Filter interviews by
I appeared for an interview in Nov 2024, where I was asked the following questions.
I appeared for an interview before Dec 2023.
Multiple choice questions based on code.
The script automates deployment tasks using bash commands for efficiency and consistency.
Uses shebang (#!/bin/bash) to specify the script interpreter.
Defines variables for configuration, e.g., 'SERVER=192.168.1.1'.
Includes functions for modularity, e.g., 'deploy_app()' to handle deployment.
Utilizes loops for repetitive tasks, e.g., 'for server in ${SERVERS[@]}'.
Handles errors with 'if' statements to ensure successful e...
I appeared for an interview before Apr 2024, where I was asked the following questions.
Piling is a foundational process essential for metro line construction, ensuring stability and load-bearing capacity.
Types of Piles: Different types of piles, such as driven piles and bored piles, are used based on soil conditions and load requirements.
Site Investigation: Conducting thorough geotechnical investigations to determine soil properties and select appropriate piling methods.
Installation Techniques: Utilizing...
I applied via Naukri.com and was interviewed before May 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed before May 2023. There were 3 interview rounds.
Costing about a drawing involves calculating the expenses incurred in creating the drawing.
Calculate the cost of materials used in the drawing such as paper, pencils, and colors.
Consider the cost of labor involved in creating the drawing.
Include any overhead costs such as utilities and rent for the workspace.
Factor in any additional expenses like framing or shipping if applicable.
Assignment test for excel on pc. For
I applied via Referral and was interviewed before Jan 2023. There was 1 interview round.
Experienced in railway projects, focusing on signal design, safety, and system integration.
Led the design and implementation of a signaling system for a major urban transit project, improving safety and efficiency.
Collaborated with cross-functional teams to integrate advanced signaling technologies, such as CBTC (Communications-Based Train Control).
Conducted thorough risk assessments and safety analyses, ensuring compl...
I applied via Campus Placement and was interviewed before Sep 2022. There were 3 interview rounds.
Topic about myself and growth of industry
Top trending discussions
based on 10 interview experiences
Difficulty level
Duration
based on 144 reviews
Rating in categories
Production Engineer
13
salaries
| ₹2.5 L/yr - ₹4.2 L/yr |
Design Engineer
10
salaries
| ₹2.4 L/yr - ₹6.1 L/yr |
Quality Engineer
7
salaries
| ₹1.7 L/yr - ₹4.8 L/yr |
Production Supervisor
7
salaries
| ₹1.5 L/yr - ₹3.4 L/yr |
Sales Coordinator
7
salaries
| ₹2.4 L/yr - ₹3.3 L/yr |
Trelleborg
PMT Machines
Ajay Industrial Corporation
Mitsubishi Heavy Industries