An erection schedule outlines the sequence and timing of lifting operations to ensure safety and efficiency during construction.
Assess site conditions: Evaluate ground stability and weather forecasts to determine lifting feasibility.
Sequence of lifts: Plan the order of lifting operations to avoid conflicts and ensure structural integrity.
Equipment availability: Ensure cranes and other lifting equipment are schedul...
Addressing site-related issues requires systematic problem-solving and effective communication with the team.
Identify the specific issue: For example, if there are delays in material delivery, assess the supply chain.
Communicate with the team: Hold a meeting to discuss the problem and gather input from all stakeholders.
Develop a solution: If equipment is malfunctioning, consider renting or borrowing similar equipm...
Safety rules at construction sites ensure worker protection and compliance with regulations to prevent accidents and injuries.
Conduct regular safety training sessions for all workers to ensure they understand safety protocols.
Use personal protective equipment (PPE) such as helmets, gloves, and safety goggles at all times.
Implement a strict fall protection plan when working at heights, including guardrails and harn...
Daily Tool Box Talks (TBT) ensure safety and efficiency before starting work at construction sites.
Discuss specific hazards related to the day's tasks, such as working at heights or handling heavy materials.
Review safety protocols and personal protective equipment (PPE) required for the day's activities.
Encourage team members to share any concerns or past experiences related to the tasks ahead.
Provide updates on s...
Daily updates to the plan ensure project alignment, resource optimization, and timely completion of erection and fabrication tasks.
Review daily progress against the project timeline to identify any delays or issues.
Communicate with team members to gather updates on their tasks and any challenges faced.
Adjust resource allocation based on current needs, such as increasing manpower for critical tasks.
Utilize project ...
Quality work in erection and fabrication ensures safety, durability, and compliance with industry standards.
Adhere to established quality standards like ISO 9001 to ensure consistency.
Conduct regular inspections during the fabrication process to identify defects early.
Implement a quality control checklist for each project phase, ensuring all criteria are met.
Use certified materials and components to guarantee reli...
Daily Progress Report (DPR) tracks site activities, ensuring transparency and accountability in engineering projects.
Document daily activities: Record all tasks completed, such as erection of structural steel or installation of equipment.
Note manpower and equipment: Include the number of workers on-site and machinery used, e.g., cranes or forklifts.
Highlight safety measures: Report any safety incidents or inspecti...
The grade of steel refers to its composition and properties, which determine its suitability for different applications.
Different grades of steel have varying levels of strength, ductility, and corrosion resistance.
Common grades of steel include A36, A572, and A588.
A36 steel is a low carbon steel with good strength and ductility, but poor corrosion resistance.
A572 steel is a high strength, low alloy steel with goo...
I appeared for an interview before May 2024, where I was asked the following questions.
An erection schedule outlines the sequence and timing of lifting operations to ensure safety and efficiency during construction.
Assess site conditions: Evaluate ground stability and weather forecasts to determine lifting feasibility.
Sequence of lifts: Plan the order of lifting operations to avoid conflicts and ensure structural integrity.
Equipment availability: Ensure cranes and other lifting equipment are scheduled an...
Daily updates to the plan ensure project alignment, resource optimization, and timely completion of erection and fabrication tasks.
Review daily progress against the project timeline to identify any delays or issues.
Communicate with team members to gather updates on their tasks and any challenges faced.
Adjust resource allocation based on current needs, such as increasing manpower for critical tasks.
Utilize project manag...
Addressing site-related issues requires systematic problem-solving and effective communication with the team.
Identify the specific issue: For example, if there are delays in material delivery, assess the supply chain.
Communicate with the team: Hold a meeting to discuss the problem and gather input from all stakeholders.
Develop a solution: If equipment is malfunctioning, consider renting or borrowing similar equipment t...
Daily Tool Box Talks (TBT) ensure safety and efficiency before starting work at construction sites.
Discuss specific hazards related to the day's tasks, such as working at heights or handling heavy materials.
Review safety protocols and personal protective equipment (PPE) required for the day's activities.
Encourage team members to share any concerns or past experiences related to the tasks ahead.
Provide updates on site c...
Safety rules at construction sites ensure worker protection and compliance with regulations to prevent accidents and injuries.
Conduct regular safety training sessions for all workers to ensure they understand safety protocols.
Use personal protective equipment (PPE) such as helmets, gloves, and safety goggles at all times.
Implement a strict fall protection plan when working at heights, including guardrails and harnesses...
Quality work in erection and fabrication ensures safety, durability, and compliance with industry standards.
Adhere to established quality standards like ISO 9001 to ensure consistency.
Conduct regular inspections during the fabrication process to identify defects early.
Implement a quality control checklist for each project phase, ensuring all criteria are met.
Use certified materials and components to guarantee reliabili...
Daily Progress Report (DPR) tracks site activities, ensuring transparency and accountability in engineering projects.
Document daily activities: Record all tasks completed, such as erection of structural steel or installation of equipment.
Note manpower and equipment: Include the number of workers on-site and machinery used, e.g., cranes or forklifts.
Highlight safety measures: Report any safety incidents or inspections c...
I applied via Recruitment Consultant and was interviewed in Sep 2020. There were 3 interview rounds.
The grade of steel refers to its composition and properties, which determine its suitability for different applications.
Different grades of steel have varying levels of strength, ductility, and corrosion resistance.
Common grades of steel include A36, A572, and A588.
A36 steel is a low carbon steel with good strength and ductility, but poor corrosion resistance.
A572 steel is a high strength, low alloy steel with good wel...
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Nov 2019. There were 3 interview rounds.
posted on 9 Oct 2021
I applied via Company Website and was interviewed before Oct 2020. There were 3 interview rounds.
posted on 4 May 2019
I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 4 Jan 2021
I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Jan 2021. There were 5 interview rounds.
Glass is a solid, transparent material made by heating a mixture of silica and other materials.
Glass is a non-crystalline, amorphous solid
It is made by heating a mixture of silica, soda ash, and lime
It can be molded into various shapes and sizes
It is used in windows, mirrors, lenses, and containers
Different types of glass include tempered, laminated, and stained glass
Graphene is a thin layer of pure carbon arranged in a hexagonal lattice.
It is the thinnest material known to man
It is a good conductor of electricity and heat
It is incredibly strong and flexible
It has potential applications in electronics, energy, and medicine
Glass is a solid, transparent material made by heating a mixture of silica and other materials.
Glass is an amorphous solid, meaning it has no long-range order in its atomic structure.
It is commonly used in windows, mirrors, lenses, and containers.
Glass can be colored or made into different shapes by adding various chemicals or using different manufacturing techniques.
It can also be tempered or laminated for increased s...
Glass is a solid, transparent material made by heating a mixture of silica and other materials.
Glass is a non-crystalline, amorphous solid
It is made by heating a mixture of silica, soda ash, and lime
It can be molded into various shapes and sizes
It is used in windows, mirrors, lenses, and containers
Different types of glass include tempered, laminated, and stained glass
I applied via Approached by Company and was interviewed in Mar 2021. There were 3 interview rounds.
posted on 5 Oct 2021
based on 1 interview experience
Difficulty level
Duration
based on 4 reviews
Rating in categories
Senior Engineer
416
salaries
| ₹7.4 L/yr - ₹13.1 L/yr |
Assistant Manager
214
salaries
| ₹9 L/yr - ₹14.3 L/yr |
Planning Engineer
194
salaries
| ₹4.9 L/yr - ₹10 L/yr |
Civil Engineer
193
salaries
| ₹3.5 L/yr - ₹8.4 L/yr |
Executive Engineer
178
salaries
| ₹4.7 L/yr - ₹10.1 L/yr |
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company