I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.
Laying HDPE pipes involves careful planning, trenching, and proper installation techniques to ensure durability and functionality.
1. Site Preparation: Clear the area of debris and vegetation to ensure a smooth installation.
2. Trenching: Dig a trench that is wide and deep enough to accommodate the pipe and any necessary bedding material.
3. Pipe Joining: Use heat fusion or mechanical fittings to join HDPE pipes securely,...
Laying DI pipe involves several steps and considerations.
Prepare the trench by removing any debris and ensuring proper alignment.
Place a bedding material, such as sand or gravel, at the bottom of the trench to provide support.
Carefully lower the DI pipe into the trench, ensuring it is aligned properly.
Connect the DI pipe sections using appropriate fittings and joints.
Backfill the trench with the excavated soil, compact...
Laying DWC pipes involves careful planning, trench preparation, and proper installation techniques for effective drainage.
1. Plan the layout: Determine the route for the DWC pipes considering slope and drainage requirements.
2. Prepare the trench: Excavate a trench that is wide enough for the pipes and deep enough to maintain the required slope.
3. Install bedding: Place a layer of sand or gravel at the bottom of the tre...
Laying RCC Hume pipes involves careful planning, excavation, and proper alignment for effective drainage and sewage systems.
1. Site Preparation: Clear the area of debris and vegetation to ensure a stable foundation.
2. Excavation: Dig a trench with a width and depth suitable for the pipe diameter and bedding material.
3. Bedding: Lay a bed of sand or gravel to provide support and prevent damage to the pipe.
4. Pipe Placem...
Dsa with markers and pen and
I applied via Company Website and was interviewed in Feb 2022. There were 3 interview rounds.
Site management
I applied via Naukri.com and was interviewed in Sep 2021. There were 4 interview rounds.
Top trending discussions
I applied via Company Website and was interviewed before Apr 2021. There was 1 interview round.
Aspiring logistics intern with a keen interest in supply chain management and a strong foundation in operations.
Currently pursuing a degree in Logistics and Supply Chain Management.
Completed an internship at XYZ Logistics, where I assisted in inventory management.
Familiar with key logistics concepts like warehousing, transportation, and distribution.
Adani Ports and Logistics operates a vast network of ports and inland ...
I applied via Referral and was interviewed before Aug 2022. There were 4 interview rounds.
Prepare for aptitude
I applied via Recruitment Consulltant and was interviewed before Sep 2022. There were 3 interview rounds.
based on 11 interview experiences
Difficulty level
Duration
based on 53 reviews
Rating in categories
Electrician
13
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Safety Officer
8
salaries
| ₹3 L/yr - ₹5 L/yr |
Driver
6
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Welder
5
salaries
| ₹3 L/yr - ₹4 L/yr |
Safety Engineer
5
salaries
| ₹6 L/yr - ₹7.2 L/yr |
CMA CGM
Adani Ports and SEZ
Hapag-Lloyd
Mediterranean Shipping Company