Filter interviews by
Shuttering scheme refers to the temporary structure used to support concrete during curing until it gains strength.
Shuttering is essential for shaping and supporting concrete structures like beams, slabs, and columns.
Common materials for shuttering include plywood, steel, and aluminum.
The design of the shuttering scheme must consider load-bearing capacity and safety.
Examples include traditional timber formwork and...
BBS is crucial for detailing and quantifying reinforcement in RCC, ensuring structural integrity and cost efficiency.
BBS provides a detailed list of all reinforcement bars required for a project, including their lengths and diameters.
It helps in accurate estimation of material quantities, reducing wastage and optimizing costs.
BBS aids in the scheduling of work, ensuring timely procurement and placement of reinforc...
Project execution methodologies guide how projects are planned, executed, and delivered, ensuring efficiency and effectiveness.
Waterfall: A linear approach where each phase must be completed before the next begins. Example: Construction projects.
Agile: An iterative approach that allows for flexibility and customer feedback. Example: Software development.
Scrum: A subset of Agile focusing on short sprints and regula...
The quantity done by 200 machines in an hour depends on the efficiency and capacity of each machine.
The quantity done will depend on the output capacity of each machine
Factors such as machine speed, efficiency, and type of work being done will also impact the quantity produced
For example, if each machine can produce 10 units per hour, then 200 machines will produce 2000 units in an hour
What people are saying about Nagarjuna Construction Company
A lead is a potential customer or client who has shown interest in a product or service.
A lead is typically generated through marketing efforts such as advertising or networking.
Leads can be obtained through various channels such as social media, email campaigns, or trade shows.
Once a lead is identified, they are usually passed on to the sales team for further follow-up and conversion.
Qualifying leads involves det...
Formwork is a temporary structure used to support and shape concrete during construction.
Timber formwork: made of wood and commonly used for small to medium-sized projects.
Steel formwork: made of steel plates and used for large-scale projects.
Aluminum formwork: lightweight and easy to handle, suitable for repetitive use.
Plastic formwork: made of plastic panels or sheets, used for simple structures and low-cost pro...
The density of cement varies depending on the type of cement and its composition.
The density of ordinary Portland cement is around 3.15 g/cm³
The density of white cement is around 2.90 g/cm³
The density of low heat cement is around 3.0 g/cm³
The density of high alumina cement is around 3.0 g/cm³
The density of rapid hardening cement is around 3.15 g/cm³
The number of dumpers and excavators needed for a 15 km project depends on various factors such as the type of material being transported and the size of the excavation area.
The number of dumpers needed for a 15 km project will depend on the volume and weight of material to be transported, as well as the capacity of each dumper.
The number of excavators required will depend on the size of the excavation area, the t...
I worked at XYZ Company as a Senior Engineer. My family background includes a mix of professionals and entrepreneurs.
Worked at XYZ Company as a Senior Engineer
Family background includes professionals and entrepreneurs
I appeared for an interview in Dec 2024, where I was asked the following questions.
Shuttering scheme refers to the temporary structure used to support concrete during curing until it gains strength.
Shuttering is essential for shaping and supporting concrete structures like beams, slabs, and columns.
Common materials for shuttering include plywood, steel, and aluminum.
The design of the shuttering scheme must consider load-bearing capacity and safety.
Examples include traditional timber formwork and mode...
BBS is crucial for detailing and quantifying reinforcement in RCC, ensuring structural integrity and cost efficiency.
BBS provides a detailed list of all reinforcement bars required for a project, including their lengths and diameters.
It helps in accurate estimation of material quantities, reducing wastage and optimizing costs.
BBS aids in the scheduling of work, ensuring timely procurement and placement of reinforcement...
Project execution methodologies guide how projects are planned, executed, and delivered, ensuring efficiency and effectiveness.
Waterfall: A linear approach where each phase must be completed before the next begins. Example: Construction projects.
Agile: An iterative approach that allows for flexibility and customer feedback. Example: Software development.
Scrum: A subset of Agile focusing on short sprints and regular upd...
I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.
I currently work at Tech Innovations Inc., where we develop cutting-edge software solutions for various industries.
I lead a team of engineers in developing scalable web applications, improving user experience by 30%.
Implemented Agile methodologies, resulting in a 25% increase in project delivery speed.
Collaborated with cross-functional teams to integrate AI features into our products, enhancing functionality.
Mentored j...
I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.
Project Details Work Assignment
I applied via Company Website and was interviewed in Sep 2023. There was 1 interview round.
I applied via Company Website and was interviewed in Feb 2023. There were 3 interview rounds.
I appeared for an interview before Mar 2024, where I was asked the following questions.
I applied via Approached by Company and was interviewed before Jun 2023. There were 2 interview rounds.
I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.
The number of dumpers and excavators needed for a 15 km project depends on various factors such as the type of material being transported and the size of the excavation area.
The number of dumpers needed for a 15 km project will depend on the volume and weight of material to be transported, as well as the capacity of each dumper.
The number of excavators required will depend on the size of the excavation area, the type o...
The duration of Nagarjuna Construction Company Senior Engineer interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 23 interview experiences
Difficulty level
Duration
based on 147 reviews
Rating in categories
Junior Engineer
984
salaries
| ₹2.2 L/yr - ₹6 L/yr |
Assistant Engineer
839
salaries
| ₹3.9 L/yr - ₹8.4 L/yr |
Junior Engineer Civil
428
salaries
| ₹2.2 L/yr - ₹7.5 L/yr |
Senior Engineer
410
salaries
| ₹4.8 L/yr - ₹11.1 L/yr |
Assistant Engineer - Civil
296
salaries
| ₹3.7 L/yr - ₹7.9 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Kalpataru Projects International