I applied via AmbitionBox and was interviewed in Nov 2022. There were 2 interview rounds.
Top trending discussions
I will implement ISO systems by conducting a gap analysis, creating a plan, and providing training to site engineers.
Conduct a gap analysis to identify areas of improvement
Create a plan to implement ISO systems
Provide training to site engineers on ISO standards and quality improvements
Establish a system for monitoring and measuring quality performance
Encourage continuous improvement through regular audits and reviews
posted on 15 Jul 2021
I applied via Referral and was interviewed before Jul 2020. There were 3 interview rounds.
posted on 30 Apr 2025
I appeared for an interview before Apr 2024, where I was asked the following questions.
I applied via Company Website and was interviewed before Oct 2022. There were 3 interview rounds.
Works activity plane, manpower, drawing ditels, proper tool, power tools & good working area
I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.
Reassess the situation, identify what went wrong and create a new plan or adjust existing.
Managing a low-budget project requires strategic planning, resource optimization, and effective communication to ensure successful completion.
Prioritize project tasks: Focus on critical tasks that deliver the most value. For example, use the MoSCoW method to categorize tasks.
Leverage existing resources: Utilize in-house skills and tools to minimize costs. For instance, if your team has design expertise, use them instea...
Effective management of labor and materials ensures project efficiency, cost control, and timely completion.
Plan resource allocation: Assess project needs and allocate labor and materials accordingly.
Use project management software: Tools like MS Project or Trello can help track labor hours and material usage.
Implement just-in-time inventory: Reduce waste by ordering materials as needed, minimizing storage costs.
Conduc...
Effective problem-solving involves identifying issues, analyzing options, and implementing solutions systematically.
Define the problem clearly: For example, if a project is behind schedule, specify the reasons such as resource allocation or unforeseen delays.
Gather relevant information: Collect data from team members, project reports, and stakeholder feedback to understand the context.
Analyze potential solutions: Evalu...
Maintaining quality involves systematic processes, adherence to standards, and continuous improvement to ensure project success.
Implement a quality management system (QMS) to standardize processes and ensure compliance.
Conduct regular training sessions for team members to keep them updated on best practices.
Utilize quality control tools like Six Sigma or Lean methodologies to identify and eliminate defects.
Perform regu...
I appeared for an interview before Apr 2024, where I was asked the following questions.
Output of machinery, manpower, and materials affects project efficiency and delivery timelines.
Machinery output is measured in units produced per hour; e.g., a crane can lift 10 tons per hour.
Manpower output is often quantified by tasks completed; e.g., a team of 5 can finish a task in 2 days.
Material output is determined by availability and quality; e.g., high-quality steel can reduce waste and improve durability.
Bala...
Understanding concrete grades and project management roles is crucial for successful construction projects.
Concrete grades are classified based on compressive strength, e.g., M20, M25, M30.
M20 is suitable for residential buildings, while M30 is used for commercial structures.
As a Project Manager, I oversee project planning, scheduling, and resource allocation.
I ensure compliance with safety standards and quality contro...
posted on 13 Jul 2023
QS codes are used in Quantity Surveying to categorize and organize different items and costs related to a construction project.
QS codes are alphanumeric codes used to identify specific items or costs in a construction project.
They help in standardizing the categorization and organization of project data.
For example, a QS code for 'concrete foundation' could be CF001.
These codes are often used in cost estimation, budget...
Various codes are used in design, such as color codes, HTML codes, CSS codes, and design software codes.
Color codes are used to specify colors in design, such as #FFFFFF for white.
HTML codes are used to structure web pages, like
CSS codes are used to style elements on a webpage, such as font-size: 16px;
Design software codes refer to commands and functions within design tools like Adobe Photoshop or Illus...
A firewall is a network security system that monitors and controls incoming and outgoing network traffic based on predetermined security rules.
Acts as a barrier between a trusted internal network and untrusted external network
Filters network traffic based on set rules to prevent unauthorized access
Can be hardware-based or software-based
Examples include Cisco ASA, Palo Alto Networks, and pfSense
Setting up an AD involves creating a new Active Directory domain and configuring settings.
Install the Active Directory Domain Services role on a Windows Server
Run the Active Directory Domain Services Configuration Wizard to create a new domain
Configure DNS settings to support the new domain
Add users, groups, and computers to the domain
Set up Group Policies to manage security and settings within the domain
What is your expectation of salary
based on 1 interview experience
Difficulty level
Duration
based on 2 reviews
Rating in categories
Site Engineer
86
salaries
| ₹1 L/yr - ₹4.6 L/yr |
Civil Site Engineer
54
salaries
| ₹1.1 L/yr - ₹4 L/yr |
Senior Engineer
22
salaries
| ₹3.2 L/yr - ₹7.5 L/yr |
Civil Engineer
14
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Senior Site Engineer
9
salaries
| ₹3 L/yr - ₹5.1 L/yr |
Ramky Infrastructure
McNally Bharat Engineering
SYSTRA
Techno Electric & Engineering Company