Filter interviews by
I applied via LinkedIn and was interviewed in Mar 2023. There were 3 interview rounds.
Top trending discussions
posted on 14 Jul 2017
I appeared for an interview before Jul 2016.
posted on 20 Feb 2015
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 10 Sep 2017
I appeared for an interview before Sep 2016.
I would like to work in a marketing and communications profile.
Experience in creating marketing campaigns
Strong communication skills
Ability to analyze market trends and consumer behavior
Proficiency in social media and digital marketing
Collaboration with cross-functional teams
posted on 11 May 2018
posted on 10 Sep 2020
I applied via Campus Placement and was interviewed before Sep 2019. There were 4 interview rounds.
posted on 2 Mar 2021
I appeared for an interview before Mar 2020.
I appeared for an interview before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
based on 1 interview experience
Difficulty level
Duration
based on 6 reviews
Rating in categories
Civil Site Engineer
5
salaries
| ₹1.4 L/yr - ₹4.3 L/yr |
Project Manager
4
salaries
| ₹3.1 L/yr - ₹7.8 L/yr |
Project Engineer - Civil
3
salaries
| ₹3 L/yr - ₹5.8 L/yr |
5 Star Constructions
Dongyang Construction
Design Group Project Consultants
Sarbottam Cement