Filter interviews by
I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 3 interview rounds.
Top trending discussions
I applied via Campus Placement and was interviewed in Apr 2023. There were 4 interview rounds.
Questions on outputs of c code, microprocessor, dbms queries
Easy to medium level 5 questions were asked
I applied via Campus Placement
I appeared for an interview before Mar 2024, where I was asked the following questions.
Technical Aptitude test
Data Structures and Algorithms
I appeared for an interview before Feb 2024.
The seven quality control tools are essential for process improvement and problem-solving in engineering.
Check sheet: Used to collect and analyze data in a systematic way, such as tracking defects in a manufacturing process.
Pareto chart: Helps identify the most significant factors contributing to a problem by displaying them in descending order of frequency or impact.
Cause-and-effect diagram (Fishbone diagram): Visuali...
Autonomous maintenance is a key pillar of Total Productive Maintenance (TPM) and involves seven steps to empower operators to take care of their equipment.
Step 1: Initial Cleaning - Operators clean the equipment and surrounding area to identify abnormalities.
Step 2: Eliminate Sources of Contamination - Remove dirt, dust, and debris that can lead to breakdowns.
Step 3: General Inspection - Operators visually inspect the ...
OEE calculations involve Availability, Performance, and Quality factors to measure equipment efficiency.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Possible Production.
Calculate Quality by dividing Good Units Produced by Total Units Started.
Implementing lean practices is mandatory for organizations to improve efficiency, reduce waste, and increase productivity.
Lean practices help organizations identify and eliminate waste in processes, leading to cost savings and improved efficiency.
By implementing lean practices, organizations can improve quality control and reduce defects in products or services.
Lean practices promote continuous improvement and empower ...
Downstream team members can be motivated through recognition, clear communication, opportunities for growth, and fostering a positive work environment.
Provide recognition for their hard work and achievements
Communicate clearly about goals, expectations, and feedback
Offer opportunities for growth and development, such as training or mentorship programs
Create a positive work environment through team-building activities a...
Pareto analysis is a technique used to identify the most important factors contributing to a problem or situation.
Pareto analysis is based on the Pareto Principle, also known as the 80/20 rule, which states that roughly 80% of effects come from 20% of causes.
It involves identifying and prioritizing the factors that have the most significant impact on a particular outcome.
By focusing on addressing the most critical fact...
A Gemba walk is a Lean management technique where managers go to the actual workplace to observe operations and engage with employees.
Gemba walks involve observing processes, asking questions, and identifying opportunities for improvement.
Managers should focus on understanding the work being done and the challenges faced by employees.
Gemba walks help in building relationships with employees and fostering a culture of c...
Steps involved in performing safety risk assessments
Identify hazards and potential risks
Assess the likelihood and severity of each risk
Implement control measures to mitigate risks
Monitor and review the effectiveness of control measures
Document findings and recommendations
Communicate risks to relevant stakeholders
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.
It involves autonomous maintenance, planned maintenance, and focused improvement activities.
TPM aims to improve overall equipment effectiveness (OEE) by reducing downtime, improving quality, and ...
I applied via Approached by Company and was interviewed in Apr 2023. There were 4 interview rounds.
Wire drawing process parameters involve factors like die angle, reduction ratio, lubrication, and speed.
Die angle affects the shape and size of the wire being drawn.
Reduction ratio determines the amount of diameter reduction in each pass.
Lubrication is crucial for reducing friction and heat during the process.
Speed influences the overall efficiency and quality of the drawn wire.
By implementing cost control measures, monitoring expenses, negotiating with suppliers, and optimizing production processes.
Implementing cost control measures such as setting budgets and tracking expenses
Monitoring expenses regularly to identify areas of overspending
Negotiating with suppliers to get the best prices for materials and services
Optimizing production processes to reduce waste and improve efficiency
Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
Water cement ratio is a crucial factor in determining the strength and durability of concrete.
A lower water cement ratio results in stronger and more durable concrete.
Typical water cement ratios range from 0.4 to 0.6 for normal strength concrete.
For high strength concrete, water cement ratios can be as low as 0.25.
I applied via Referral and was interviewed in Jan 2021. There was 1 interview round.
Yes, I have successfully completed my higher secondary exam, which laid the foundation for my engineering studies.
Completed higher secondary education with a focus on science subjects.
Achieved good grades in mathematics and physics, which are crucial for engineering.
Participated in extracurricular activities that enhanced my teamwork and leadership skills.
My birthday is a special day that marks the anniversary of my birth, celebrated with friends and family each year.
Birthdays are often celebrated with parties and gatherings.
Many people enjoy receiving gifts and cards on their birthday.
Traditions vary by culture; for example, some cultures have specific rituals.
Some people choose to celebrate with a special meal or cake.
I passed HSLC in 2015.
I passed HSLC in 2015.
I completed my HSLC in 2015.
I cleared the HSLC examination in 2015.
I have some experience through internships and projects, but I'm eager to learn and grow in this role.
Completed an internship at XYZ Company, where I worked on a team project to design a new product.
Participated in a university engineering competition, which enhanced my problem-solving skills.
Worked on a personal project involving circuit design, which helped me apply theoretical knowledge practically.