Filter interviews by
Employing strategic resource management and process optimization can help meet production targets efficiently.
Implement Lean Manufacturing principles to eliminate waste and improve efficiency. For example, using value stream mapping to identify bottlenecks.
Utilize cross-training of employees to enhance flexibility and reduce downtime. For instance, training operators to handle multiple machines.
Adopt just-in-time ...
Implementing structured training and robust processes ensures quality and production with unskilled operators.
Provide comprehensive training programs to enhance skills and knowledge.
Implement standardized operating procedures (SOPs) to guide operators.
Utilize visual aids and checklists to simplify complex tasks.
Conduct regular quality checks and feedback sessions to identify areas for improvement.
Pair unskilled op...
The height of a slump cone is typically 12 inches.
The standard height of a slump cone used in construction is 12 inches.
The height of the slump cone is important for measuring the consistency of concrete mix.
The slump cone is filled with concrete, then lifted off to see how much the concrete slumps, indicating its workability.
Various tests are conducted on site to ensure quality and safety standards are met.
Soil testing to determine soil composition and suitability for construction
Concrete testing to check strength and durability
Compaction testing to ensure proper compaction of soil
Water testing to assess water quality for construction purposes
Material testing for quality control and compliance with specifications
Manpower can be handled by effective communication, training, motivation, and delegation of tasks.
Establish clear communication channels to ensure everyone is aware of their roles and responsibilities
Provide adequate training to ensure employees have the necessary skills to perform their tasks
Motivate employees through recognition, rewards, and a positive work environment
Delegate tasks based on individual strength...
To increase production, optimize processes, improve efficiency, and invest in technology.
Analyze current production processes and identify areas for improvement
Implement lean manufacturing principles to reduce waste and increase efficiency
Invest in new technology and equipment to automate processes and increase output
Train and develop employees to improve skills and knowledge
Implement a performance management syst...
Breakdowns and hidden losses can be controlled through proper maintenance and monitoring of equipment and processes.
Regular maintenance and inspections can identify potential issues before they become breakdowns.
Implementing a preventive maintenance program can reduce the frequency of breakdowns.
Training employees on proper use and care of equipment can prevent damage and breakdowns.
Monitoring production processes...
Rejection can be controlled by identifying the root cause and implementing corrective actions.
Identify the root cause of rejection through analysis of rejection data.
Implement corrective actions to address the root cause.
Train employees on proper procedures and quality standards.
Regularly monitor rejection rates and take necessary actions to improve.
Collaborate with suppliers to improve quality of incoming materia...
Cost reduction can be achieved through efficiency improvements, waste reduction, and strategic sourcing.
Implement lean manufacturing principles to minimize waste and optimize processes.
Negotiate better terms with suppliers to reduce material costs, e.g., bulk purchasing discounts.
Invest in technology and automation to enhance productivity and reduce labor costs.
Conduct regular maintenance on equipment to prevent c...
Defect generation, SCADA, autonomous maintenance, and productivity improvement are key topics in the interview for Senior Engineer.
Defect generation refers to the process of identifying and categorizing defects in a product or system.
SCADA stands for Supervisory Control and Data Acquisition, which is a system used to monitor and control industrial processes.
Autonomous Maintenance is a concept in Lean Manufacturing...
I appeared for an interview in Feb 2025, where I was asked the following questions.
SPC, MSA, product/process audits, and layout are essential for quality control and process improvement in engineering.
SPC (Statistical Process Control) uses statistical methods to monitor and control a process, ensuring it operates at its full potential.
MSA (Measurement System Analysis) evaluates the accuracy and precision of measurement systems, crucial for reliable data collection.
Product audits assess the final prod...
I applied via Naukri.com and was interviewed before Apr 2021. There were 4 interview rounds.
Expected CTC , some technical questions regarding your work showing on resume.
Various tests are conducted on site to ensure quality and safety standards are met.
Soil testing to determine soil composition and suitability for construction
Concrete testing to check strength and durability
Compaction testing to ensure proper compaction of soil
Water testing to assess water quality for construction purposes
Material testing for quality control and compliance with specifications
I appeared for an interview before Mar 2024.
Employing strategic resource management and process optimization can help meet production targets efficiently.
Implement Lean Manufacturing principles to eliminate waste and improve efficiency. For example, using value stream mapping to identify bottlenecks.
Utilize cross-training of employees to enhance flexibility and reduce downtime. For instance, training operators to handle multiple machines.
Adopt just-in-time (JIT)...
Implementing structured training and robust processes ensures quality and production with unskilled operators.
Provide comprehensive training programs to enhance skills and knowledge.
Implement standardized operating procedures (SOPs) to guide operators.
Utilize visual aids and checklists to simplify complex tasks.
Conduct regular quality checks and feedback sessions to identify areas for improvement.
Pair unskilled operato...
I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Nov 2022. There were 3 interview rounds.
I am a Sr. Engineer with experience in production. I have a strong background in managing production processes and optimizing efficiency.
I have 8 years of experience in the production field.
I have successfully managed production teams and implemented process improvements.
I have expertise in lean manufacturing principles and have implemented them to reduce waste and increase productivity.
I have a track record of meeting...
I have 10 years of experience in production engineering, my current salary is $80,000, and my hobby is woodworking.
10 years of experience in production engineering
Current salary is $80,000
Hobby is woodworking
Breakdowns and hidden losses can be controlled through proper maintenance and monitoring of equipment and processes.
Regular maintenance and inspections can identify potential issues before they become breakdowns.
Implementing a preventive maintenance program can reduce the frequency of breakdowns.
Training employees on proper use and care of equipment can prevent damage and breakdowns.
Monitoring production processes can ...
Manpower can be handled by effective communication, training, motivation, and delegation of tasks.
Establish clear communication channels to ensure everyone is aware of their roles and responsibilities
Provide adequate training to ensure employees have the necessary skills to perform their tasks
Motivate employees through recognition, rewards, and a positive work environment
Delegate tasks based on individual strengths and...
Top trending discussions
Some of the top questions asked at the Highway Industries interview -
The duration of Highway Industries interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 22 interview experiences
Difficulty level
Duration
based on 295 reviews
Rating in categories
Quality Engineer
83
salaries
| ₹1.7 L/yr - ₹4.8 L/yr |
Engineer
68
salaries
| ₹2 L/yr - ₹4.9 L/yr |
Senior Engineer
58
salaries
| ₹3 L/yr - ₹6 L/yr |
Production Engineer
51
salaries
| ₹2.3 L/yr - ₹6 L/yr |
Assistant Manager
48
salaries
| ₹4.2 L/yr - ₹8.5 L/yr |
L&T Energy Hydrocarbon
AECOM
Sterling & Wilson
Apco Infratech