Filter interviews by
Basement mechanical ventilation system is designed to remove stale air and moisture from the basement and replace it with fresh air.
The system consists of an exhaust fan that pulls out stale air and moisture from the basement.
Fresh air is brought in through an intake vent or duct.
The system may also include a dehumidifier to control moisture levels.
Proper maintenance is important to ensure the system functions eff...
Steel testing includes mechanical, chemical, and physical tests to ensure quality and safety.
Mechanical tests include tensile, compression, and impact tests to measure strength and toughness.
Chemical tests analyze the composition of the steel to ensure it meets required standards.
Physical tests include hardness, corrosion resistance, and fatigue tests to assess durability and performance.
Non-destructive testing me...
TCP is connection-oriented and reliable while UDP is connectionless and unreliable.
TCP establishes a connection before data transfer while UDP does not.
TCP ensures data delivery and order while UDP does not guarantee either.
TCP is slower but more secure while UDP is faster but less secure.
TCP is used for applications like email, file transfer, and web browsing while UDP is used for applications like video streamin...
The protocols used in the transport layer of the OSI model are TCP (Transmission Control Protocol) and UDP (User Datagram Protocol).
TCP (Transmission Control Protocol) provides reliable, connection-oriented communication.
UDP (User Datagram Protocol) provides unreliable, connectionless communication.
TCP is used for applications that require guaranteed delivery of data, such as web browsing and email.
UDP is used for...
Automatic sprinkler system, Hydrant system and FAPA system are fire protection systems used in buildings.
Automatic sprinkler system is a fire suppression system that uses water to extinguish fires. It consists of a network of pipes with sprinkler heads that activate when heat is detected.
Hydrant system is a fire protection system that uses water from a pressurized source to extinguish fires. It consists of a netwo...
Types of doors include swing doors, sliding doors, revolving doors, and folding doors.
Swing doors open on hinges like a traditional door.
Sliding doors move horizontally along a track.
Revolving doors have multiple panels that rotate around a central axis.
Folding doors consist of multiple panels that fold to open or close.
Other types include pocket doors, barn doors, and French doors.
Technical aspects of building involve understanding structural design, materials, construction methods, and building codes.
Understanding structural design principles such as load-bearing capacity and stability
Knowledge of different building materials and their properties
Familiarity with construction methods and techniques
Adherence to building codes and regulations to ensure safety and compliance
Failures of building can be due to various reasons such as poor construction, natural disasters, or lack of maintenance.
Poor construction practices leading to structural weaknesses
Natural disasters like earthquakes, hurricanes, or floods
Lack of regular maintenance causing deterioration over time
The workflow and specifications of a project involve understanding the steps and requirements for completing a task.
Understand the project goals and objectives
Identify the tasks and subtasks involved
Define the requirements and specifications
Create a timeline and assign responsibilities
Test and validate the project deliverables
There are two types of water supply systems - direct and indirect.
Direct water supply system - water is supplied directly from the mains to the point of use without any storage tank.
Indirect water supply system - water is stored in a tank and then supplied to the point of use through pipes.
Direct systems are commonly used in high-rise buildings while indirect systems are used in low-rise buildings.
Direct systems a...
I applied via Naukri.com and was interviewed in Sep 2024. There were 2 interview rounds.
I am a highly experienced Senior Purchase Executive with a proven track record of successful procurement strategies and cost savings.
Over 10 years of experience in procurement and supply chain management
Strong negotiation skills with a focus on cost reduction
Expertise in vendor management and contract negotiations
Implemented strategic sourcing initiatives resulting in significant cost savings
Proficient in market analys...
I have over 10 years of experience in procurement and purchasing, with a focus on negotiating contracts and managing supplier relationships.
Managed procurement process from sourcing to delivery
Negotiated contracts with suppliers to ensure cost-effectiveness
Developed and maintained relationships with key vendors
Implemented cost-saving strategies such as bulk purchasing and vendor consolidation
Seeking new challenges and growth opportunities
Desire for career advancement
Looking for new challenges and learning experiences
Seeking a more dynamic work environment
Interested in exploring different industries or sectors
Yes, I will join after my notice period once the offer is received.
I understand the importance of fulfilling my notice period to ensure a smooth transition.
I am committed to honoring my professional obligations and responsibilities.
I will work with my current employer to ensure a proper handover before joining the new role.
I applied via Job Portal and was interviewed in Apr 2024. There were 3 interview rounds.
Ppt preparation on real estate on deck making skills
I applied via Company Website and was interviewed in Mar 2024. There were 4 interview rounds.
Per Sft rates on Packages refer to the cost per square foot for different contract packages.
Per Sft rates are used to determine the cost of each square foot in a contract package.
These rates can vary based on the type of package and the included services.
For example, a construction contract package may have different per Sft rates for labor, materials, and overhead costs.
Dynamic professional with 7 years of experience in management, skilled in team leadership and project execution.
Background in business administration with a focus on operations management.
Led a team of 10 in a successful project that increased efficiency by 20%.
Strong communication skills, demonstrated through regular presentations to stakeholders.
Passionate about mentoring junior staff, resulting in improved team perf...
I appeared for an interview in Sep 2024, where I was asked the following questions.
Top trending discussions
The duration of Brigade Group interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 40 interview experiences
Difficulty level
Duration
based on 444 reviews
Rating in categories
15-20 Yrs
Not Disclosed
Deputy Manager
148
salaries
| ₹5.8 L/yr - ₹13 L/yr |
Senior Engineer
100
salaries
| ₹4.5 L/yr - ₹9.2 L/yr |
Project Engineer
73
salaries
| ₹3.4 L/yr - ₹7.6 L/yr |
Project Manager
53
salaries
| ₹9.7 L/yr - ₹17.5 L/yr |
Senior Executive
47
salaries
| ₹4 L/yr - ₹8.3 L/yr |
Sobha
Godrej Properties
DLF
Surya Roshni