Upload Button Icon Add office photos

Dee Vee Projects

Compare button icon Compare button icon Compare

Filter interviews by

Dee Vee Projects Plumbing and Fire Fighting Enguneer Interview Questions and Answers

Updated 11 Sep 2022

Dee Vee Projects Plumbing and Fire Fighting Enguneer Interview Experiences

1 interview found

Round 1 - Technical 

(1 Question)

  • Q1. Water supply & drainage type
  • Ans. 

    Water supply can be either direct or indirect, while drainage can be either single stack or separate system.

    • Water supply can be direct, where water is supplied directly from the mains to the fixtures, or indirect, where water is stored in a tank and then supplied to the fixtures.

    • Drainage can be a single stack system, where all waste water is collected in a single stack and then discharged into the sewer, or a separate ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Plumbing & fire fighting engineer
Sanitary & CP Fitting

Top trending discussions

View All
Interview Hub
1w (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about Dee Vee Projects?
Ask anonymously on communities.

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Your work experience
  • Q2. Detail interview about the design
  • Q3. Anyone wishing to join here Please Avoid

Interview Preparation Tips

Interview preparation tips for other job seekers - Please anyone looking to join here please avoid for your own good

Plumbing and Fire Fighting Enguneer Interview Questions Asked at Other Companies

Q1. Explain about different cable sizes , ratings ,& why we use 4 ... read more
Q2. Explain me basic toilet size & what are the plumbing & el ... read more
Q3. What are type of materials used in plumbing system , Ewc outlet h ... read more
Q4. What is minimum elecrical points required and what's the measurem ... read more
Q5. Tell me about worksequence of both plumbing & electrical
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About salary and benefits
Round 3 - One-on-one 

(4 Questions)

  • Q1. About my key activity and responsibility
  • Q2. Process of variation
  • Ans. 

    Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.

    • Variations are changes to the original scope, cost, or schedule of a project

    • Variations must be documented and approved by the relevant parties

    • The impact of variations on project budget and timeline must be analyzed

    • Examples of variations include design changes, unforeseen site conditions, and client requests

  • Answered by AI
  • Q3. Details about TDS
  • Q4. Details about NS items

Interview Preparation Tips

Topics to prepare for The Louis Berger Group Billing Engineer interview:
  • Contact
  • Running bill
  • Escalations
  • Variation
  • Ns items

I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. How we define daviation of line and spotting of towers, major statuary clerance and their proposal and clearance proposals
  • Ans. 

    Deviation of line and spotting of towers refer to the process of ensuring proper clearance for power lines and structures.

    • Deviation of line refers to the process of ensuring that power lines follow a safe and efficient path.

    • Spotting of towers involves determining the optimal location for power line towers to ensure proper clearance.

    • Major statutory clearance refers to the minimum distance required between power lines an...

  • Answered by AI
  • Q2. Where is your strengths of transmission line construction activity and why?
  • Ans. 

    My strengths in transmission line construction activity lie in my experience in managing large-scale projects and ensuring adherence to safety standards.

    • Experience in managing large-scale transmission line construction projects

    • Expertise in ensuring adherence to safety standards and regulations

    • Ability to coordinate with cross-functional teams and stakeholders

    • Strong problem-solving and decision-making skills

    • Familiarity w...

  • Answered by AI
  • Q3. Why are you left your current employer

Interview Preparation Tips

Interview preparation tips for other job seekers - Ask what you, dont give incomplete answer

I applied via Referral and was interviewed before Feb 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Are you committed to be in project till project completion
  • Q2. Can you handel multi dimenssional assignment
  • Ans. 

    Yes, I have experience in handling multi-dimensional assignments.

    • I have previously managed a team with diverse skill sets and responsibilities.

    • I am comfortable with delegating tasks and ensuring timely completion.

    • I have a strong understanding of project management and resource allocation.

    • I am adept at prioritizing tasks and managing multiple projects simultaneously.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I advice individual need to share his technical and team building abilities

Skills evaluated in this interview

I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. As attendance for “Mid Management level designation “ Just asks about my Experience. Not much Technical points highlighted except few Manager level Questions (general points not much technically projected)...

Interview Preparation Tips

Topics to prepare for VIKRAN Engineering & Exim Assistant Manager interview:
  • Nothing required.
Interview preparation tips for other job seekers - Just expecting less salary and having Good experience in the relevant field you can have JOB CONFIRMED easily.
Be interview-ready. Browse the most asked HR questions.
illustration image
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I appeared for an interview before May 2024, where I was asked the following questions.

  • Q1. Positives about you.
  • Ans. 

    I am a proactive problem-solver with strong technical skills and a collaborative mindset, dedicated to delivering high-quality results.

    • Strong technical expertise: I have over 10 years of experience in software development, specializing in scalable web applications.

    • Proactive problem-solving: In my last project, I identified a critical performance bottleneck and implemented a solution that improved load times by 30%.

    • Team...

  • Answered by AI
  • Q2. Why we need to hire you?
Are these interview questions helpful?

I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Explain compressor troubleshooting
  • Ans. 

    Compressor troubleshooting involves identifying and resolving issues with the compressor in a system.

    • Check for leaks in the system

    • Inspect the compressor for damage or wear

    • Check the electrical connections and wiring

    • Monitor the pressure and temperature readings

    • Clean or replace air filters

    • Check the oil level and quality

    • Inspect the belts and pulleys for wear or damage

  • Answered by AI
  • Q2. Prespare well and before interview make sure

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well and all types mechanical equipment
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. What do you know about our company

Interview Preparation Tips

Interview preparation tips for other job seekers - they will ask about some finance knowledge and the rest is just a normal interview question
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Where are you from Tell me something about yourself.
  • Ans. 

    I am from a small town in the Midwest and I am passionate about environmental conservation.

    • I grew up in a close-knit community in the Midwest

    • I have always been interested in protecting the environment

    • I enjoy outdoor activities like hiking and gardening

  • Answered by AI
  • Q2. Tell me about education background
  • Ans. 

    I have a Bachelor's degree in Computer Science from XYZ University.

    • Bachelor's degree in Computer Science

    • Graduated from XYZ University

    • Specialized in software development

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It was an excellent experience for me.

Dee Vee Projects Interview FAQs

How many rounds are there in Dee Vee Projects Plumbing and Fire Fighting Enguneer interview?
Dee Vee Projects interview process usually has 1 rounds. The most common rounds in the Dee Vee Projects interview process are Technical.

Tell us how to improve this page.

Civil Site Engineer
42 salaries
unlock blur

₹2 L/yr - ₹5.4 L/yr

Senior Engineer
23 salaries
unlock blur

₹4.2 L/yr - ₹8.5 L/yr

Safety Officer
16 salaries
unlock blur

₹2.8 L/yr - ₹5.5 L/yr

Billing Engineer
14 salaries
unlock blur

₹3.8 L/yr - ₹7.5 L/yr

Project Manager
13 salaries
unlock blur

₹11 L/yr - ₹20.6 L/yr

Explore more salaries
Compare Dee Vee Projects with

Lea Associates South Asia

4.2
Compare

ABCI Infrastructures

3.4
Compare

VIKRAN Engineering & Exim

4.0
Compare

The Louis Berger Group

4.3
Compare
write
Share an Interview