I appeared for an interview in Mar 2025, where I was asked the following questions.
ASME Section V covers Nondestructive Testing, while Section VIII focuses on Pressure Vessels.
ASME Section V outlines methods for nondestructive testing (NDT) such as ultrasonic, radiographic, and magnetic particle testing.
ASME Section VIII provides guidelines for the design, fabrication, and inspection of pressure vessels, ensuring safety and reliability.
Example of Section V: Using ultrasonic testing to detect flaws in...
Tank fabrication erection involves systematic assembly and installation of tanks for storage or processing.
Site preparation: Ensure the foundation is level and capable of supporting the tank's weight.
Material selection: Use appropriate materials like carbon steel or stainless steel based on the tank's purpose.
Welding techniques: Employ methods such as MIG or TIG welding for strong joints.
Safety measures: Implement safe...
An inspection testing plan outlines procedures to ensure product quality and compliance with standards.
Define objectives: Ensure products meet quality standards, e.g., safety and efficacy in pharmaceuticals.
Identify inspection points: Determine critical stages for inspection, such as raw material receipt and final product testing.
Select testing methods: Use appropriate techniques like visual inspection, chemical analys...
Top trending discussions
I appeared for an interview before Apr 2024, where I was asked the following questions.
Grinding requires specific tools, materials, and techniques to achieve desired surface finishes and dimensions.
Grinding wheel: Essential for material removal; examples include aluminum oxide and silicon carbide wheels.
Workpiece material: The type of material being ground affects wheel selection; for instance, steel requires different wheels than ceramics.
Machine setup: Proper alignment and speed settings are crucial fo...
I have extensive experience in designing and optimizing line setups to enhance process flow and efficiency in various operations.
Analyzed workflow to identify bottlenecks and streamline processes, improving overall efficiency by 20%.
Implemented a lean manufacturing approach, reducing waste and optimizing resource allocation.
Designed a flexible line setup that allowed for quick changeovers between different product line...
I appeared for an interview before Jun 2024, where I was asked the following questions.
As a team leader, I manage projects, oversee staff, and ensure operational efficiency while driving strategic initiatives.
Lead a team of 10 in executing projects, ensuring deadlines are met and quality standards are upheld.
Develop and implement strategic plans that align with company goals, such as increasing productivity by 15% over the last year.
Conduct regular performance reviews and provide coaching to team members...
Distillation column design involves principles like stage calculation, reboiler design, and efficiency optimization.
Theoretical stages are calculated using the McCabe-Thiele method, which involves plotting equilibrium and operating lines.
The number of stages can also be determined using the Fenske equation for ideal systems, which provides a minimum stage count.
Reboiler design must consider heat transfer efficiency, ty...
I applied via Naukri.com and was interviewed before May 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Oct 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Nov 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Jun 2022. There were 2 interview rounds.
IR testing stands for Infrared testing, a non-destructive testing method used to detect defects or anomalies in materials.
IR testing uses infrared radiation to detect temperature differences in materials
It is commonly used in electrical inspections to identify hot spots in circuits
IR testing can also be used in building inspections to detect moisture or insulation issues
A heat exchanger is a device used to transfer heat between two or more fluids, typically to cool or heat a process stream.
Heat exchangers can be found in various applications such as HVAC systems, refrigeration units, and chemical processing plants.
They work by allowing heat to transfer from one fluid to another without the fluids mixing.
Common types of heat exchangers include shell and tube, plate, and finned tube exc...
Brazing process involves joining metals using a filler metal that melts above 450°C. CTP/CTQ stands for Critical to Process/Critical to Quality.
Brazing is a metal-joining process where a filler metal is melted and distributed between two or more close-fitting parts by capillary action.
The filler metal has a melting point above 450°C but below the melting point of the base metals being joined.
CTP/CTQ are key parameters ...
Run test and performance test parameters are essential for evaluating system performance.
Run test measures how a system performs under normal conditions.
Performance test evaluates system performance under stress or heavy load.
Parameters include response time, throughput, CPU usage, memory usage, etc.
Examples of tools for performance testing: JMeter, LoadRunner, Apache Bench.
By implementing strict inventory management procedures, conducting regular audits, utilizing technology for tracking, and training staff on proper inventory handling.
Implementing strict inventory management procedures to ensure accuracy
Conducting regular audits to identify and rectify any discrepancies
Utilizing technology such as inventory management software for real-time tracking
Training staff on proper inventory han...
I will implement a more efficient inventory management system, streamline the ordering process, and improve staff training.
Implementing a barcode scanning system to track inventory levels accurately
Creating standardized procedures for ordering and restocking
Providing regular training sessions for staff on proper inventory management techniques
I appeared for an interview before Mar 2024, where I was asked the following questions.
As a Store Manager, my daily work involves overseeing operations, managing staff, and ensuring customer satisfaction.
Start the day with a team briefing to discuss goals and tasks.
Monitor inventory levels and place orders as needed, e.g., ensuring popular items are stocked.
Handle customer inquiries and complaints to maintain high satisfaction, such as resolving a return issue.
Conduct staff training sessions to improve s...
based on 1 interview experience
Difficulty level
Duration
based on 3 reviews
Rating in categories
Assistant Manager
39
salaries
| ₹5.8 L/yr - ₹12 L/yr |
Project Engineer
39
salaries
| ₹2.5 L/yr - ₹6.6 L/yr |
Senior Engineer
19
salaries
| ₹5 L/yr - ₹8.9 L/yr |
Project Manager
18
salaries
| ₹14.6 L/yr - ₹23.5 L/yr |
Deputy Manager
18
salaries
| ₹10 L/yr - ₹18 L/yr |
Gandhi Automations
Sulzer
Bharat Fritz Werner
Western Refrigeration