Upload Button Icon Add office photos

Alliance Group

Compare button icon Compare button icon Compare

Filter interviews by

Alliance Group Software Development Engineer Interview Questions and Answers

Updated 12 Jul 2022

Alliance Group Software Development Engineer Interview Experiences

1 interview found

I applied via Campus Placement

Round 1 - Assignment 

I was given an hour to develop a basic website with three 3D objects generated using THREE js and a routes button for those objects.

Round 2 - Technical 

(1 Question)

  • Q1. They questioned reactjs, NodeJS, javascript, and MongoDB.
Round 3 - HR 

(1 Question)

  • Q1. They questioned me about complex technical and personal questions from my resume and past experience.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be thorough with your resume and be confident.

Top trending discussions

View All
Interview Hub
1w
a team lead
FeedCard Image
Got a question about Alliance Group?
Ask anonymously on communities.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via LinkedIn and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. How do you design metro line for new station
  • Ans. 

    Designing a metro line for a new station involves planning routes, considering passenger flow, and ensuring connectivity.

    • Conduct a feasibility study to determine the need for a new station

    • Consider factors such as population density, traffic patterns, and potential future growth

    • Plan the route to optimize connectivity with existing stations and transportation hubs

    • Design the station layout to accommodate passenger flow an...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. How do you learn about our company
  • Q2. What should one do in tough times

Software Development Engineer Interview Questions Asked at Other Companies

asked in Amazon
Q1. Given an acyclic graph of a city where each edge represents a roa ... read more
asked in Hike
Q2. Given a screen with a button and a full-screen image view, descri ... read more
asked in Hike
Q3. You have an application that displays a list of contacts. The nam ... read more
asked in Amazon
Q4. Given an m * n matrix filled with '0's and 'x's with two position ... read more
asked in Samsung
Q5. There are 1000 wine bottles. One of the bottles contains poisoned ... read more
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is tiling process
  • Ans. 

    Tiling is a process of dividing a larger area into smaller, manageable sections for efficient processing or analysis.

    • Used in computer graphics to manage rendering of large images or scenes.

    • In GIS, tiling helps in efficient storage and retrieval of spatial data.

    • Example: Google Maps uses tiling to load map sections dynamically.

    • In data processing, tiling can optimize algorithms by breaking data into chunks.

  • Answered by AI
  • Q2. As per work poliy and methods telling all the process
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Introduction, previous experience
Round 3 - Technical 

(1 Question)

  • Q1. Past experience and rates

Interview Preparation Tips

Interview preparation tips for other job seekers - Pressure will be more, since i worked in engineering team compare to others contracts department will be feeling the pressure more

Interview Questionnaire 

1 Question

  • Q1. Past work experience and some technical work related questions

Alliance Group HR Interview Questions

9 questions and answers

Q. What's your Name?
Q. Are you married?
Q. What's your age?

I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. 1.Social Media integration , Coroutne, RXJava Operators, MVVM, Jetpack,Room DB,Java Basics

Interview Preparation Tips

Interview preparation tips for other job seekers - You should have good communications skill, The interview is not that hard just brush up your basics.
Are these interview questions helpful?
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. LT Side Equipments
Round 3 - HR 

(1 Question)

  • Q1. Introduction & Salary
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Coding Test 

90 min, DSA, hacker platform 3 question

Round 2 - Technical 

(2 Questions)

  • Q1. 2D DP WITH SPACE OPTIMIZATION
  • Ans. 

    2D DP with space optimization is a technique to reduce memory usage while solving dynamic programming problems.

    • Use a 1D array instead of a 2D array to store values in dynamic programming problems.

    • Update the values in the 1D array based on the dependencies between subproblems.

    • Example: Solving the longest common subsequence problem using 2D DP with space optimization.

  • Answered by AI
  • Q2. GRAPH WITH BFS ON TREE
  • Ans. 

    Breadth First Search (BFS) on a tree involves visiting nodes level by level starting from the root.

    • Start by visiting the root node, then visit all its children before moving on to the next level

    • Use a queue data structure to keep track of nodes to visit next

    • Repeat the process until all nodes have been visited

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Campus Placement

Round 1 - Aptitude Test 

Asked basics aptitude qns(profit loss,percentage)

Alliance Group Interview FAQs

How many rounds are there in Alliance Group Software Development Engineer interview?
Alliance Group interview process usually has 3 rounds. The most common rounds in the Alliance Group interview process are Assignment, Technical and HR.

Tell us how to improve this page.

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 416 Interviews
CBRE Interview Questions
4.1
 • 304 Interviews
NoBroker Interview Questions
3.0
 • 256 Interviews
Kalpataru Limited Interview Questions
4.1
 • 145 Interviews
Lodha Group Interview Questions
4.0
 • 141 Interviews
Cushman & Wakefield Interview Questions
4.1
 • 93 Interviews
InvestoXpert Interview Questions
4.2
 • 78 Interviews
Colliers India Interview Questions
3.9
 • 76 Interviews
Casagrand Interview Questions
3.8
 • 62 Interviews
View all

Alliance Group Software Development Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

5.0

Skill development

4.0

Work-life balance

4.0

Salary

3.0

Job security

4.0

Company culture

4.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
59 salaries
unlock blur

₹3.8 L/yr - ₹8 L/yr

Deputy Manager
40 salaries
unlock blur

₹4.4 L/yr - ₹10 L/yr

Senior Engineer
17 salaries
unlock blur

₹3.8 L/yr - ₹7.5 L/yr

Senior Executive
14 salaries
unlock blur

₹2.7 L/yr - ₹4.9 L/yr

Sales Manager
13 salaries
unlock blur

₹6 L/yr - ₹9.5 L/yr

Explore more salaries
Compare Alliance Group with

JLL

4.1
Compare

CBRE

4.1
Compare

NoBroker

3.0
Compare

Lodha Group

4.0
Compare
write
Share an Interview