Filter interviews by
PPAP (Production Part Approval Process) ensures that suppliers meet quality standards before mass production.
PPAP is used in the automotive and manufacturing industries.
It involves documentation to verify that parts meet specifications.
Key elements include design records, engineering change documents, and process flow diagrams.
Example: A car manufacturer requires PPAP from a supplier for a new engine component.
PPA...
Press operations can face various defects, requiring specific remedies to ensure efficiency and quality.
Misalignment: Ensure proper setup and calibration of the press to avoid misalignment issues.
Inconsistent Pressure: Regularly check pressure gauges and adjust settings to maintain consistent pressure across the operation.
Material Jamming: Implement regular maintenance and cleaning schedules to prevent material bu...
Yes, I have experience in increasing SPM in existing conditions through process optimization and efficiency improvements.
Implemented lean manufacturing principles to streamline production processes and increase SPM
Identified bottlenecks in operations and implemented solutions to improve overall efficiency
Utilized data analysis to identify areas for improvement and implemented changes accordingly
To change the battery in a Fanuc robot, follow these steps.
Locate the battery compartment on the robot controller.
Turn off the power to the robot and controller.
Remove the old battery carefully, ensuring not to damage any components.
Insert the new battery in the correct orientation.
Close the battery compartment and power on the robot to test.
Consult the Fanuc robot manual for specific instructions.
Mitsubishi PLC FX series input output refers to the range of input and output modules compatible with the FX series programmable logic controllers.
The FX series PLCs are compact and cost-effective controllers used for automation and control systems.
Input modules are used to receive signals from sensors and switches, while output modules are used to control actuators and devices.
The FX series IO modules come in var...
Chassis center is the central part of a vehicle's frame where the engine system is mounted and connected to the transmission.
Chassis center is the backbone of a vehicle's frame that supports the weight of the engine and other components.
The engine system includes the engine, transmission, drivetrain, and other related components that work together to power the vehicle.
The engine system is mounted on the chassis ce...
Our road map for progress involves expanding our market share, increasing efficiency, and investing in innovation.
Identify new markets and develop strategies to enter them
Streamline operations to reduce costs and improve productivity
Invest in research and development to create new products and services
Collaborate with partners and stakeholders to drive growth
Continuously monitor and adapt to changes in the market ...
The entry to exit process of an employee refers to the various stages involved in an employee's journey within an organization, from their initial onboarding to their eventual departure.
Onboarding: The process of welcoming a new employee to the organization, which includes completing paperwork, setting up their workspace, and introducing them to their team.
Training and Development: Providing the necessary training...
Training procedure involves identifying training needs, designing training programs, delivering training, and evaluating its effectiveness.
Identify training needs through performance appraisals and feedback
Design training programs based on identified needs
Deliver training through various methods like classroom sessions, on-the-job training, e-learning, etc.
Evaluate training effectiveness through feedback and asses...
Monthly MIS in HR involves data analysis and Excel formulas.
Monthly MIS report includes data on employee attendance, performance, and payroll.
Data analysis helps identify trends and areas for improvement.
Excel formulas can be used to calculate metrics such as employee turnover rate and average salary.
Pivot tables can be used to summarize and visualize data.
HR professionals use the MIS report to make informed decis...
posted on 20 Apr 2022
I applied via Naukri.com and was interviewed before Apr 2021. There were 3 interview rounds.
OEE improvement focuses on overall equipment efficiency, while SPM and SPP are specific metrics for measuring productivity.
OEE (Overall Equipment Efficiency) is a measure of how well a manufacturing process is utilized
SPM (Single Minute Exchange of Die) is a lean manufacturing technique to reduce setup times
SPP (Standard Production Pace) is a measure of the rate at which products are produced according to standard time...
Press operations can face various defects, requiring specific remedies to ensure efficiency and quality.
Misalignment: Ensure proper setup and calibration of the press to avoid misalignment issues.
Inconsistent Pressure: Regularly check pressure gauges and adjust settings to maintain consistent pressure across the operation.
Material Jamming: Implement regular maintenance and cleaning schedules to prevent material buildup...
Implemented cost-saving kaizen projects that improved efficiency and reduced waste in production processes.
Conducted a value stream mapping exercise to identify bottlenecks, resulting in a 15% reduction in lead time.
Introduced a 5S initiative that improved workplace organization, leading to a 20% increase in productivity.
Collaborated with cross-functional teams to streamline inventory management, reducing holding costs...
Yes, I have experience in increasing SPM in existing conditions through process optimization and efficiency improvements.
Implemented lean manufacturing principles to streamline production processes and increase SPM
Identified bottlenecks in operations and implemented solutions to improve overall efficiency
Utilized data analysis to identify areas for improvement and implemented changes accordingly
I appeared for an interview before Aug 2024, where I was asked the following questions.
I appeared for an interview in Mar 2025, where I was asked the following questions.
I applied via Company Website and was interviewed in Mar 2024. There were 2 interview rounds.
Sir my name is Anupal singh .My contact XXXXX
I applied via Campus Placement and was interviewed in Mar 2024. There were 3 interview rounds.
Math, English, reasoning,gk
I appeared for an interview in Sep 2024, where I was asked the following questions.
I appeared for an interview in Sep 2024, where I was asked the following questions.
Ratio analysis evaluates financial performance using key metrics to assess profitability, liquidity, and solvency.
Profitability Ratios: Measure a company's ability to generate profit. Example: Net Profit Margin = Net Income / Revenue.
Liquidity Ratios: Assess a company's ability to meet short-term obligations. Example: Current Ratio = Current Assets / Current Liabilities.
Solvency Ratios: Evaluate long-term financial sta...
I applied via Approached by Company and was interviewed in Dec 2023. There was 1 interview round.
To change the battery in a Fanuc robot, follow these steps.
Locate the battery compartment on the robot controller.
Turn off the power to the robot and controller.
Remove the old battery carefully, ensuring not to damage any components.
Insert the new battery in the correct orientation.
Close the battery compartment and power on the robot to test.
Consult the Fanuc robot manual for specific instructions.
Mitsubishi PLC FX series input output refers to the range of input and output modules compatible with the FX series programmable logic controllers.
The FX series PLCs are compact and cost-effective controllers used for automation and control systems.
Input modules are used to receive signals from sensors and switches, while output modules are used to control actuators and devices.
The FX series IO modules come in various ...
I applied via Walk-in and was interviewed in Oct 2023. There were 8 interview rounds.
Working with every one together
Every day we have a group discussion about the previous day
Every day we take the work from the previous shift and understand it
Every work serial by serial
I applied via Walk-in and was interviewed in Nov 2023. There were 2 interview rounds.
Top trending discussions
The duration of Jbm Auto Components interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 35 interview experiences
Difficulty level
Duration
based on 236 reviews
Rating in categories
Executive
67
salaries
| ₹2.3 L/yr - ₹6 L/yr |
Senior Executive
58
salaries
| ₹4.2 L/yr - ₹8.4 L/yr |
Assistant Manager
50
salaries
| ₹6.1 L/yr - ₹12 L/yr |
Production Engineer
47
salaries
| ₹1.6 L/yr - ₹5.1 L/yr |
Quality Engineer
40
salaries
| ₹1.5 L/yr - ₹4.8 L/yr |
Amara Raja Power Systems
Interface Microsystems
Koyo Bearings India
Joyson Safety Systems