Upload Button Icon Add office photos

Filter interviews by

Winch House Production Engineer Interview Questions and Answers

Updated 15 Nov 2021

Winch House Production Engineer Interview Experiences

1 interview found

I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Basic engineering and production related

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for basic engineering and production related questions and solutions

Top trending discussions

View All
Interview Hub
1w (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about Winch House?
Ask anonymously on communities.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Campus Placement and was interviewed in Apr 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Questions on outputs of c code, microprocessor, dbms queries

Round 3 - Coding Test 

Easy to medium level 5 questions were asked

Round 4 - Technical 

(1 Question)

  • Q1. Project discussion, dbms normalisation, 2 3 dsa questions

Production Engineer Interview Questions Asked at Other Companies

Q1. How do you detect faults in robots?
asked in Foxconn
Q2. If product A fails in the last stage, what is the root cause?
Q3. Did you know about soldering and what is the criteria for solderi ... read more
Q4. What is the minimum value that can be measured by a vernier calip ... read more
Q5. What is the difference between mass production and batch producti ... read more
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-

I applied via Campus Placement

Round 1 - Technical 

(2 Questions)

  • Q1. Questions on computer networks
  • Q2. Questions on SQL queries and DSA
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Same Question as Asked in OA
  • Q2. One medium level leetcode problem
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Technical Aptitude test

Round 2 - Coding Test 

Data Structures and Algorithms

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Tell me about yourself

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic to be strong
Be interview-ready. Browse the most asked HR questions.
illustration image
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - Technical 

(10 Questions)

  • Q1. What are the seven quality control tools, and can you provide explanations for each?
  • Ans. 

    The seven quality control tools are essential for process improvement and problem-solving in engineering.

    • Check sheet: Used to collect and analyze data in a systematic way, such as tracking defects in a manufacturing process.

    • Pareto chart: Helps identify the most significant factors contributing to a problem by displaying them in descending order of frequency or impact.

    • Cause-and-effect diagram (Fishbone diagram): Visuali...

  • Answered by AI
  • Q2. 5S and visual management
  • Q3. What are the seven steps of autonomous maintenance?
  • Ans. 

    Autonomous maintenance is a key pillar of Total Productive Maintenance (TPM) and involves seven steps to empower operators to take care of their equipment.

    • Step 1: Initial Cleaning - Operators clean the equipment and surrounding area to identify abnormalities.

    • Step 2: Eliminate Sources of Contamination - Remove dirt, dust, and debris that can lead to breakdowns.

    • Step 3: General Inspection - Operators visually inspect the ...

  • Answered by AI
  • Q4. What are the calculations involved in Overall Equipment Effectiveness (OEE)?
  • Ans. 

    OEE calculations involve Availability, Performance, and Quality factors to measure equipment efficiency.

    • Calculate Availability by dividing Operating Time by Planned Production Time.

    • Calculate Performance by dividing Actual Production by Maximum Possible Production.

    • Calculate Quality by dividing Good Units Produced by Total Units Started.

  • Answered by AI
  • Q5. Why is it mandatory for an organization to implement lean practices?
  • Ans. 

    Implementing lean practices is mandatory for organizations to improve efficiency, reduce waste, and increase productivity.

    • Lean practices help organizations identify and eliminate waste in processes, leading to cost savings and improved efficiency.

    • By implementing lean practices, organizations can improve quality control and reduce defects in products or services.

    • Lean practices promote continuous improvement and empower ...

  • Answered by AI
  • Q6. How can downstream team members be motivated?
  • Ans. 

    Downstream team members can be motivated through recognition, clear communication, opportunities for growth, and fostering a positive work environment.

    • Provide recognition for their hard work and achievements

    • Communicate clearly about goals, expectations, and feedback

    • Offer opportunities for growth and development, such as training or mentorship programs

    • Create a positive work environment through team-building activities a...

  • Answered by AI
  • Q7. What is Pareto analysis and how is it applied in decision-making processes?
  • Ans. 

    Pareto analysis is a technique used to identify the most important factors contributing to a problem or situation.

    • Pareto analysis is based on the Pareto Principle, also known as the 80/20 rule, which states that roughly 80% of effects come from 20% of causes.

    • It involves identifying and prioritizing the factors that have the most significant impact on a particular outcome.

    • By focusing on addressing the most critical fact...

  • Answered by AI
  • Q8. What is a Gemba walk, and how is it performed?
  • Ans. 

    A Gemba walk is a Lean management technique where managers go to the actual workplace to observe operations and engage with employees.

    • Gemba walks involve observing processes, asking questions, and identifying opportunities for improvement.

    • Managers should focus on understanding the work being done and the challenges faced by employees.

    • Gemba walks help in building relationships with employees and fostering a culture of c...

  • Answered by AI
  • Q9. What are the steps involved in performing safety risk assessments?
  • Ans. 

    Steps involved in performing safety risk assessments

    • Identify hazards and potential risks

    • Assess the likelihood and severity of each risk

    • Implement control measures to mitigate risks

    • Monitor and review the effectiveness of control measures

    • Document findings and recommendations

    • Communicate risks to relevant stakeholders

  • Answered by AI
  • Q10. Explain about TPM
  • Ans. 

    TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.

    • TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.

    • It involves autonomous maintenance, planned maintenance, and focused improvement activities.

    • TPM aims to improve overall equipment effectiveness (OEE) by reducing downtime, improving quality, and ...

  • Answered by AI
Are these interview questions helpful?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Apr 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. TELL ME ABOUT YOURSELF & HOW YOU WILL BE AN ASSET FOR OUR ORGANIZATION
Round 3 - Technical 

(1 Question)

  • Q1. EXPLAIN WIRE DRAWING PROCESS PARAMETERS
  • Ans. 

    Wire drawing process parameters involve factors like die angle, reduction ratio, lubrication, and speed.

    • Die angle affects the shape and size of the wire being drawn.

    • Reduction ratio determines the amount of diameter reduction in each pass.

    • Lubrication is crucial for reducing friction and heat during the process.

    • Speed influences the overall efficiency and quality of the drawn wire.

  • Answered by AI
Round 4 - One-on-one 

(2 Questions)

  • Q1. HOW YOU WILL CONTROL COST
  • Ans. 

    By implementing cost control measures, monitoring expenses, negotiating with suppliers, and optimizing production processes.

    • Implementing cost control measures such as setting budgets and tracking expenses

    • Monitoring expenses regularly to identify areas of overspending

    • Negotiating with suppliers to get the best prices for materials and services

    • Optimizing production processes to reduce waste and improve efficiency

  • Answered by AI
  • Q2. WHERE YOU SEE YOURSELF AFTER 5 YEARS.

Interview Preparation Tips

Topics to prepare for Patil Group Production Manager interview:
  • 5s
  • TPM
  • Pareto Analysis
Interview preparation tips for other job seekers - Be honest during the interviews. It will gives you a next level of confidence.
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. A Water cement ratio
  • Ans. 

    Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.

    • Water cement ratio is a crucial factor in determining the strength and durability of concrete.

    • A lower water cement ratio results in stronger and more durable concrete.

    • Typical water cement ratios range from 0.4 to 0.6 for normal strength concrete.

    • For high strength concrete, water cement ratios can be as low as 0.25.

  • Answered by AI
  • Q2. Soil test compaction

I applied via Referral and was interviewed in Jan 2021. There was 1 interview round.

Interview Questionnaire 

9 Questions

  • Q1. When I services
  • Q2. Are you pass higher secondary exam?
  • Ans. 

    Yes, I have successfully completed my higher secondary exam, which laid the foundation for my engineering studies.

    • Completed higher secondary education with a focus on science subjects.

    • Achieved good grades in mathematics and physics, which are crucial for engineering.

    • Participated in extracurricular activities that enhanced my teamwork and leadership skills.

  • Answered by AI
  • Q3. What is your birthday
  • Ans. 

    My birthday is a special day that marks the anniversary of my birth, celebrated with friends and family each year.

    • Birthdays are often celebrated with parties and gatherings.

    • Many people enjoy receiving gifts and cards on their birthday.

    • Traditions vary by culture; for example, some cultures have specific rituals.

    • Some people choose to celebrate with a special meal or cake.

  • Answered by AI
  • Q4. When are you pass civil engineering diploma
  • Q5. When are you pass higher secondary
  • Ans. 1991
  • Answered by Sanjib Bordoloi
  • Q6. When are you pass HSLC
  • Ans. 

    I passed HSLC in 2015.

    • I passed HSLC in 2015.

    • I completed my HSLC in 2015.

    • I cleared the HSLC examination in 2015.

  • Answered by AI
  • Q7. Are you experiencing
  • Ans. 

    I have some experience through internships and projects, but I'm eager to learn and grow in this role.

    • Completed an internship at XYZ Company, where I worked on a team project to design a new product.

    • Participated in a university engineering competition, which enhanced my problem-solving skills.

    • Worked on a personal project involving circuit design, which helped me apply theoretical knowledge practically.

  • Answered by AI
  • Q8. Please Adress?
  • Ans. Vill: Bagariguri , PO: Jajori , DIST.: Nagaon, pin: 782142
  • Answered by Sanjib Bordoloi
  • Q9. Your father name?
  • Ans. Late Hem Chandra Bordoloi
  • Answered by Sanjib Bordoloi

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes, share my job, I have passed civil engineering diploma in 1996 year

Tell us how to improve this page.

Interview Questions from Trending Companies on AmbitionBox

Cognizant Interview Questions
3.7
 • 6k Interviews
Capgemini Interview Questions
3.7
 • 5.1k Interviews
IndusInd Bank Interview Questions
3.4
 • 700 Interviews
Hindustan Unilever Interview Questions
4.2
 • 414 Interviews
Tata 1mg Interview Questions
3.6
 • 192 Interviews
Tata Electronics Interview Questions
4.0
 • 195 Interviews
ZS Interview Questions
3.2
 • 481 Interviews
Foxconn Interview Questions
3.8
 • 193 Interviews
Uber Interview Questions
4.2
 • 157 Interviews
Genpact Interview Questions
3.7
 • 3.5k Interviews
View all
write
Share an Interview