Upload Button Icon Add office photos

Filter interviews by

Nagarjuna Construction Company Senior Engineer Interview Questions and Answers

Updated 29 Jun 2025

8 Interview questions

A Senior Engineer was asked 1mo ago
Q. What is the shuttering scheme in construction?
Ans. 

Shuttering scheme refers to the temporary structure used to support concrete during curing until it gains strength.

  • Shuttering is essential for shaping and supporting concrete structures like beams, slabs, and columns.

  • Common materials for shuttering include plywood, steel, and aluminum.

  • The design of the shuttering scheme must consider load-bearing capacity and safety.

  • Examples include traditional timber formwork and...

A Senior Engineer was asked 1mo ago
Q. What is the role of BBS (Bar Bending Schedule) in the context of Reinforced Cement Concrete (RCC) construction?
Ans. 

BBS is crucial for detailing and quantifying reinforcement in RCC, ensuring structural integrity and cost efficiency.

  • BBS provides a detailed list of all reinforcement bars required for a project, including their lengths and diameters.

  • It helps in accurate estimation of material quantities, reducing wastage and optimizing costs.

  • BBS aids in the scheduling of work, ensuring timely procurement and placement of reinforc...

Senior Engineer Interview Questions Asked at Other Companies

Q1. What does the 'M' signify in M20, M25, and M30 grades of concrete ... read more
asked in Nagarro
Q2. Write a program that takes an integer N and an array of integers ... read more
asked in Tata Elxsi
Q3. What is Quality Assurance. Difference between Quality assurance a ... read more
Q4. Is it possible to work with multiple threads in core data? If so, ... read more
Q5. When would you perform a half or full engine overhaul?
A Senior Engineer was asked 1mo ago
Q. What are the different types of project execution methodologies?
Ans. 

Project execution methodologies guide how projects are planned, executed, and delivered, ensuring efficiency and effectiveness.

  • Waterfall: A linear approach where each phase must be completed before the next begins. Example: Construction projects.

  • Agile: An iterative approach that allows for flexibility and customer feedback. Example: Software development.

  • Scrum: A subset of Agile focusing on short sprints and regula...

A Senior Engineer was asked
Q. How much quantity can 200 machines produce in an hour?
Ans. 

The quantity done by 200 machines in an hour depends on the efficiency and capacity of each machine.

  • The quantity done will depend on the output capacity of each machine

  • Factors such as machine speed, efficiency, and type of work being done will also impact the quantity produced

  • For example, if each machine can produce 10 units per hour, then 200 machines will produce 2000 units in an hour

What people are saying about Nagarjuna Construction Company

View All
a deputy project manager
1w
Stuck at Cross roads : Loyalty vs Financial relief
Hi All, Right now I was working in a Good construction company with Medium range salary with good working culture and supporting seniors and colleagues who supported me in tough situations, but my financial situation is too worse I am in a position that I am unable manage my monthly expenses and Loans, literally lost all my respect among family members. Now I got an offer from India's top construction company with approx salary hike of 35%. Someone already informed to management that I am planning to leave even before I got my offer.Now they keep on asking me to stay back and whatever be the financial situation they will sort out. I am unable to take decision that I have to accept the offer and move or stay with my current organisation. Please suggest
Got a question about Nagarjuna Construction Company?
Ask anonymously on communities.
A Senior Engineer was asked
Q. What is considered a lead?
Ans. 

A lead is a potential customer or client who has shown interest in a product or service.

  • A lead is typically generated through marketing efforts such as advertising or networking.

  • Leads can be obtained through various channels such as social media, email campaigns, or trade shows.

  • Once a lead is identified, they are usually passed on to the sales team for further follow-up and conversion.

  • Qualifying leads involves det...

What are the roles & responsibilities of a Senior Engineer at Nagarjuna Construction Company?

Project Management

  • Execute projects according to planning and drawings
  • Daily reporting to the Project Head Engineer
  • Manage all construction-related activities

Read full roles & responsibilities

A Senior Engineer was asked
Q. What are the different types of formwork?
Ans. 

Formwork is a temporary structure used to support and shape concrete during construction.

  • Timber formwork: made of wood and commonly used for small to medium-sized projects.

  • Steel formwork: made of steel plates and used for large-scale projects.

  • Aluminum formwork: lightweight and easy to handle, suitable for repetitive use.

  • Plastic formwork: made of plastic panels or sheets, used for simple structures and low-cost pro...

Nagarjuna Construction Company HR Interview Questions

62 questions and answers

Q. How do you manage pressure and adapt to last-minute changes?
Q. Where do you envision yourself in the next 3 to 5 years?
Q. What qualifications and experiences make you a suitable candidate for the p ... read more
🔥 Asked by recruiter 2 times
A Senior Engineer was asked
Q. What is the density of cement?
Ans. 

The density of cement varies depending on the type of cement and its composition.

  • The density of ordinary Portland cement is around 3.15 g/cm³

  • The density of white cement is around 2.90 g/cm³

  • The density of low heat cement is around 3.0 g/cm³

  • The density of high alumina cement is around 3.0 g/cm³

  • The density of rapid hardening cement is around 3.15 g/cm³

Are these interview questions helpful?
A Senior Engineer was asked
Q. How many dumpers needed for 15 km how many excavators required
Ans. 

The number of dumpers and excavators needed for a 15 km project depends on various factors such as the type of material being transported and the size of the excavation area.

  • The number of dumpers needed for a 15 km project will depend on the volume and weight of material to be transported, as well as the capacity of each dumper.

  • The number of excavators required will depend on the size of the excavation area, the t...

Nagarjuna Construction Company Senior Engineer Interview Experiences

16 interviews found

Senior Engineer Interview Questions & Answers

user image Sandeep Kumar

posted on 19 Dec 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Last company information Family background
  • Ans. 

    I worked at XYZ Company as a Senior Engineer. My family background includes a mix of professionals and entrepreneurs.

    • Worked at XYZ Company as a Senior Engineer

    • Family background includes professionals and entrepreneurs

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Codes Excel Autocad Drawing reading

Senior Engineer Interview Questions & Answers

user image Vidyanand Yadav

posted on 29 Jun 2025

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Dec 2024, where I was asked the following questions.

  • Q1. What is the shuttering scheme in construction?
  • Ans. 

    Shuttering scheme refers to the temporary structure used to support concrete during curing until it gains strength.

    • Shuttering is essential for shaping and supporting concrete structures like beams, slabs, and columns.

    • Common materials for shuttering include plywood, steel, and aluminum.

    • The design of the shuttering scheme must consider load-bearing capacity and safety.

    • Examples include traditional timber formwork and mode...

  • Answered by AI
  • Q2. What is the role of BBS (Bar Bending Schedule) in the context of Reinforced Cement Concrete (RCC) construction?
  • Ans. 

    BBS is crucial for detailing and quantifying reinforcement in RCC, ensuring structural integrity and cost efficiency.

    • BBS provides a detailed list of all reinforcement bars required for a project, including their lengths and diameters.

    • It helps in accurate estimation of material quantities, reducing wastage and optimizing costs.

    • BBS aids in the scheduling of work, ensuring timely procurement and placement of reinforcement...

  • Answered by AI
  • Q3. Can you provide details about your previous company and the projects you worked on there?
  • Q4. What are the different types of project execution methodologies?
  • Ans. 

    Project execution methodologies guide how projects are planned, executed, and delivered, ensuring efficiency and effectiveness.

    • Waterfall: A linear approach where each phase must be completed before the next begins. Example: Construction projects.

    • Agile: An iterative approach that allows for flexibility and customer feedback. Example: Software development.

    • Scrum: A subset of Agile focusing on short sprints and regular upd...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Arange Interview
Round 2 - Technical 

(2 Questions)

  • Q1. Tell your self your current company
  • Ans. 

    I currently work at Tech Innovations Inc., where we develop cutting-edge software solutions for various industries.

    • I lead a team of engineers in developing scalable web applications, improving user experience by 30%.

    • Implemented Agile methodologies, resulting in a 25% increase in project delivery speed.

    • Collaborated with cross-functional teams to integrate AI features into our products, enhancing functionality.

    • Mentored j...

  • Answered by AI
  • Q2. Asking all questions about your current job role
Round 3 - HR 

(2 Questions)

  • Q1. Salary negotiation
  • Q2. Offer letter & joining

Interview Preparation Tips

Interview preparation tips for other job seekers - Know about your current job role .

Senior Engineer Interview Questions & Answers

user image Vishal Gupta

posted on 3 Mar 2024

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Assignment 

Project Details Work Assignment

Round 2 - Technical 

(1 Question)

  • Q1. Conductor Capacity Rating

Senior Engineer Interview Questions & Answers

user image Santosh Kumar Pandey

posted on 4 Mar 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. HR ask for Introduction
  • Q2. Technical person ask abouts your work profile related experience.
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Regarding work Experience
  • Q2. Electrical Distribution network execution
Round 3 - HR 

(1 Question)

  • Q1. Current & expected CTC.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Salary, family and experience background
Round 3 - Technical 

(3 Questions)

  • Q1. Work experience and what's your responsibility at there and about questions
  • Q2. About Steel structure
  • Q3. About DPR ,DLR AND RECONCILIATION
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. About your previous work related
  • Q2. Introduction about yourself

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company u can try to join

Senior Engineer Interview Questions & Answers

user image Mohd Imran Gazi

posted on 20 Jun 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Work related as per your experience
  • Q2. Personal family background etc
Round 2 - HR 

(1 Question)

  • Q1. Salary location etc

Interview Preparation Tips

Interview preparation tips for other job seekers - If you done your work sincerely, then u can ans all those questions
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. Questions raising on earth work and structures
  • Q2. How many dumpers needed for 15 km how many excavators required
  • Ans. 

    The number of dumpers and excavators needed for a 15 km project depends on various factors such as the type of material being transported and the size of the excavation area.

    • The number of dumpers needed for a 15 km project will depend on the volume and weight of material to be transported, as well as the capacity of each dumper.

    • The number of excavators required will depend on the size of the excavation area, the type o...

  • Answered by AI
  • Q3. What is called a lead
  • Q4. How much quantity will done 200 machine in hour
  • Q5. Questioned agin lining works
Round 3 - HR 

(1 Question)

  • Q1. Asking about changing of company and next about my native place

Interview Preparation Tips

Interview preparation tips for other job seekers - Study wll and other wise you can fail

Nagarjuna Construction Company Interview FAQs

How many rounds are there in Nagarjuna Construction Company Senior Engineer interview?
Nagarjuna Construction Company interview process usually has 2-3 rounds. The most common rounds in the Nagarjuna Construction Company interview process are Technical, HR and Resume Shortlist.
How to prepare for Nagarjuna Construction Company Senior Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Nagarjuna Construction Company. The most common topics and skills that interviewers at Nagarjuna Construction Company expect are Civil Construction, Civil Engineering, High Rise Building, Site Engineering and Water Supply.
What are the top questions asked in Nagarjuna Construction Company Senior Engineer interview?

Some of the top questions asked at the Nagarjuna Construction Company Senior Engineer interview -

  1. How many dumpers needed for 15 km how many excavators requi...read more
  2. What is the role of BBS (Bar Bending Schedule) in the context of Reinforced Cem...read more
  3. Different types of Formwork...read more
What are the most common questions asked in Nagarjuna Construction Company Senior Engineer HR round?

The most common HR questions asked in Nagarjuna Construction Company Senior Engineer interview are -

  1. Why are you looking for a chan...read more
  2. What are your salary expectatio...read more
  3. What is your family backgrou...read more
How long is the Nagarjuna Construction Company Senior Engineer interview process?

The duration of Nagarjuna Construction Company Senior Engineer interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

4.2/5

based on 23 interview experiences

Difficulty level

Easy 40%
Moderate 40%
Hard 20%

Duration

Less than 2 weeks 80%
2-4 weeks 20%
View more
Nagarjuna Construction Company Senior Engineer Salary
based on 410 salaries
₹4.8 L/yr - ₹11.1 L/yr
20% less than the average Senior Engineer Salary in India
View more details

Nagarjuna Construction Company Senior Engineer Reviews and Ratings

based on 147 reviews

4.3/5

Rating in categories

3.8

Skill development

4.0

Work-life balance

4.0

Salary

4.3

Job security

4.0

Company culture

3.8

Promotions

3.9

Work satisfaction

Explore 147 Reviews and Ratings
Junior Engineer
984 salaries
unlock blur

₹2.2 L/yr - ₹6 L/yr

Assistant Engineer
839 salaries
unlock blur

₹3.9 L/yr - ₹8.4 L/yr

Junior Engineer Civil
428 salaries
unlock blur

₹2.2 L/yr - ₹7.5 L/yr

Senior Engineer
410 salaries
unlock blur

₹4.8 L/yr - ₹11.1 L/yr

Assistant Engineer - Civil
296 salaries
unlock blur

₹3.7 L/yr - ₹7.9 L/yr

Explore more salaries
Compare Nagarjuna Construction Company with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Kalpataru Projects International

4.2
Compare
write
Share an Interview