Upload Button Icon Add office photos

Dee Vee Projects

Compare button icon Compare button icon Compare

Filter interviews by

Dee Vee Projects Civil Site Engineer Interview Questions and Answers

Updated 22 Dec 2022

Dee Vee Projects Civil Site Engineer Interview Experiences

1 interview found

Civil Site Engineer Interview Questions & Answers

user image Shatrughna Singh

posted on 22 Dec 2022

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is mix design, grade of concerte, and its lab testing name
  • Ans. 

    Mix design is the process of determining the proportions of cement, water, aggregates, and admixtures to produce concrete of desired strength and durability.

    • Grade of concrete refers to the strength of the concrete mix, which is determined by its compressive strength after 28 days of curing.

    • Lab testing for concrete includes tests for compressive strength, slump, air content, and density.

    • Mix design involves selecting the...

  • Answered by AI
  • Q2. Qistion arise from level sheet making ,wmm wbm dbm bc
  • Ans. 

    The question is related to the process of making level sheets using WMM, WBM, DBM, and BC.

    • Level sheet making involves the use of different materials such as WMM, WBM, DBM, and BC.

    • WMM stands for Wet Mix Macadam and is used as a base layer for roads.

    • WBM stands for Water Bound Macadam and is used as a base layer for flexible pavements.

    • DBM stands for Dense Bituminous Macadam and is used as a binder course layer for roads.

    • B...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident during interviews time and negotiating time of salary ,they try to offer less

Top trending discussions

View All
Interview Hub
1w (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about Dee Vee Projects?
Ask anonymously on communities.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About salary and benefits
Round 3 - One-on-one 

(4 Questions)

  • Q1. About my key activity and responsibility
  • Q2. Process of variation
  • Ans. 

    Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.

    • Variations are changes to the original scope, cost, or schedule of a project

    • Variations must be documented and approved by the relevant parties

    • The impact of variations on project budget and timeline must be analyzed

    • Examples of variations include design changes, unforeseen site conditions, and client requests

  • Answered by AI
  • Q3. Details about TDS
  • Q4. Details about NS items

Interview Preparation Tips

Topics to prepare for The Louis Berger Group Billing Engineer interview:
  • Contact
  • Running bill
  • Escalations
  • Variation
  • Ns items

Civil Site Engineer Interview Questions Asked at Other Companies

Q1. What is the minimum grade of concrete used in RCC works?
Q2. If you have a 10x10 feet room and you have 600x600 mm size tiles, ... read more
asked in TCE
Q3. If your M50 concrete's 28-day cube test result is below 100%, wha ... read more
Q4. 1.What is the thickness of plastering?, 2.What is name of plaster ... read more
Q5. What is the shelf life of an open bag of cement?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I appeared for an interview before May 2024, where I was asked the following questions.

  • Q1. Positives about you.
  • Ans. 

    I am a proactive problem-solver with strong technical skills and a collaborative mindset, dedicated to delivering high-quality results.

    • Strong technical expertise: I have over 10 years of experience in software development, specializing in scalable web applications.

    • Proactive problem-solving: In my last project, I identified a critical performance bottleneck and implemented a solution that improved load times by 30%.

    • Team...

  • Answered by AI
  • Q2. Why we need to hire you?
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Not Selected

I applied via Newspaper Ad and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. About Carriageways, Service Roads and patchwork i.e pot Holes, slippage cracks i.e alligator crack, horizontal or vertical crack, Undulating surface,rain cut, Metals beam crash barrier,Gaurd Rail or Mild s...
Round 2 - Technical 

(3 Questions)

  • Q1. Checking level of the layer
  • Q2. Testing the field dry density of the bed like Sub Grade ,GSB,WMM, DBM or BC
  • Q3. Checking the road width

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir I m very hardworker employee .
I m very panchtual for my job duty and going to site daily and prepare daily progress report and also prepare monthly progress report.

I appeared for an interview before Jul 2016.

Interview Questionnaire 

1 Question

  • Q1. Temperature of Prime coat, Tack Coat, Penetration Grade, various tests on Bitumen, asphalt works, Rolling pattern, Rolling temperature as well as Asphalt Laying temperature, densities of various compacted ...

Interview Preparation Tips

Skills: Knowledge Of Construction Practices, Construction Technology

I applied via Naukri.com and was interviewed before May 2017. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What is the density of soil in embankment layer.
  • Ans. 

    The density of soil in the embankment layer varies depending on the type of soil and compaction methods used.

    • The density of soil in the embankment layer is typically measured in terms of dry density or wet density.

    • Dry density refers to the mass of solid soil particles per unit volume of soil, while wet density includes the mass of water as well.

    • The density of soil in the embankment layer is influenced by factors such a...

  • Answered by AI

Interview Preparation Tips

General Tips: This interview was a technical one.The interview eanted to test both my knowledge and communications skills.Most of questions are related with Transportation.
Skills: Technical Knowledge(ML, Technical Knowledge(ML
Duration: <1 week
Be interview-ready. Browse the most asked HR questions.
illustration image

I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Thanks for the selection in SCC Infrastructure Pvt Ltd
Are these interview questions helpful?

I applied via Approached by Company and was interviewed in Apr 2022. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. How mutch your working experience?

Interview Preparation Tips

Interview preparation tips for other job seekers - Intrust the field architecture and construction field

I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Related to department

Interview Preparation Tips

Topics to prepare for Hyundai Engineering Civil Engineer interview:
  • Related to experience
Interview preparation tips for other job seekers - Please prepare professional cv related to work
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. What is bar bending schedule
  • Q2. 28 days concrete strength
  • Ans. 

    28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.

    • 28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing

    • It is important for assessing the quality of concrete and its ability to support structural loads

    • The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing...

  • Answered by AI
  • Q3. Difference between mivan and conventional
  • Ans. 

    Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.

    • Mivan is faster and more efficient than conventional construction methods.

    • Mivan requires skilled labor for installation of aluminum formwork.

    • Conventional construction is more labor-intensive and time-consuming.

    • Mivan provides better quality finishes compared to conventional...

  • Answered by AI
  • Q4. What is self leveling concrete
  • Ans. 

    Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.

    • Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.

    • It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.

    • Self leveling concrete can be applied in thicknesses ranging from a featheredg...

  • Answered by AI
  • Q5. How many days will take 1st Aluform mockup Concreting
  • Ans. 

    The 1st Aluform mockup concreting typically takes 1-2 days to complete.

    • 1-2 days is the usual timeframe for 1st Aluform mockup concreting

    • Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration

    • Proper planning and coordination can help expedite the process

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Shimizu Senior Site Engineer interview:
  • Construction
  • Structural
  • Quality Control
  • Quality Assurance
  • Bar Bending Schedule
  • Project Execution
Interview preparation tips for other job seekers - Be active and action to learn every step and work hard and smart . Please ensure technical criticis and how it resolve it

Dee Vee Projects Interview FAQs

How many rounds are there in Dee Vee Projects Civil Site Engineer interview?
Dee Vee Projects interview process usually has 2 rounds. The most common rounds in the Dee Vee Projects interview process are Resume Shortlist and Technical.
What are the top questions asked in Dee Vee Projects Civil Site Engineer interview?

Some of the top questions asked at the Dee Vee Projects Civil Site Engineer interview -

  1. What is mix design, grade of concerte, and its lab testing n...read more
  2. Qistion arise from level sheet making ,wmm wbm dbm...read more

Tell us how to improve this page.

Overall Interview Experience Rating

5/5

based on 1 interview experience

Difficulty level

Hard 100%

Duration

Less than 2 weeks 100%
View more
Dee Vee Projects Civil Site Engineer Salary
based on 42 salaries
₹2 L/yr - ₹5.4 L/yr
At par with the average Civil Site Engineer Salary in India
View more details

Dee Vee Projects Civil Site Engineer Reviews and Ratings

based on 17 reviews

3.2/5

Rating in categories

3.0

Skill development

3.5

Work-life balance

3.0

Salary

2.9

Job security

3.4

Company culture

2.8

Promotions

3.0

Work satisfaction

Explore 17 Reviews and Ratings
Civil Site Engineer
42 salaries
unlock blur

₹2 L/yr - ₹5.4 L/yr

Senior Engineer
23 salaries
unlock blur

₹4.2 L/yr - ₹8.5 L/yr

Safety Officer
16 salaries
unlock blur

₹2.8 L/yr - ₹5.5 L/yr

Billing Engineer
14 salaries
unlock blur

₹3.8 L/yr - ₹7.5 L/yr

Project Manager
13 salaries
unlock blur

₹11 L/yr - ₹20.6 L/yr

Explore more salaries
Compare Dee Vee Projects with

Lea Associates South Asia

4.2
Compare

ABCI Infrastructures

3.4
Compare

VIKRAN Engineering & Exim

4.0
Compare

The Louis Berger Group

4.3
Compare
write
Share an Interview