I appeared for an interview in Oct 2024, where I was asked the following questions.
Finishing work encompasses final touches in construction, including plumbing, electrical, painting, and landscaping tasks.
Plumbing: Installation of pipes, fixtures, and fittings for water supply and drainage.
Electrical: Wiring, lighting installation, and electrical system setup.
Waterproofing: Applying materials to prevent water ingress in structures.
Tiling: Laying tiles for floors and walls, enhancing aesthetics and du...
PCC is plain concrete, while RCC includes steel reinforcement for added strength and durability.
PCC is used for non-structural applications like flooring and pavements.
RCC is essential for structural components like beams, columns, and slabs.
PCC has lower tensile strength compared to RCC, making it less suitable for load-bearing structures.
RCC can withstand both compressive and tensile forces due to the presence of ste...
Fe415 is a grade of steel indicating its yield strength and quality, commonly used in construction.
The 'Fe' in Fe415 stands for 'Ferrous', indicating the presence of iron.
The number '415' represents the minimum yield strength of the steel in megapascals (MPa).
Fe415 steel can withstand a yield strength of 415 MPa, making it suitable for structural applications.
Commonly used in reinforced concrete structures, such as bea...
Top trending discussions
I applied via Referral
posted on 2 Dec 2024
Tiling is a process of dividing a larger area into smaller, manageable sections for efficient processing or analysis.
Used in computer graphics to manage rendering of large images or scenes.
In GIS, tiling helps in efficient storage and retrieval of spatial data.
Example: Google Maps uses tiling to load map sections dynamically.
In data processing, tiling can optimize algorithms by breaking data into chunks.
I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.
A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.
Shunt relay is connected in parallel with the main circuit of the ACB.
It detects overcurrents and activates to divert the excess current through a shunt path.
This helps in protecting the main circuit from damage due to overcurrents.
Shunt relays are commonly used in Air Circuit Breakers (ACBs...
CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.
CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.
It is often required in HVAC projects to ensure quality and compliance.
CoC may include details such as product specifications, testing results, and manufacturer information.
Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.
Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.
Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.
BOD is a ...
A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.
Monitors voltage levels in electrical systems
Triggers alarm or protective action if voltage exceeds or falls below set threshold
Used to protect equipment from damage due to voltage fluctuations
WTP plant works on the principle of physical and chemical processes to remove impurities from water.
Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.
Coagulation involves adding chemicals to water to make impurities clump together.
Flocculation helps in forming larger particles called floc for easier removal.
Sedimentation allows the floc to sett...
I provide daily and monthly reports on project progress, issues, and key metrics to track performance.
Daily reports include updates on tasks completed, challenges faced, and plans for the next day.
Monthly reports summarize overall progress, budget status, and any potential risks or delays.
Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...
posted on 15 Mar 2025
I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Jun 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Oct 2023. There were 4 interview rounds.
In my previous role, I led engineering projects, focusing on system optimization and team collaboration, leaving for career advancement.
Led a team of engineers to develop a new software application that improved processing speed by 30%.
Managed cross-functional projects, ensuring timely delivery and adherence to quality standards.
Implemented Agile methodologies, which increased team productivity and reduced project turn...
I have managed diverse engineering projects, focusing on design, development, and team collaboration to deliver high-quality solutions.
Led a team of engineers in developing a scalable web application, improving performance by 30%.
Implemented Agile methodologies, resulting in a 25% increase in project delivery speed.
Conducted code reviews and mentoring sessions, enhancing team skills and code quality.
Collaborated with c...
posted on 4 Apr 2025
I appeared for an interview in Oct 2024, where I was asked the following questions.
Extensive experience in civil construction, focusing on project management, quality control, and team collaboration.
Managed multiple large-scale construction projects, ensuring timely completion and adherence to budget constraints.
Implemented quality control measures that reduced rework by 20%, enhancing overall project efficiency.
Collaborated with architects and engineers to optimize design plans, resulting in a 15% c...
Tile flooring involves selecting, preparing, and installing tiles for aesthetic and functional purposes in flats.
Choose the right type of tile: ceramic, porcelain, vinyl, or natural stone.
Prepare the subfloor: ensure it's clean, dry, and level.
Use appropriate adhesive: thin-set mortar for most tiles, mastic for vinyl.
Measure and plan layout: start from the center for symmetry.
Cut tiles as needed: use a tile cutter or w...
Snagging and de-snagging involve identifying and rectifying defects in newly constructed flats before handover.
Snagging is the process of inspecting a property for defects or unfinished work.
Common snags include paint imperfections, misaligned doors, and plumbing issues.
De-snagging refers to the rectification of identified issues before final handover.
For example, if a window doesn't close properly, it would be noted d...
Some of the top questions asked at the Alliance Group Engineer Civil Engineer interview -
based on 1 interview experience
Difficulty level
Duration
based on 1 review
Rating in categories
Assistant Manager
59
salaries
| ₹3.8 L/yr - ₹8 L/yr |
Deputy Manager
40
salaries
| ₹4.4 L/yr - ₹10 L/yr |
Senior Engineer
17
salaries
| ₹3.8 L/yr - ₹7.5 L/yr |
Senior Executive
14
salaries
| ₹2.7 L/yr - ₹4.9 L/yr |
Sales Manager
13
salaries
| ₹6 L/yr - ₹9.5 L/yr |
JLL
CBRE
NoBroker
Lodha Group