Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by L&T Construction Team. If you also belong to the team, you can get access from here

L&T Construction Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

L&T Construction Civil Engineer-Water/Wastewater Interview Questions and Answers

Updated 9 Sep 2020

L&T Construction Civil Engineer-Water/Wastewater Interview Experiences

1 interview found

Interview Questionnaire 

2 Questions

  • Q1. What is sedimention?
  • Ans. 

    Sedimentation is the process of settling or deposition of suspended particles in water or wastewater.

    • It is a physical water treatment process.

    • It involves the use of gravity to separate solid particles from water.

    • Sedimentation tanks are used in water treatment plants to remove suspended solids.

    • It is also used in wastewater treatment to remove settleable solids before further treatment.

    • The settled solids are called sludg...

  • Answered by AI
  • Q2. What Is Flock?
  • Ans. 

    Flock is a process of adding chemicals to wastewater to create clusters of particles that can be easily removed.

    • Flock is used in wastewater treatment to remove suspended solids and other impurities.

    • Chemicals like alum or ferric chloride are added to wastewater to create flocs.

    • Flocs are clusters of particles that can be easily removed through sedimentation or filtration.

    • Flock is an important step in the wastewater treat...

  • Answered by AI

Skills evaluated in this interview

Top trending discussions

View All
Interview Hub
1w (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about L&T Construction?
Ask anonymously on communities.

Interview questions from similar companies

I applied via LinkedIn and was interviewed in May 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Question asked from my CV?

Interview Preparation Tips

Interview preparation tips for other job seekers - make your resume genuinely, avoid unwanted skills that you are not fit for that skill

Civil Engineer-Water/Wastewater Interview Questions Asked at Other Companies

asked in Infosys
Q1. How can rainwater that falls on roads and streets be utilized?
Q2. How is the website useful for a civil engineering position?
Q3. What is sedimentation?
Q4. What is Flock?

I applied via Referral and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Please tell me about yourself
  • Ans. I have 15 years experience in Highways Structure activities etc.
  • Answered Anonymously

Interview Preparation Tips

Topics to prepare for Larsen & Toubro Limited Assistant Manager interview:
  • Technical skill
Interview preparation tips for other job seekers - It was good experience in first time I faced lnt Sr. staff

I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Three people seat and asked Just simple technical questions frequently from civil engineering in hindi & English and watched the confidence level also. Some difficult questions is also there but they have ...
  • Q2. Forget now because long years ago it has been done.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & should have technical knowledge.

I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Piping code and welder qualifications test
  • Ans. 

    Piping code and welder qualifications test

    • Piping code refers to the set of standards and regulations that govern the design, fabrication, and inspection of piping systems.

    • Welder qualifications test is a process of testing and certifying welders to ensure that they have the necessary skills and knowledge to perform welding tasks safely and effectively.

    • Both piping code and welder qualifications test are important in ensu...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. What is your current ctc

Interview Preparation Tips

Interview preparation tips for other job seekers - Just specific to your answer.
WQT/wps required in detail

I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Question about material reconciliation, allowable wastage question based on previous work experience
  • Q2. It's not easy to describe it in a few words because of the interview time is more

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare point base answer what u have done in ur present service and what u r going to offer them by considering a technical aspects

L&T Construction HR Interview Questions

189 questions and answers

Q. What initiative have you taken in your previous roles?
Q. Can you describe the project work you have been involved in?
Q. What questions were you asked regarding your past experience?

I applied via Walk-in and was interviewed before Aug 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Work Experience related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare your resume well in line to your experience
Are these interview questions helpful?

I applied via Campus Placement and was interviewed before Jun 2021. There were 3 interview rounds.

Round 1 - Aptitude Test 

Mathematics, English, Reasoning

Round 2 - Technical 

(2 Questions)

  • Q1. They asked Technical questions
  • Q2. What is antenna What is satcom
  • Ans. 

    An antenna is a device that converts electrical signals into electromagnetic waves and vice versa. Satcom is short for satellite communication.

    • Antennas are used for transmitting and receiving signals in various applications such as radio, television, and wireless communication.

    • Satcom refers to the use of satellites for communication purposes, including television broadcasting, internet access, and military communicatio...

  • Answered by AI
Round 3 - Group Discussion 

Clean India
Corruption

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and believe in yourself

I applied via PLACEMENT

Interview Preparation Tips

Round: Technical Interview
Experience: Good detailed interview in terms of technical knowledge
Tips: Should be thorough with the projects you have done during the course

General Tips: be confident of what you put in your resume
Technical knowledge regarding projects undertaken during engineering should be sound
Be confident
Skills: Communication, Thinking capability, knowledge applying capability
College Name: V.E.S Institute Of Technology
Motivation: Opportunity to work in a renowned and core technical company
Funny Moments: We consider the interview panelists to be as tough as our viva externals. Interviewers are mostly on your side(contrary to viva professors :P)

I appeared for an interview before Sep 2016.

Interview Questionnaire 

1 Question

  • Q1. Ocampo, basic electronics and C

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 50

Skills: Embedded Systems, C Programming
College Name: Sahyadri college of engineering

L&T Construction Interview FAQs

What are the top questions asked in L&T Construction Civil Engineer-Water/Wastewater interview?

Some of the top questions asked at the L&T Construction Civil Engineer-Water/Wastewater interview -

  1. What is sedimenti...read more
  2. What Is Flo...read more

Tell us how to improve this page.

Assistant Manager
1.2k salaries
unlock blur

₹8.9 L/yr - ₹15.6 L/yr

Senior Engineer
734 salaries
unlock blur

₹5 L/yr - ₹11 L/yr

Assistant Construction Manager
521 salaries
unlock blur

₹9.2 L/yr - ₹17 L/yr

Site Engineer
408 salaries
unlock blur

₹2.4 L/yr - ₹7.1 L/yr

Civil Site Engineer
377 salaries
unlock blur

₹2.5 L/yr - ₹8.4 L/yr

Explore more salaries
Compare L&T Construction with

Larsen & Toubro Limited

3.9
Compare

Dilip Buildcon

3.9
Compare

Power Mech Projects

3.8
Compare

AtkinsRealis

3.8
Compare
write
Share an Interview