A Site Engineer was asked 2mo ago
Q. What is the weight of a 1-meter long 12 mm diameter bar?
Ans. 

The weight of a 1m length of 12 mm diameter steel bar can be calculated using its density.

  • The formula to calculate weight is: Weight = Volume x Density.

  • For a 12 mm diameter steel bar, the radius is 6 mm or 0.006 m.

  • Volume of a cylinder = πr²h, where r is radius and h is height (length).

  • For 1 m length: Volume = π(0.006 m)²(1 m) ≈ 1.13 x 10^-4 m³.

  • Density of steel is approximately 7850 kg/m³.

  • Weight = Volume x Density ...

A Site Engineer was asked 7mo ago
Q. Which beam will have the highest thickness?
Ans. 

The beam with the highest thickness will depend on the specific design and requirements of the structure.

  • The beam with the highest thickness will typically be a main load-bearing beam in the structure.

  • Factors such as the span of the beam, the load it needs to support, and the material used will determine the required thickness.

  • For example, a bridge beam supporting heavy traffic will likely have a higher thickness ...

Site Engineer Interview Questions Asked at Other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimensio ... read more
Q2. What is the definition of rolling margin in the context of steel?
Q3. Which type of pipeline and standards do you follow?
Q4. design? 1.what is ASD in steel design? 2.what is special consider ... read more
Q5. What is the lapping zone of beam rebar at top and bottom...? Why ... read more
A Site Engineer was asked 8mo ago
Q. What are the different types of slab foundations?
Ans. 

Different types of slabs foundation include raft, mat, flat plate, and waffle slab foundations.

  • Raft foundation: a solid reinforced concrete slab that covers the entire area under a building

  • Mat foundation: a thick concrete slab used to support heavy structures or buildings

  • Flat plate foundation: a simple and economical type of foundation with a uniform thickness

  • Waffle slab foundation: a type of foundation with grid-...

A Site Engineer was asked
Q. What is knee bracing?
Ans. 

Knee bracing is a structural support used in construction to prevent lateral movement of beams or columns.

  • Knee bracing is a diagonal member used to connect a vertical member to a horizontal member in a structure.

  • It helps to resist lateral forces and prevent buckling or swaying of the structure.

  • Knee bracing is commonly used in steel frame construction to provide stability and support.

  • Examples include diagonal brace...

What people are saying about L&T Construction

View All
an environmental health and safety officer
1w
Job Switch Referral/Lead help!!! Designation: safety officer Current Company: ACCURATE LOGIST Pvt. Ltd Previous Company: MARKOUT SOURCING
Experience in Years: 4 years in construction safety Current CTC: 3.5LPA Expected CTC: 4.2LPA Im looking for job switch in UP/GJ/MH/MP/DL location. Any referrals or lead please contact. Email: viveksing1391999@gmail.com
Got a question about L&T Construction?
Ask anonymously on communities.
A Site Engineer was asked
Q. What is the difference between design mix concrete and nominal mix concrete?
Ans. 

Design mix concrete is a mix of concrete prepared by a designer as per the required strength and durability, while nominal mix concrete is a mix of concrete prepared based on standard ratios without specific design requirements.

  • Design mix concrete is prepared by a designer based on specific requirements for strength and durability.

  • Nominal mix concrete is prepared based on standard ratios like 1:2:4 without specifi...

A Site Engineer was asked
Q. What are the safest measures we have to take at the site?
Ans. 

Safety measures at the site include wearing appropriate personal protective equipment, following safety protocols, conducting regular safety inspections, and providing safety training to all workers.

  • Wearing appropriate personal protective equipment such as helmets, gloves, and safety shoes

  • Following safety protocols and guidelines set by the company and regulatory bodies

  • Conducting regular safety inspections to iden...

A Site Engineer was asked
Q. Are you ready to work in a remote location?
Ans. 

Yes, I am ready for remote locations as I am adaptable and have experience working in challenging environments.

  • I have previous experience working in remote locations.

  • I am adaptable and can easily adjust to new environments.

  • I am comfortable with limited resources and facilities.

  • I am prepared for potential challenges such as limited communication and transportation options.

Are these interview questions helpful?
A Site Engineer was asked
Q. What are AC and DC?
Ans. 

AC and DC are two types of electrical current. AC stands for Alternating Current and DC stands for Direct Current.

  • AC (Alternating Current) is a type of electrical current that periodically changes direction.

  • DC (Direct Current) is a type of electrical current that flows in only one direction.

  • AC is commonly used in household electrical systems, while DC is used in batteries and electronic devices.

  • AC can be easily co...

A Site Engineer was asked
Q. How do you manage a team?
Ans. 

Managing a team involves effective communication, delegation, motivation, and conflict resolution.

  • Establish clear goals and expectations for the team

  • Communicate regularly and openly with team members

  • Delegate tasks based on team members' strengths and skills

  • Provide feedback and recognition for good work

  • Address conflicts and issues promptly and fairly

  • Lead by example and demonstrate a positive attitude

  • Encourage colla...

A Site Engineer was asked
Q. What do you know about Grab and the Pipeline?
Ans. 

Grab is a Southeast Asian ride-hailing, food delivery, and financial services company. The Pipeline is a program to develop tech talent.

  • Grab is headquartered in Singapore and operates in 8 countries.

  • It offers various services like ride-hailing, food delivery, and financial services.

  • The Pipeline is a program to develop tech talent in Southeast Asia.

  • It provides training and mentorship to aspiring tech professionals.

  • ...

L&T Construction Site Engineer Interview Experiences

21 interviews found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 17 Nov 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Campus Placement and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Shear force and bmd
  • Q2. Types of beam ,propped cantiliver beam
  • Ans. 

    A propped cantilever beam is a type of beam that is supported at one end and has a support (prop) at some point along its length.

    • Propped cantilever beams have a fixed support at one end and a prop at some point along the beam's length.

    • The prop helps to reduce the bending moment and deflection at the free end of the beam.

    • These beams are commonly used in construction to support overhanging structures or balconies.

    • Example...

  • Answered by AI
  • Q3. Which beam will have highest thickness
  • Ans. 

    The beam with the highest thickness will depend on the specific design and requirements of the structure.

    • The beam with the highest thickness will typically be a main load-bearing beam in the structure.

    • Factors such as the span of the beam, the load it needs to support, and the material used will determine the required thickness.

    • For example, a bridge beam supporting heavy traffic will likely have a higher thickness than ...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for L&T Construction Site Engineer interview:
  • Concrete
  • RCC
Interview preparation tips for other job seekers - basic core questions

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 26 Sep 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Activity 

(2 Questions)

  • Q1. Which are the different types of slabs
  • Ans. 

    Different types of slabs include one-way slab, two-way slab, flat slab, ribbed slab, waffle slab, and hollow core slab.

    • One-way slab: supported on two opposite sides and bends in only one direction

    • Two-way slab: supported on all four sides and bends in two directions

    • Flat slab: without beams and supported directly on columns

    • Ribbed slab: with ribs on the underside for added strength and reduced weight

    • Waffle slab: with grid...

  • Answered by AI
  • Q2. What are the different types of slabs foundation
  • Ans. 

    Different types of slabs foundation include raft, mat, flat plate, and waffle slab foundations.

    • Raft foundation: a solid reinforced concrete slab that covers the entire area under a building

    • Mat foundation: a thick concrete slab used to support heavy structures or buildings

    • Flat plate foundation: a simple and economical type of foundation with a uniform thickness

    • Waffle slab foundation: a type of foundation with grid-like ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Site engineer
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. What is the safest measures we have to take at the site?
  • Ans. 

    Safety measures at the site include wearing appropriate personal protective equipment, following safety protocols, conducting regular safety inspections, and providing safety training to all workers.

    • Wearing appropriate personal protective equipment such as helmets, gloves, and safety shoes

    • Following safety protocols and guidelines set by the company and regulatory bodies

    • Conducting regular safety inspections to identify ...

  • Answered by AI
  • Q2. Tell me about your project?
  • Q3. Salary expectation?
  • Q4. Are you ready for remote location?
  • Ans. 

    Yes, I am ready for remote locations as I am adaptable and have experience working in challenging environments.

    • I have previous experience working in remote locations.

    • I am adaptable and can easily adjust to new environments.

    • I am comfortable with limited resources and facilities.

    • I am prepared for potential challenges such as limited communication and transportation options.

  • Answered by AI
  • Q5. Tell me concretemix design?
  • Ans. 

    Concrete mix design is the process of selecting suitable ingredients and determining their proportions to produce concrete with desired properties.

    • Concrete mix design involves selecting the right combination of cement, aggregates, water, and admixtures.

    • The proportions of each ingredient are determined based on the desired strength, workability, and durability of the concrete.

    • Factors such as the type of project, environ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Na

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 29 Apr 2025

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
  • Q1. Is you ready to work in remote areas?
  • Q2. Can you work 12 hours.

Site Engineer Interview Questions & Answers

user image Ajay Kaushik

posted on 3 Jan 2025

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jul 2024.

Round 1 - Material testing in construction 

(1 Question)

  • Q1. Slump test , cement test , workability test
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. MS pipe loading
  • Q2. Hydro testing work
  • Ans. 

    Hydro testing work involves testing pipelines, vessels, or other equipment using water or other liquids to ensure they can withstand pressure.

    • Hydro testing is a process used to check the integrity of pipelines, vessels, or other equipment by filling them with water or another liquid and pressurizing them to a specified level.

    • The test is conducted to ensure that the equipment can safely operate under normal operating co...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before May 2024, where I was asked the following questions.

  • Q1. Steel bars and concrete grade
  • Q2. I know leveling and drowning readings
  • Q3. Field observation

Interview Preparation Tips

Interview preparation tips for other job seekers - I believe my hardwork and luck, I can achieve anyone

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 10 Jun 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Billings Site work
Round 2 - HR 

(1 Question)

  • Q1. Billing Sire work
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. All civil engineering questions and 2min talk on selected topic
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Apr 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Building Constitution
  • Q2. Building Construction questions
Round 3 - One-on-one 

(1 Question)

  • Q1. Construction line se

Interview Preparation Tips

Interview preparation tips for other job seekers - Site Engineer

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Site Engineer interview?
L&T Construction interview process usually has 1-2 rounds. The most common rounds in the L&T Construction interview process are Technical, HR and Resume Shortlist.
What are the top questions asked in L&T Construction Site Engineer interview?

Some of the top questions asked at the L&T Construction Site Engineer interview -

  1. 1.) Slump test procedure 2) Tbm 3) how to calculate the wt of steel 4) about s...read more
  2. What is the safest measures we have to take at the si...read more
  3. How many types of struct...read more
How long is the L&T Construction Site Engineer interview process?

The duration of L&T Construction Site Engineer interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

4.4/5

based on 24 interview experiences

Difficulty level

Easy 29%
Moderate 71%

Duration

Less than 2 weeks 67%
2-4 weeks 20%
4-6 weeks 7%
More than 8 weeks 7%
View more
L&T Construction Site Engineer Salary
based on 266 salaries
₹1.5 L/yr - ₹9 L/yr
18% more than the average Site Engineer Salary in India
View more details

L&T Construction Site Engineer Reviews and Ratings

based on 171 reviews

3.9/5

Rating in categories

3.9

Skill development

3.7

Work-life balance

3.9

Salary

3.7

Job security

3.7

Company culture

3.5

Promotions

3.7

Work satisfaction

Explore 171 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
729 salaries
unlock blur

₹3 L/yr - ₹11.9 L/yr

Assistant Construction Manager
549 salaries
unlock blur

₹5.4 L/yr - ₹17 L/yr

Civil Site Engineer
377 salaries
unlock blur

₹1.6 L/yr - ₹8.4 L/yr

Assistant Engineering Manager
319 salaries
unlock blur

₹5.7 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Larsen & Toubro Limited

3.9
Compare

Dilip Buildcon

4.0
Compare

Simplex Infrastructures

3.4
Compare

Power Mech Projects

3.8
Compare
write
Share an Interview