Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
posted on 20 Jun 2022
I applied via Naukri.com and was interviewed before Jun 2021. There was 1 interview round.
posted on 13 Aug 2021
I applied via Naukri.com and was interviewed before Aug 2020. There were 4 interview rounds.
I appeared for an interview before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
based on 1 review
Rating in categories
Assistant Engineer
24
salaries
| ₹1.5 L/yr - ₹4.8 L/yr |
Assistant Manager
22
salaries
| ₹4.8 L/yr - ₹9.6 L/yr |
Senior Engineer
16
salaries
| ₹3.3 L/yr - ₹8.1 L/yr |
Accounts Officer
11
salaries
| ₹2.1 L/yr - ₹5.6 L/yr |
Deputy Manager Information Technology
9
salaries
| ₹7.1 L/yr - ₹8 L/yr |
L&T Construction
Tata Projects
Simplex Infrastructures
ITD Cementation India