'Insert' tab.
Click on 'Link Revit' and select the model to be linked.
Choose the appropriate settings for the link, such as positioning and visibility.
Repeat the process for any additional models to be linked.
Save the host model to ensure the links are maintained.
They gave an architectural model to create a structural model
I am open to discussing my salary expectations based on my skills and the value I can bring to your company.
Market Research: I have researched the current market rates for similar positions and am willing to negotiate based on that.
Value Proposition: My previous experience and skills can contribute significantly to your team, which may justify a higher salary.
Career Growth: I am more focused on opportunities for growth...
I applied via Walk-in and was interviewed in Jan 2024. There was 1 interview round.
Types of paints and tiles commonly used in construction projects.
Types of paints: acrylic, latex, oil-based, enamel, spray paint
Types of tiles: ceramic, porcelain, glass, natural stone, mosaic
posted on 2 Dec 2024
Tiling is a process of dividing a larger area into smaller, manageable sections for efficient processing or analysis.
Used in computer graphics to manage rendering of large images or scenes.
In GIS, tiling helps in efficient storage and retrieval of spatial data.
Example: Google Maps uses tiling to load map sections dynamically.
In data processing, tiling can optimize algorithms by breaking data into chunks.
I applied via Campus Placement and was interviewed in Jun 2021. There were 5 interview rounds.
Concrete technology is the study of the properties and behavior of concrete, including its composition, production, and application.
Concrete is a composite material made up of cement, water, aggregates, and often other additives.
It is widely used in construction for its strength, durability, and versatility.
Concrete technology involves understanding the chemical reactions and physical properties of concrete.
It includes...
I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.
based on 4 interview experiences
Difficulty level
Duration
based on 26 reviews
Rating in categories
Assistant Manager
239
salaries
| ₹5.3 L/yr - ₹12.2 L/yr |
Project Engineer
149
salaries
| ₹3.6 L/yr - ₹8.6 L/yr |
Assistant Project Manager
125
salaries
| ₹5.9 L/yr - ₹13.5 L/yr |
Project Manager
120
salaries
| ₹9.7 L/yr - ₹18 L/yr |
Senior Engineer
95
salaries
| ₹4.2 L/yr - ₹9.5 L/yr |
JLL
CBRE
Sobha
Lodha Group