Filter interviews by
I appeared for an interview before May 2023.
There are several types of tests for cement to ensure quality and strength.
Compression test to measure the strength of cement
Fineness test to determine the particle size of cement
Setting time test to assess the time taken for cement to set
Soundness test to check for any volume changes in cement
Chemical analysis test to determine the chemical composition of cement
M40 is a concrete mix design with a compressive strength of 40 MPa.
M40 is a designation for a concrete mix with a specified compressive strength of 40 megapascals.
It is commonly used in construction for structures that require high strength, such as bridges and high-rise buildings.
The mix typically consists of cement, sand, aggregate, and water in specific proportions to achieve the desired strength.
Proper curing and t...
Top trending discussions
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
A man day is a unit of measure representing the amount of work one person can complete in a single day.
Typically used in project management to estimate labor costs and timelines.
One man day usually equals 8 hours of work.
For example, if a task requires 40 man days, it would take one person 40 days or 5 people 8 days to complete.
Helps in resource allocation and planning for projects.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Naukri.com and was interviewed before Nov 2019. There was 1 interview round.
Design parameters for steel structure
Load capacity and distribution
Material strength and durability
Environmental factors such as wind and seismic activity
Connection details and joint design
Fire resistance and protection measures
I have 5 years of exposure to STAAD software.
I have used STAAD for various structural analysis and design projects.
I am proficient in using STAAD for modeling, analysis, and design of steel and concrete structures.
I have experience in using STAAD for seismic analysis and design of structures.
I have also used STAAD for foundation design and analysis.
I keep myself updated with the latest versions and features of STAAD so...
I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.
I appeared for an interview before Jul 2024, where I was asked the following questions.
Experienced Senior Engineer with a proven track record in innovative solutions and team leadership, ready to drive success in your organization.
Over 10 years of experience in software development, leading projects from conception to deployment.
Successfully managed a team of 5 engineers, improving project delivery time by 30% through agile methodologies.
Developed a scalable application that increased user engagement by ...
IS CODE ensures standardization, safety, and quality in erection and fabrication processes across various engineering sectors.
Standardization: IS CODE provides uniform guidelines for materials and processes, ensuring consistency in quality.
Safety: Compliance with IS CODE helps in minimizing risks associated with structural failures during erection.
Quality Assurance: Adhering to IS CODE ensures that the fabricated compo...
A comprehensive checklist ensures quality and efficiency in constructing Pre-Engineered Buildings (PEBs).
Site Assessment: Evaluate soil conditions and topography to determine foundation requirements.
Design Review: Ensure all architectural and structural designs meet local codes and client specifications.
Material Selection: Choose appropriate materials (e.g., steel grades) based on load requirements and environmental fa...
I applied via Walk-in and was interviewed before Sep 2022. There were 2 interview rounds.
Long columns generally take more load due to their greater height and material distribution, affecting structural integrity.
Long columns are more susceptible to buckling under axial loads compared to short columns.
Short columns can carry higher loads due to their stiffness and reduced slenderness ratio.
For example, a 10-foot tall column may buckle under a lower load than a 3-foot tall column.
Material properties and loa...
Seismic activity imposes dynamic pressures on water tank walls, affecting structural integrity and stability.
Increased hydrostatic pressure due to water movement during seismic events.
Dynamic forces from ground shaking can lead to sloshing of water, exerting lateral pressures.
Tension and compression forces on tank walls can cause structural failure if not designed to withstand seismic loads.
Example: A tank filled to ca...
posted on 14 Aug 2024
I applied via Walk-in and was interviewed before Aug 2023. There was 1 interview round.
based on 1 interview experience
Difficulty level
Duration
based on 2 reviews
Rating in categories
Assistant Manager
62
salaries
| ₹4 L/yr - ₹8 L/yr |
Deputy Manager
59
salaries
| ₹4.4 L/yr - ₹10.2 L/yr |
Assistant Highway Engineer
31
salaries
| ₹3.6 L/yr - ₹6.1 L/yr |
Manager
30
salaries
| ₹6.2 L/yr - ₹10.8 L/yr |
Highway Design Engineer
30
salaries
| ₹4.2 L/yr - ₹5.8 L/yr |
L&T Energy Hydrocarbon
AECOM
Sterling & Wilson
Apco Infratech