I applied via Approached by Company and was interviewed in Jan 2022. There were 2 interview rounds.
Handled various claims related to delays, cost overruns, and scope changes, ensuring compliance with contract terms.
Managed a delay claim due to unforeseen site conditions, referencing the Force Majeure clause.
Addressed a cost overrun claim by invoking the Change Order clause, ensuring proper documentation was submitted.
Resolved a scope change dispute by applying the Variations clause, negotiating additional compensati...
FIDIC defines Employer, Engineer and Contractor in construction contracts.
Employer: The party who engages the Contractor to carry out the works.
Engineer: The party appointed by the Employer to supervise the works and administer the contract.
Contractor: The party who undertakes to carry out the works in accordance with the contract.
FIDIC stands for International Federation of Consulting Engineers.
FIDIC contracts are wid...
FIDIC Red Book is for construction works while Yellow Book is for plant and design-build projects.
Red Book is for construction works while Yellow Book is for plant and design-build projects.
Red Book has more detailed provisions for construction works than Yellow Book.
Yellow Book has more flexibility in design and construction than Red Book.
Red Book has a higher emphasis on quality control and assurance than Yellow Book...
Explanation of variation clause, price variation, value engineering, suspension as per FIDIC.
Variation clause allows for changes in the scope of work.
Price variation allows for adjustments in contract price due to changes in market conditions.
Value engineering is a process of optimizing the value of the project by reducing costs while maintaining quality.
Suspension allows for temporary cessation of work due to unforese...
Price variation clause is required in contract to account for changes in market conditions and prevent financial loss.
Protects both parties from financial loss due to unforeseen circumstances
Allows for adjustments to be made to the contract price based on changes in market conditions
Helps to ensure that the contract remains fair and equitable for both parties
Commonly used in long-term contracts where market conditions ...
Top trending discussions
I appeared for an interview in Aug 2017.
posted on 14 Nov 2017
I appeared for an interview before Nov 2016.
Leveling is the process of determining the height or elevation of a point or surface relative to a reference point.
Leveling is commonly used in civil engineering and construction to ensure accurate measurements and proper alignment.
It involves the use of leveling instruments such as a level, theodolite, or laser level.
The process typically includes setting up benchmarks or reference points, taking readings at different...
The diameter of six mm refers to the size or measurement of a circular object that is six millimeters in width.
The diameter is the distance across the center of a circle, passing through the circumference.
A six mm diameter can be visualized as a circle with a width of six millimeters.
It is a common measurement used in various industries, including engineering and manufacturing.
For example, a six mm diameter steel rod w...
LEP stands for Load Equivalent Factor for Pavement design.
LEP is used in pavement design to determine the load-carrying capacity of the pavement.
The formula for LEP depends on the specific design method being used.
For example, in the AASHTO design method, LEP is calculated using the formula: LEP = (ESAL/1000) * (1 + 0.003 * (T - 3))
Here, ESAL is the Equivalent Single Axle Load and T is the pavement design period in yea...
I appeared for an interview in Aug 2019.
There are various types of structures, including buildings, bridges, dams, tunnels, and towers.
Structures can be classified based on their purpose, design, and materials used.
Buildings can be further classified into residential, commercial, and industrial structures.
Bridges can be classified into beam, arch, suspension, and cable-stayed bridges.
Dams can be classified into gravity, arch, buttress, and embankment dams.
Tu...
Density is the measure of mass per unit volume of a substance.
It is a physical property of matter.
It is calculated by dividing the mass of a substance by its volume.
Units of density include kg/m³, g/cm³, and lb/ft³.
Density can be used to identify substances and determine their purity.
For example, gold has a density of 19.3 g/cm³, while aluminum has a density of 2.7 g/cm³.
There are two types of density construction: compacted and loose.
Compacted density construction involves compressing the material to increase its density, such as in road construction.
Loose density construction involves leaving the material in its natural state, such as in landscaping.
The type of density construction used depends on the intended use of the material and the desired level of compaction.
Other factors that...
Tests for construction joints include visual inspection, water tightness test, and load transfer test.
Visual inspection to check for proper joint alignment and sealant application
Water tightness test to ensure no water leakage through the joint
Load transfer test to verify the joint can handle the intended load
Other tests may include pull-out test, shear test, and compression test
Testing frequency and methods may vary d...
I applied via Campus Placement and was interviewed before May 2020. There were 3 interview rounds.
I applied via Naukri.com
Yes, I have extensive experience in inspecting and testing rotary equipment across various industries.
Conducted vibration analysis on pumps and compressors to ensure optimal performance.
Performed alignment checks on rotary machinery to prevent premature wear.
Executed non-destructive testing (NDT) methods on turbine components to identify potential failures.
Utilized thermal imaging to monitor temperature variations in r...
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Aug 2020. There were 5 interview rounds.
I applied via Campus Placement and was interviewed in Jul 2020. There were 3 interview rounds.
Some of the top questions asked at the Hindustan Construction Company Contract Engineer interview -
based on 7 reviews
Rating in categories
Site Engineer
210
salaries
| ₹2.7 L/yr - ₹7.2 L/yr |
Civil Site Engineer
140
salaries
| ₹3.3 L/yr - ₹7.2 L/yr |
Quantity Surveyor
52
salaries
| ₹3.3 L/yr - ₹7.2 L/yr |
Civil Engineer
45
salaries
| ₹2.7 L/yr - ₹6 L/yr |
Manager
44
salaries
| ₹10.1 L/yr - ₹18.5 L/yr |
L&T Construction
Tata Projects
Simplex Infrastructures
ITD Cementation India