Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Laser Power & Infra Team. If you also belong to the team, you can get access from here

Laser Power & Infra Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Laser Power & Infra Site Engineer Interview Questions and Answers

Updated 15 Jul 2025

Laser Power & Infra Site Engineer Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image Sivaprasad Nanda

posted on 15 Jul 2025

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Jul 2024, where I was asked the following questions.

  • Q1. About Contractor Billing & reconciliation
  • Q2. Line Material & Work management

Top trending discussions

View All
Interview Hub
1w (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about Laser Power & Infra?
Ask anonymously on communities.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before May 2024, where I was asked the following questions.

  • Q1. How can you install 11/0.44 kv DTR and what should be material required?
  • Ans. 

    Installing an 11/0.44 kV Distribution Transformer (DTR) involves careful planning, material selection, and adherence to safety standards.

    • Site Preparation: Ensure the installation site is level and accessible.

    • Foundation: Construct a concrete foundation to support the DTR's weight.

    • Transformer Placement: Use a crane or hoist to position the DTR on the foundation.

    • Electrical Connections: Connect primary and secondary windin...

  • Answered by AI
  • Q2. What is the distance between two PCC pole ? And how much depth required for pole erection?
  • Ans. 

    The distance between PCC poles varies based on application, typically 8-10 meters, with a depth of 1.5-2 meters for stability.

    • Standard distance for street lighting poles is usually 8-10 meters apart.

    • For transmission lines, the distance can range from 100-150 meters depending on voltage.

    • Depth for pole erection generally ranges from 1.5 to 2 meters for stability.

    • In soft soil conditions, deeper foundations may be required...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive and cool mind with smile you face.

Site Engineer Interview Questions Asked at Other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimensio ... read more
Q2. What is the definition of rolling margin in the context of steel?
Q3. Which type of pipeline and standards do you follow?
Q4. design? 1.what is ASD in steel design? 2.what is special consider ... read more
Q5. What is the lapping zone of beam rebar at top and bottom...? Why ... read more

I applied via Naukri.com and was interviewed before Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About circuit breaker, transformer.
  • Q2. Single line diagrams, layout, substation calculation.

Interview Preparation Tips

Interview preparation tips for other job seekers - Please go through substation calculation and equipment.

I applied via Company Website and was interviewed in Jul 2021. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Tell me about yourself.
Round 2 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 3 - HR 

Interview Preparation Tips

Interview preparation tips for other job seekers - Recently I find job , i have five year experience in optical fiber cables ltd
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - HR 

(2 Questions)

  • Q1. Work experience?
  • Q2. Educational and work details details?
Round 2 - Technical 

(2 Questions)

  • Q1. Civil engineering related questions
  • Q2. Assignment for costing and Estimation
  • Ans. 

    Costing and estimation assignment for Senior Engineer position

    • Understand the scope of the project and gather all relevant information

    • Break down the project into smaller tasks and estimate the time and cost for each task

    • Consider factors such as materials, labor, equipment, and overhead costs

    • Use historical data or industry benchmarks to validate your estimates

    • Provide a detailed cost breakdown and justification for your e...

  • Answered by AI
Round 3 - Aptitude Test 

Computer software skills

Round 4 - Assignment 

Estimation & costing related work

Round 5 - HR 

(2 Questions)

  • Q1. Documents check
  • Q2. Salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Need a proper knowledge about your profile and proper documentation for further process
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Basic knowledge
  • Q2. Switchgear knowledge
  • Q3. Marketing knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive

Laser Power & Infra HR Interview Questions

8 questions and answers

Q. Do you think you are successful?
Q. Why do you want to switch your job?
Q. What can you tell me about your academic background?
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Previous project cost and scope
  • Ans. 

    Led a project with a budget of $500K, focusing on developing a scalable web application for e-commerce.

    • Budget: $500,000 allocated for development, testing, and deployment.

    • Scope included designing a user-friendly interface and backend integration.

    • Implemented features like real-time inventory tracking and payment processing.

    • Team size: 8 engineers, including front-end and back-end developers.

    • Timeline: 6 months from initia...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Cable type and current carrying capacity and also methode of Laying
  • Ans. 

    Different cable types have varying current carrying capacities and methods of laying, impacting overall electrical system performance.

    • Different cable types such as PVC, XLPE, and rubber have different current carrying capacities.

    • Current carrying capacity is influenced by factors like conductor size, insulation material, and ambient temperature.

    • Methods of laying cables include direct burial, conduit installation, and ov...

  • Answered by AI
  • Q2. Xlpe cable are used in ug cable and cable capacity can be varry as per size of cable
Are these interview questions helpful?

I applied via Recruitment Consultant and was interviewed in Dec 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. All the questions were related to job profile.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be ready to questions which is related to job profile.

Senior Engineer Interview Questions & Answers

KEI Industries user image GANDU VENKATESWARA RAO

posted on 5 Nov 2023

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Transformers Installation
Round 3 - Technical 

(1 Question)

  • Q1. Eelctrical Testing for equiomemt
  • Ans. 

    Electrical testing for equipment involves verifying functionality and safety through various tests.

    • Perform insulation resistance tests to check for any leakage currents

    • Conduct continuity tests to ensure proper electrical connections

    • Verify voltage and current ratings are within acceptable limits

    • Test for proper grounding to prevent electrical hazards

    • Use specialized equipment like multimeters and insulation testers

    • Documen...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Small projects regular location transfers

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. GD&T QUESTION? Technical question?
  • Q2. GD&T- Geometric dimensioning & Tolerancing

Interview Preparation Tips

Interview preparation tips for other job seekers - Very through with technical knowledge.
Good knowledge of practical.
Confidence will add advantage.

Laser Power & Infra Interview FAQs

What are the top questions asked in Laser Power & Infra Site Engineer interview?

Some of the top questions asked at the Laser Power & Infra Site Engineer interview -

  1. About Contractor Billing & reconciliat...read more
  2. Line Material & Work managem...read more

Tell us how to improve this page.

Overall Interview Experience Rating

4/5

based on 2 interview experiences

Difficulty level

Easy 100%

Duration

Less than 2 weeks 100%
View more
Laser Power & Infra Site Engineer Salary
based on 29 salaries
₹2.7 L/yr - ₹4.6 L/yr
7% less than the average Site Engineer Salary in India
View more details

Laser Power & Infra Site Engineer Reviews and Ratings

based on 23 reviews

4.0/5

Rating in categories

3.8

Skill development

4.0

Work-life balance

3.9

Salary

3.6

Job security

3.9

Company culture

3.6

Promotions

3.7

Work satisfaction

Explore 23 Reviews and Ratings
Senior Engineer
54 salaries
unlock blur

₹3.6 L/yr - ₹6.5 L/yr

Assistant Manager
29 salaries
unlock blur

₹4.6 L/yr - ₹8.4 L/yr

Site Engineer
29 salaries
unlock blur

₹2.7 L/yr - ₹4.6 L/yr

Project Engineer
28 salaries
unlock blur

₹2.4 L/yr - ₹5.2 L/yr

Electrical Engineer
26 salaries
unlock blur

₹1.7 L/yr - ₹5 L/yr

Explore more salaries
Compare Laser Power & Infra with

Polycab Wires

4.0
Compare

CG Power and Industrial Solutions

3.9
Compare

C&S Electric

4.0
Compare

KEI Industries

4.2
Compare
write
Share an Interview