Filter interviews by
Veving problem refers to a common issue in weaving processes where the fabric pattern is not aligned properly.
Veving problem can occur due to incorrect warp or weft tension.
It can also be caused by misalignment of the weaving machine.
Examples include misaligned stripes or patterns in the fabric.
Six Sigma is a data-driven methodology used to improve processes by reducing defects and variations.
Six Sigma aims to achieve near perfection in processes by identifying and eliminating causes of defects or errors.
It involves statistical analysis, process mapping, and continuous improvement techniques.
Six Sigma uses a set of quality management methods, including DMAIC (Define, Measure, Analyze, Improve, Control) a...
OEE (Overall Equipment Effectiveness) is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying Availability, Performance, and Quality percentages.
Availability measures the percentage of time the equipment is running during planned production time.
Performance measures the speed at which the equipment is running compared to its maximum speed.
Quality measures the percentage of g...
Kaizen is a Japanese term meaning continuous improvement. It involves making small, incremental changes to processes in order to improve efficiency and quality.
Kaizen focuses on involving all employees in the improvement process
It emphasizes making small, gradual changes rather than large, disruptive ones
Kaizen is a key principle of lean manufacturing and Six Sigma methodologies
Examples of kaizen include implement...
Wrinkle problem refers to the occurrence of wrinkles or creases in a material, often caused by improper processing or handling.
Wrinkle problems can occur in various materials such as plastics, fabrics, or paper during manufacturing processes.
Common causes of wrinkle problems include improper tension control, inadequate drying or curing time, or incorrect temperature settings.
Examples of wrinkle problems include cr...
Man power handling refers to the management and coordination of human resources within a process or organization.
Man power handling involves assigning tasks, monitoring progress, and ensuring efficiency in the use of human resources.
It includes managing work schedules, resolving conflicts, and providing training and support to employees.
Examples of man power handling in a process engineering role could include coo...
5s and TPM are methodologies used in manufacturing to improve efficiency and productivity.
5s stands for Sort, Set in order, Shine, Standardize, Sustain. It is a method for organizing the workplace to improve efficiency and safety.
TPM stands for Total Productive Maintenance. It is a method for maximizing the effectiveness of equipment by involving all employees in the maintenance process.
Both 5s and TPM are commonl...
I applied via Naukri.com and was interviewed in Aug 2023. There were 3 interview rounds.
Kaizen is a Japanese term meaning continuous improvement. It involves making small, incremental changes to processes in order to improve efficiency and quality.
Kaizen focuses on involving all employees in the improvement process
It emphasizes making small, gradual changes rather than large, disruptive ones
Kaizen is a key principle of lean manufacturing and Six Sigma methodologies
Examples of kaizen include implementing 5...
5s and TPM are methodologies used in manufacturing to improve efficiency and productivity.
5s stands for Sort, Set in order, Shine, Standardize, Sustain. It is a method for organizing the workplace to improve efficiency and safety.
TPM stands for Total Productive Maintenance. It is a method for maximizing the effectiveness of equipment by involving all employees in the maintenance process.
Both 5s and TPM are commonly use...
OEE (Overall Equipment Effectiveness) is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying Availability, Performance, and Quality percentages.
Availability measures the percentage of time the equipment is running during planned production time.
Performance measures the speed at which the equipment is running compared to its maximum speed.
Quality measures the percentage of good p...
4m and 3m are abbreviations for different types of process analysis tools used in manufacturing.
4m stands for Man, Machine, Material, and Method - used to analyze potential causes of a problem in manufacturing processes.
3m stands for Man, Machine, and Method - used to analyze the efficiency of a manufacturing process.
These tools help identify areas for improvement and optimization in manufacturing processes.
Six Sigma is a data-driven methodology used to improve processes by reducing defects and variations.
Six Sigma aims to achieve near perfection in processes by identifying and eliminating causes of defects or errors.
It involves statistical analysis, process mapping, and continuous improvement techniques.
Six Sigma uses a set of quality management methods, including DMAIC (Define, Measure, Analyze, Improve, Control) and DM...
Man power handling refers to the management and coordination of human resources within a process or organization.
Man power handling involves assigning tasks, monitoring progress, and ensuring efficiency in the use of human resources.
It includes managing work schedules, resolving conflicts, and providing training and support to employees.
Examples of man power handling in a process engineering role could include coordina...
Veving problem refers to a common issue in weaving processes where the fabric pattern is not aligned properly.
Veving problem can occur due to incorrect warp or weft tension.
It can also be caused by misalignment of the weaving machine.
Examples include misaligned stripes or patterns in the fabric.
Wrinkle problem refers to the occurrence of wrinkles or creases in a material, often caused by improper processing or handling.
Wrinkle problems can occur in various materials such as plastics, fabrics, or paper during manufacturing processes.
Common causes of wrinkle problems include improper tension control, inadequate drying or curing time, or incorrect temperature settings.
Examples of wrinkle problems include creases...
Top trending discussions
posted on 23 Apr 2020
I applied via Naukri.com and was interviewed in Oct 2019. There were 4 interview rounds.
posted on 8 Dec 2021
I applied via Naukri.com and was interviewed before Dec 2020. There were 4 interview rounds.
I applied via Approached by company and was interviewed before Jan 2021. There was 1 interview round.
Distillation column design is the process of designing a column to separate components of a mixture based on their boiling points.
The design involves determining the number of trays or packing required for efficient separation
The column diameter and height are also important factors to consider
The feed location and reflux ratio must be optimized for maximum separation efficiency
Computer simulations and modeling can aid...
I applied via Campus Placement and was interviewed before Oct 2020. There were 5 interview rounds.
I applied via LinkedIn and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There were 2 interview rounds.
It was a 45 mins of discussion with hr & plant head ,was discussed about the project commissioning activities and was asked about the expectations
posted on 22 May 2022
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
HE refers to Heat Exchangers and pumps are used to move fluids. Types of HE include shell and tube, plate and frame, and spiral. Types of pumps include centrifugal, positive displacement, and axial flow.
Heat Exchangers: shell and tube, plate and frame, spiral
Pumps: centrifugal, positive displacement, axial flow
Different types of pumps and heat exchangers are used in process engineering.
Types of pumps include centrifugal, positive displacement, and axial flow pumps.
Heat exchangers can be classified as shell and tube, plate and frame, or air-cooled.
Pumps are used to transfer fluids in a process while heat exchangers are used to transfer heat between fluids.
Selection of pumps and heat exchangers depends on the process requireme...
I applied via Walk-in and was interviewed before Aug 2021. There were 3 interview rounds.
General test on engineering
Nominal group discussion
I applied via Campus Placement and was interviewed before Jun 2020. There was 1 interview round.
based on 1 interview experience
Difficulty level
Duration
based on 14 reviews
Rating in categories
Assistant Engineer
225
salaries
| ₹1.5 L/yr - ₹3.5 L/yr |
Process Engineer
60
salaries
| ₹2.7 L/yr - ₹7.2 L/yr |
Senior Executive
46
salaries
| ₹4.4 L/yr - ₹10 L/yr |
Production Engineer
44
salaries
| ₹2 L/yr - ₹6 L/yr |
Engineer
36
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Monte Carlo
Safari Industries India
Van Heusen
Uniqlo