I have used Primavera P6 for project management in construction projects.
Primavera P6 is a widely used project management tool in the construction industry.
It helps in planning, scheduling, and controlling construction projects.
It allows for resource management, cost tracking, and progress monitoring.
With Primavera P6, I have successfully managed multiple construction projects, ensuring timely completion and adher...
I possess strong analytical skills, effective communication, and proficiency in programming languages like Python and C++.
Analytical Skills: I excel in problem-solving, demonstrated by my project on optimizing algorithms for data processing.
Communication: I effectively convey technical concepts, as shown during my internship where I presented findings to non-technical stakeholders.
Programming Proficiency: I am ski...
Transmission line survey involves assessing the route and terrain for the installation of power transmission lines.
Conduct a preliminary survey to identify potential routes and assess environmental impact
Perform a detailed survey to determine the exact location of the transmission line and any necessary adjustments
Consider factors such as terrain, vegetation, and existing infrastructure
Ensure compliance with local...
Transformer types include step-up, step-down, isolation, autotransformer, and instrument transformer.
Step-up transformers increase voltage while decreasing current
Step-down transformers decrease voltage while increasing current
Isolation transformers provide electrical isolation between circuits
Autotransformers have a single winding that acts as both primary and secondary
Instrument transformers are used to measure ...
Electrical distribution design involves planning and implementing systems for the safe and efficient distribution of electricity.
Designing electrical distribution systems for buildings and facilities
Calculating load requirements and selecting appropriate equipment
Ensuring compliance with safety codes and regulations
Collaborating with engineers, architects, and contractors
Troubleshooting and resolving issues with e...
I applied via Recruitment Consulltant and was interviewed before Jan 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Feb 2022. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Dec 2021. There were 3 interview rounds.
I possess strong analytical skills, effective communication, and proficiency in programming languages like Python and C++.
Analytical Skills: I excel in problem-solving, demonstrated by my project on optimizing algorithms for data processing.
Communication: I effectively convey technical concepts, as shown during my internship where I presented findings to non-technical stakeholders.
Programming Proficiency: I am skilled ...
Transmission line survey involves assessing the route and terrain for the installation of power transmission lines.
Conduct a preliminary survey to identify potential routes and assess environmental impact
Perform a detailed survey to determine the exact location of the transmission line and any necessary adjustments
Consider factors such as terrain, vegetation, and existing infrastructure
Ensure compliance with local regu...
I applied via Naukri.com and was interviewed before Oct 2020. There were 4 interview rounds.
Electrical distribution design involves planning and implementing systems for the safe and efficient distribution of electricity.
Designing electrical distribution systems for buildings and facilities
Calculating load requirements and selecting appropriate equipment
Ensuring compliance with safety codes and regulations
Collaborating with engineers, architects, and contractors
Troubleshooting and resolving issues with electr...
Transformer types include step-up, step-down, isolation, autotransformer, and instrument transformer.
Step-up transformers increase voltage while decreasing current
Step-down transformers decrease voltage while increasing current
Isolation transformers provide electrical isolation between circuits
Autotransformers have a single winding that acts as both primary and secondary
Instrument transformers are used to measure volta...
Top trending discussions
posted on 12 Jul 2016
I applied via Campus Placement
The question is about finding the minimum steps to reach from a source string to a destination string using three operations.
BFS and DFS are graph traversal techniques that can be used to solve this problem.
BFS is typically used when finding the shortest path or exploring all possible paths in a graph.
DFS is useful when searching for a specific path or exploring deeply into a graph.
In this case, BFS can be used to find...
posted on 14 Jul 2017
I appeared for an interview before Jul 2024, where I was asked the following questions.
Inventory types include raw materials, work-in-progress, finished goods, and maintenance, repair, and operations supplies.
Raw Materials: Basic materials used in production, e.g., steel for manufacturing cars.
Work-in-Progress (WIP): Items that are in the production process, e.g., partially assembled electronics.
Finished Goods: Completed products ready for sale, e.g., packaged food items.
Maintenance, Repair, and Operatio...
Replenishing data involves proactive strategies to ensure timely updates and prevent delays in model clearance.
Implement automated data pipelines to ensure real-time data updates, reducing manual intervention.
Schedule regular data audits to identify gaps or outdated information, ensuring the model uses the most relevant data.
Utilize version control for datasets to track changes and quickly revert to previous versions i...
Implementing proactive strategies can effectively reduce line shortages caused by material shortages and losses.
Conduct regular inventory audits to identify potential shortages early.
Establish strong relationships with multiple suppliers to ensure material availability.
Implement a just-in-time (JIT) inventory system to minimize excess and reduce waste.
Utilize technology for real-time tracking of materials to prevent lo...
posted on 6 Oct 2023
I applied via Campus Placement and was interviewed in Apr 2023. There were 2 interview rounds.
Level was medium to hard
To print a tree in anticlockwise direction, start from the bottom left and traverse each level from right to left.
Start from the bottom left of the tree
Traverse each level from right to left
Print the nodes as you traverse
based on 4 interview experiences
Difficulty level
Duration
based on 26 reviews
Rating in categories
Project Engineer
5
salaries
| ₹3 L/yr - ₹4.7 L/yr |
Electrical Engineer
4
salaries
| ₹1.9 L/yr - ₹4.9 L/yr |
Cost Accountant
4
salaries
| ₹15 L/yr - ₹54.6 L/yr |
Business Development Manager
4
salaries
| ₹4 L/yr - ₹17.6 L/yr |
Site Engineer
4
salaries
| ₹2.2 L/yr - ₹4.4 L/yr |
Bhagwati Products
Lloyd Electric & Engineering
Mehta Infocom
National Instruments