Premium Employer

i

This company page is being actively managed by Sterling & Wilson Team. If you also belong to the team, you can get access from here

Sterling & Wilson Verified Tick Work with us arrow

Compare button icon Compare button icon Compare

Proud winner of ABECA 2025 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Sterling & Wilson Senior Engineer Interview Questions and Answers

Updated 10 Sep 2023

Sterling & Wilson Senior Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About salary and experience
Round 3 - Technical 

(4 Questions)

  • Q1. Chiller trouble shooting
  • Q2. Work of cchiller
  • Ans. 

    A chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle.

    • Chillers are commonly used in air conditioning systems to cool buildings or industrial processes.

    • They work by transferring heat from the liquid being chilled to a separate fluid, which is then circulated through a heat exchanger to cool it down.

    • Chillers can be water-cooled or air-cooled, depending on the app...

  • Answered by AI
  • Q3. Alarm and solutions
  • Q4. Controlling andetc
Round 4 - Group Discussion 

Salary and job responsibilities

Top trending discussions

View All
Interview Hub
5d (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about Sterling & Wilson?
Ask anonymously on communities.

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed before Jun 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. All about Execution work.
  • Q2. Long answer.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be patience and effort for you.

Senior Engineer Interview Questions Asked at Other Companies

Q1. What does the 'M' signify in M20, M25, and M30 grades of concrete ... read more
asked in Nagarro
Q2. Write a program that takes an integer N and an array of integers ... read more
asked in Tata Elxsi
Q3. What is Quality Assurance. Difference between Quality assurance a ... read more
Q4. Is it possible to work with multiple threads in core data? If so, ... read more
Q5. When would you perform a half or full engine overhaul?

I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions relating to our job in deep. That's it

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever you know about say genuinely and be confident always. Don't hesitate at all.
Put your thoughts clearly.

I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About structur like, Shuttring and steel dia wise wait per/m special gravity of cement & aggregate, related QC

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majorly a stress test. It lasted for about 1 hour 10 minutes. The interviewer wanted to test both my knowledge and communication skills. Most of the questions asked to me were related to my B.Tech curriculum i.e. Civil Engineer site experience related topics. He stressed a lot on the basics related to my project topic. Luckily I was able to answer most of the questions correctly. I tried to answer each question with examples and also used props on the table (like pens, paperweights, pen stands etc.) to explain my theories. It was my first offcampus interview, and I think I did pretty well for a fresher. You need to stay calm and should apply presence of mind. Please go through the job description thoroughly word-by-word and recheck your resume to ensure that you are a best-fit for the position.

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Ans. 

    A man day is a unit of measure representing the amount of work one person can complete in a single day.

    • Typically used in project management to estimate labor costs and timelines.

    • One man day usually equals 8 hours of work.

    • For example, if a task requires 40 man days, it would take one person 40 days or 5 people 8 days to complete.

    • Helps in resource allocation and planning for projects.

  • Answered by AI
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

Sterling & Wilson HR Interview Questions

14 questions and answers

Q. Describe yourself.
Q. What strategies do you use to motivate your team and improve overall perfor ... read more
Q. How do you ensure effective communication between different departments or ... read more

I applied via Approached by Company and was interviewed in Oct 2018. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Baching plant Rmu Tamrock Shotcrete machine Grouting pumps Layout of project Crusher plant
  • Q2. Why you want to join Why you want to leave Why we hire you
  • Ans. 

    I want to join to further develop my skills, seeking new challenges. I am leaving for career growth opportunities. You should hire me for my experience and expertise.

    • Seeking new challenges and opportunities for skill development

    • Leaving for career growth and advancement

    • Experience and expertise in the field

    • Ability to contribute effectively to the team and projects

  • Answered by AI

Interview Preparation Tips

General Tips: Be positive
Be prepared
Be calm
Don't be stressed


Skills: Communication, Problem Solving, Leadership, Time Management
Duration: <1 week
Are these interview questions helpful?

I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Basic questions

Interview Preparation Tips

Interview preparation tips for other job seekers - candidates which were recruited by JMC in the year 2018 are getting less payments than the students recruited in the year 2019. The same happened to me and I left just because casual behavior from the management.

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?

I applied via Company Website and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About site handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Should be good technical knowledge

Sterling & Wilson Interview FAQs

How many rounds are there in Sterling & Wilson Senior Engineer interview?
Sterling & Wilson interview process usually has 4 rounds. The most common rounds in the Sterling & Wilson interview process are Group Discussion, Resume Shortlist and HR.
How to prepare for Sterling & Wilson Senior Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Sterling & Wilson. The most common topics and skills that interviewers at Sterling & Wilson expect are Tendering, Bidding, Civil Engineering, Contracts and Estimation Engineering.
What are the top questions asked in Sterling & Wilson Senior Engineer interview?

Some of the top questions asked at the Sterling & Wilson Senior Engineer interview -

  1. Work of cchil...read more
  2. Chiller trouble shoot...read more
  3. Alarm and soluti...read more

Tell us how to improve this page.

Overall Interview Experience Rating

5/5

based on 1 interview experience

Difficulty level

Moderate 100%

Duration

Less than 2 weeks 100%
View more
Join Sterling & Wilson One of India’s leading EPC company
Sterling & Wilson Senior Engineer Salary
based on 211 salaries
₹4.6 L/yr - ₹8.5 L/yr
26% less than the average Senior Engineer Salary in India
View more details

Sterling & Wilson Senior Engineer Reviews and Ratings

based on 45 reviews

3.9/5

Rating in categories

3.6

Skill development

3.6

Work-life balance

3.4

Salary

3.6

Job security

3.4

Company culture

3.4

Promotions

3.4

Work satisfaction

Explore 45 Reviews and Ratings
Electrical Engineer
240 salaries
unlock blur

₹2.4 L/yr - ₹7 L/yr

Senior Engineer
213 salaries
unlock blur

₹4.5 L/yr - ₹10 L/yr

Assistant Manager
208 salaries
unlock blur

₹6 L/yr - ₹14.1 L/yr

Project Engineer
185 salaries
unlock blur

₹3.3 L/yr - ₹7.9 L/yr

Engineer
137 salaries
unlock blur

₹2.5 L/yr - ₹8 L/yr

Explore more salaries
Compare Sterling & Wilson with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.2
Compare
write
Share an Interview