A work procedure outlines the steps and processes to complete tasks efficiently and safely.
Define the objective: Clearly state the goal of the procedure, e.g., completing a construction phase.
Identify resources: List materials, tools, and personnel needed, such as cranes, concrete, and engineers.
Outline steps: Break down the process into sequential tasks, e.g., site preparation, foundation laying, and inspections.
Assig...
Top trending discussions
I have extensive experience in software development, focusing on scalable solutions and team collaboration.
Led a team of 5 engineers in developing a microservices architecture for a healthcare application, improving scalability by 40%.
Implemented CI/CD pipelines that reduced deployment time from hours to minutes, enhancing team productivity.
Collaborated with cross-functional teams to gather requirements and deliver fea...
I appeared for an interview in Nov 2024, where I was asked the following questions.
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Mivan formwork is a construction technique that uses aluminum formwork system for casting concrete structures.
Mivan formwork involves setting up aluminum formwork panels, fixing reinforcement bars, pouring concrete, and removing the formwork after the concrete has set.
It is a fast and efficient construction method commonly used for high-rise buildings and large residential projects.
The system allows for smooth finishes...
I applied via Walk-in and was interviewed before Nov 2021. There were 2 interview rounds.
Soundness test of cement checks the ability of cement to retain its volume after setting.
Soundness test determines the presence of uncombined lime in cement.
It is done by mixing cement with water and gauging it with a standard consistency.
The mixture is then made into a pat and kept in water for 24 hours.
After 24 hours, the pat is removed and observed for any cracks or distortion.
If the pat remains sound, the cement is...
Zones in beam & column refer to different regions with varying behavior and load distribution.
Zones in a beam include compression zone, tension zone, and neutral axis.
Compression zone experiences compressive stresses, while tension zone experiences tensile stresses.
Neutral axis is the region where there are no stresses.
In a column, zones include the core and the flange.
The core carries most of the axial load, while the...
Mivan formwork sequence involves setting up the wall panels, fixing the corner pieces, placing the slab panels, and then removing the wall panels.
Start by setting up the wall panels in the desired configuration
Fix the corner pieces to ensure proper alignment and stability
Place the slab panels on top of the wall panels
Remove the wall panels once the concrete has set
Repeat the process for the next level
I applied via Walk-in and was interviewed in Apr 2021. There was 1 interview round.
I applied via Walk-in and was interviewed in Jun 2022. There were 3 interview rounds.
posted on 22 Dec 2022
I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.
Mix design is the process of determining the proportions of cement, water, aggregates, and admixtures to produce concrete of desired strength and durability.
Grade of concrete refers to the strength of the concrete mix, which is determined by its compressive strength after 28 days of curing.
Lab testing for concrete includes tests for compressive strength, slump, air content, and density.
Mix design involves selecting the...
The question is related to the process of making level sheets using WMM, WBM, DBM, and BC.
Level sheet making involves the use of different materials such as WMM, WBM, DBM, and BC.
WMM stands for Wet Mix Macadam and is used as a base layer for roads.
WBM stands for Water Bound Macadam and is used as a base layer for flexible pavements.
DBM stands for Dense Bituminous Macadam and is used as a binder course layer for roads.
B...
posted on 2 Oct 2024
I appeared for an interview in May 2024, where I was asked the following questions.
Plaster measurement involves assessing area, thickness, and volume for accurate billing in construction projects.
Measurement is typically done in square meters (m²) for area.
Thickness of plaster is measured in millimeters (mm) or centimeters (cm).
Volume can be calculated by multiplying area by thickness.
For example, a wall of 100 m² with 12 mm thickness requires 1.2 m³ of plaster.
Consider wastage and application method...
I applied via Walk-in
based on 1 interview experience
Difficulty level
Duration
Safety Officer
48
salaries
| ₹3 L/yr - ₹6 L/yr |
Safety Supervisor
25
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Supervisor
22
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Scaffolding Supervisor
17
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Site Supervisor
15
salaries
| ₹2 L/yr - ₹3.6 L/yr |
Lea Associates South Asia
R.V.R. PROJECTS
ABCI Infrastructures
VIKRAN Engineering & Exim