Reinforcement detailing of a chajja involves providing steel bars to support the overhanging structure.
Chajja is a projecting eave or sunshade typically found in Indian architecture.
Reinforcement detailing includes providing horizontal and vertical steel bars to support the chajja.
The size and spacing of the steel bars are determined based on the load and span of the chajja.
Proper anchoring of the steel bars into ...
The area of a trapezium can be calculated by taking the average of the two parallel sides and multiplying it by the height.
Find the length of the two parallel sides of the trapezium.
Determine the height of the trapezium, which is the perpendicular distance between the two parallel sides.
Use the formula: Area = (a + b) * h / 2, where a and b are the lengths of the parallel sides and h is the height.
The unit weight of steel is typically around 7850 kg/m^3.
The unit weight of steel is commonly used in structural engineering to calculate the weight of steel members in a structure.
The unit weight of steel is approximately 7850 kg/m^3, but can vary slightly depending on the specific type of steel.
For example, the unit weight of stainless steel is around 7480 kg/m^3, while the unit weight of carbon steel is around ...
The minimum % of steel in a RCC column is typically around 1% to 2%.
The minimum % of steel in a RCC column is usually around 1% to 2% to provide adequate strength and reinforcement.
The exact percentage may vary depending on the design requirements and load conditions.
Using too little steel can compromise the structural integrity of the column, while using too much steel can lead to excessive costs.
For example, a t...
Volume of earthwork in a road can be calculated using cross-sectional area and length of the road.
Calculate the cross-sectional area of the road at regular intervals
Measure the length of the road
Multiply the cross-sectional area by the length to get the volume of earthwork
For example, if the cross-sectional area is 100 square meters and the length of the road is 1 kilometer, the volume of earthwork would be 100 cu...
Cover requirement for extreme condition is essential for structural integrity and safety.
Ensure materials used can withstand extreme temperatures, pressures, or forces.
Consider factors like seismic activity, wind loads, and snow loads in design.
Include redundancy and fail-safe measures to prevent catastrophic failure.
Regular inspections and maintenance to ensure continued performance under extreme conditions.
To find the area of an irregular figure, break it down into simpler shapes and calculate their areas separately.
Break down the irregular figure into simpler shapes like rectangles, triangles, circles, etc.
Calculate the area of each simpler shape using the appropriate formula (e.g. area of a rectangle = length x width, area of a triangle = 0.5 x base x height).
Add up the areas of all the simpler shapes to get the t...
The minimum grade of concrete in an RCC structure should be M20.
The minimum grade of concrete in an RCC structure is typically M20, which means the concrete mix has a compressive strength of 20 megapascals after 28 days.
Higher grades of concrete such as M25, M30, M35, etc., can also be used depending on the structural requirements.
The grade of concrete is specified in the structural design based on factors like th...
The deflection angle of a transcurve is the angle between the tangent lines at the beginning and end of the curve.
The deflection angle of a transcurve is typically denoted by delta (Δ).
It is the angle formed between the tangent lines at the beginning and end of the curve.
The deflection angle is used in civil engineering for designing curved roads, railways, and other infrastructure.
It helps in determining the curv...
Weep holes are crucial for drainage in structures; minimum diameter typically ranges from 10mm to 20mm.
Weep holes allow water to escape from behind walls, preventing pressure buildup.
Minimum diameter is often specified as 10mm to ensure effective drainage.
In some cases, a diameter of 20mm may be used for larger structures or higher water flow.
Placement should be at regular intervals, typically every 1 to 2 meters.
...
I applied via Campus Placement and was interviewed in May 2024. There was 1 interview round.
Strength of concrete refers to its ability to withstand loads or stresses without breaking or deforming.
Strength of concrete is typically measured in terms of compressive strength, which is the maximum load it can bear before failure.
Factors affecting concrete strength include water-cement ratio, curing conditions, aggregate quality, and admixtures.
Concrete with higher strength is often used in structural applications ...
I completed two internships focused on structural design and site management, gaining hands-on experience in civil engineering projects.
Internship at ABC Construction: Assisted in the design of a residential building, using AutoCAD for drafting plans.
Site management internship at XYZ Developers: Monitored construction progress and ensured compliance with safety regulations.
Participated in weekly project meetings, contr...
The deflection angle of a transcurve is the angle between the tangent lines at the beginning and end of the curve.
The deflection angle of a transcurve is typically denoted by delta (Δ).
It is the angle formed between the tangent lines at the beginning and end of the curve.
The deflection angle is used in civil engineering for designing curved roads, railways, and other infrastructure.
It helps in determining the curvature...
I appeared for an interview before Feb 2024.
The area of a trapezium can be calculated by taking the average of the two parallel sides and multiplying it by the height.
Find the length of the two parallel sides of the trapezium.
Determine the height of the trapezium, which is the perpendicular distance between the two parallel sides.
Use the formula: Area = (a + b) * h / 2, where a and b are the lengths of the parallel sides and h is the height.
Volume of earthwork in a road can be calculated using cross-sectional area and length of the road.
Calculate the cross-sectional area of the road at regular intervals
Measure the length of the road
Multiply the cross-sectional area by the length to get the volume of earthwork
For example, if the cross-sectional area is 100 square meters and the length of the road is 1 kilometer, the volume of earthwork would be 100 cubic m...
To find the area of an irregular figure, break it down into simpler shapes and calculate their areas separately.
Break down the irregular figure into simpler shapes like rectangles, triangles, circles, etc.
Calculate the area of each simpler shape using the appropriate formula (e.g. area of a rectangle = length x width, area of a triangle = 0.5 x base x height).
Add up the areas of all the simpler shapes to get the total ...
Reinforcement detailing of a column involves specifying the size, spacing, and arrangement of steel bars to ensure structural strength.
Specify the size and grade of reinforcement bars to be used
Determine the spacing between the bars based on structural requirements
Ensure proper cover to protect the reinforcement from corrosion
Provide adequate lap lengths for splicing of bars
Consider any special detailing requirements s...
Reinforcement detailing is crucial for the stability and durability of a retaining wall.
Reinforcement bars should be placed in both horizontal and vertical directions to resist lateral earth pressure.
Proper spacing and cover requirements must be followed as per design specifications.
Additional reinforcement like shear reinforcement or tie bars may be needed at specific locations.
Examples: Using stirrups at regular inte...
Reinforcement detailing of a chajja involves providing steel bars to support the overhanging structure.
Chajja is a projecting eave or sunshade typically found in Indian architecture.
Reinforcement detailing includes providing horizontal and vertical steel bars to support the chajja.
The size and spacing of the steel bars are determined based on the load and span of the chajja.
Proper anchoring of the steel bars into the m...
Cover requirement for extreme condition is essential for structural integrity and safety.
Ensure materials used can withstand extreme temperatures, pressures, or forces.
Consider factors like seismic activity, wind loads, and snow loads in design.
Include redundancy and fail-safe measures to prevent catastrophic failure.
Regular inspections and maintenance to ensure continued performance under extreme conditions.
Weep holes are crucial for drainage in structures; minimum diameter typically ranges from 10mm to 20mm.
Weep holes allow water to escape from behind walls, preventing pressure buildup.
Minimum diameter is often specified as 10mm to ensure effective drainage.
In some cases, a diameter of 20mm may be used for larger structures or higher water flow.
Placement should be at regular intervals, typically every 1 to 2 meters.
Examp...
I applied via LinkedIn and was interviewed before Mar 2023. There was 1 interview round.
I appeared for an interview before Jul 2024, where I was asked the following questions.
The UAE consists of seven emirates, often referred to as provinces, each with its own unique culture and governance.
1. The seven emirates are Abu Dhabi, Dubai, Sharjah, Ajman, Umm Al-Quwain, Fujairah, and Ras Al Khaimah.
2. Abu Dhabi is the capital and the largest emirate by area.
3. Dubai is known for its modern architecture and vibrant economy.
4. Sharjah is recognized for its cultural heritage and museums.
5. Each emira...
I am open to providing additional time beyond my regular schedule to meet organizational needs and support team goals.
Flexibility: I understand that HR roles often require adaptability, especially during peak hiring seasons or employee engagement initiatives.
Commitment: For instance, if a critical recruitment drive is underway, I would be willing to extend my hours to ensure we meet our targets.
Team Support: I believe ...
I applied via Campus Placement and was interviewed in Oct 2022. There were 2 interview rounds.
A beam is a horizontal or inclined structural member that carries loads perpendicular to its longitudinal axis, while a slab is a flat, horizontal structural element that is typically used in floors and roofs.
Beams are used to support vertical loads, while slabs are used to support horizontal loads.
Beams are typically deeper than they are wide, while slabs are typically wider than they are deep.
Beams are often used in ...
SFD and BMD for an overhanging beam
Determine the reactions at the supports
Draw the SFD by taking sections and finding the net force
Draw the BMD by taking sections and finding the net moment
Account for any point loads or moments
Check for equilibrium at each section
Design steps for a column include determining load requirements, selecting materials, calculating dimensions, and creating a detailed drawing.
Determine load requirements based on the intended use of the column
Select appropriate materials based on load requirements and aesthetic preferences
Calculate dimensions of the column based on load requirements and material properties
Create a detailed drawing of the column design,...
I applied via Walk-in and was interviewed before Apr 2023. There were 3 interview rounds.
Culvert Drawing in AutoCAD
Finance professional with 5 years of experience in financial analysis, budgeting, and strategic planning, passionate about driving growth.
Background: I hold a Master's degree in Finance from XYZ University, where I graduated with honors.
Experience: I have worked at ABC Corp for 3 years as a Financial Analyst, where I improved budgeting processes, leading to a 15% cost reduction.
Skills: Proficient in financial modeling ...
Top trending discussions
The duration of S.M. Consultants interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 16 interview experiences
Difficulty level
Duration
based on 157 reviews
Rating in categories
Assistant Engineer
36
salaries
| ₹1.8 L/yr - ₹4.8 L/yr |
Civil Site Engineer
17
salaries
| ₹1.9 L/yr - ₹4.8 L/yr |
Assistant Manager
16
salaries
| ₹2 L/yr - ₹5.2 L/yr |
Construction Management
16
salaries
| ₹4.2 L/yr - ₹8.4 L/yr |
Design Engineer
9
salaries
| ₹8 L/yr - ₹9 L/yr |
Deloitte
Ernst & Young
ZS
Mercer