Premium Employer

i

This company page is being actively managed by Blue Star Team. If you also belong to the team, you can get access from here

Blue Star Verified Tick Work with us arrow

Compare button icon Compare button icon Compare

Filter interviews by

Blue Star Site Engineer Interview Questions and Answers

Updated 5 Feb 2025

6 Interview questions

A Site Engineer was asked 6mo ago
Q. What questions do you have about the company or the role?
Ans. 

As a site engineer, I ensure project execution aligns with design, safety, and quality standards while managing resources effectively.

  • Coordinate with architects and contractors to ensure project specifications are met.

  • Conduct regular site inspections to monitor progress and compliance with safety regulations.

  • Manage project timelines and budgets, adjusting plans as necessary to meet deadlines.

  • Example: Successfully ...

A Site Engineer was asked
Q. What materials are used for earthing?
Ans. 

Materials commonly used for earthing include copper, galvanized steel, and conductive concrete.

  • Copper rods

  • Galvanized steel rods

  • Conductive concrete

  • Earthing strips

  • Earthing plates

Site Engineer Interview Questions Asked at Other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimensio ... read more
Q2. What is the definition of rolling margin in the context of steel?
Q3. Which type of pipeline and standards do you follow?
Q4. design? 1.what is ASD in steel design? 2.what is special consider ... read more
Q5. What is the lapping zone of beam rebar at top and bottom...? Why ... read more
A Site Engineer was asked
Q. What is the full form of MCBA?
Ans. 

MCBA stands for Master of Construction Business Administration.

  • MCBA is a postgraduate degree program that focuses on the business aspects of the construction industry.

  • It covers topics such as project management, finance, marketing, and strategic planning.

  • Example: John completed his MCBA to advance his career in construction management.

A Site Engineer was asked
Q. What is the standard earthing voltage?
Ans. 

The standard earthing voltage is typically 0 volts.

  • Standard earthing voltage is usually 0 volts to ensure safety in electrical systems

  • Earthing voltage can vary depending on the specific requirements of the system

  • Proper earthing helps to prevent electrical shocks and equipment damage

A Site Engineer was asked
Q. What converts AC to DC?
Ans. 

AC is converted to DC using a rectifier circuit.

  • AC to DC conversion is done using a rectifier circuit, which converts alternating current (AC) to direct current (DC).

  • Rectifier circuits can be half-wave or full-wave, depending on the type of rectification needed.

  • Examples of rectifier circuits include diode rectifiers, bridge rectifiers, and voltage multiplier circuits.

A Site Engineer was asked
Q. How many types of pipes are used in HVAC systems?
Ans. 

There are several types of pipes used in HVAC systems.

  • Copper pipes: commonly used for refrigerant lines and water supply

  • PVC pipes: used for condensate drain lines

  • Galvanized steel pipes: used for ductwork and water supply

  • Flexible ducts: used for air distribution

  • PEX pipes: used for radiant heating systems

  • Stainless steel pipes: used for high-pressure applications

Blue Star HR Interview Questions

68 questions and answers

Q. Why are you interested in working with Blue Star?
Q. Explain your previous work experience.
Q. How do you handle overseas customers and teams?

Blue Star Site Engineer Interview Experiences

4 interviews found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 21 Apr 2024

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Campus Placement

Round 1 - Technical 

(4 Questions)

  • Q1. What makes ac to dc
  • Ans. Rectifier
  • Answered Anonymously
  • Q2. What's materials used for earthing
  • Ans. GI & CU
  • Answered Anonymously
  • Q3. Full form of MCBA
  • Q4. What is the standard earthing voltage
  • Ans. 

    The standard earthing voltage is typically 0 volts.

    • Standard earthing voltage is usually 0 volts to ensure safety in electrical systems

    • Earthing voltage can vary depending on the specific requirements of the system

    • Proper earthing helps to prevent electrical shocks and equipment damage

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. How long you can join
  • Ans. As early as possible
  • Answered Anonymously
  • Q2. As early as possible

Interview Preparation Tips

Topics to prepare for Blue Star Site Engineer interview:
  • Electrical Engineering
  • Mechanical
  • HVAC Engineering
  • Air Conditioning
Interview preparation tips for other job seekers - Read construction Site related questions
Are these interview questions helpful?
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is your job role in the carrent company?
  • Ans. 

    As a Site Engineer, I oversee construction projects, ensuring quality, safety, and adherence to timelines and budgets.

    • Project Management: I coordinate with contractors and subcontractors to ensure that the project is completed on time and within budget. For example, I recently managed a residential building project that was completed two weeks ahead of schedule.

    • Quality Control: I conduct regular inspections to ensure t...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Can you describe your experience in your previous company?
  • Ans. 

    I have 3 years of experience as a site engineer in a construction company.

    • Managed multiple construction projects simultaneously

    • Ensured compliance with building codes and regulations

    • Coordinated with architects, subcontractors, and clients

    • Performed site inspections and quality control checks

    • Prepared progress reports and updated project schedules

  • Answered by AI
  • Q2. General HR round
  • Ans. 

    As a site engineer, I ensure project execution aligns with design, safety, and quality standards while managing resources effectively.

    • Coordinate with architects and contractors to ensure project specifications are met.

    • Conduct regular site inspections to monitor progress and compliance with safety regulations.

    • Manage project timelines and budgets, adjusting plans as necessary to meet deadlines.

    • Example: Successfully led a...

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. How many type of pipe use in hvac
  • Ans. 

    There are several types of pipes used in HVAC systems.

    • Copper pipes: commonly used for refrigerant lines and water supply

    • PVC pipes: used for condensate drain lines

    • Galvanized steel pipes: used for ductwork and water supply

    • Flexible ducts: used for air distribution

    • PEX pipes: used for radiant heating systems

    • Stainless steel pipes: used for high-pressure applications

  • Answered by AI

Top trending discussions

View All
Interview Hub
6d (edited)
anshitanegi
·
ex -
Planet Spark
When HR’s Chinese English made me drop the interview!
So, I talked to the HR yesterday about the interview. I asked Please send me the location But their English… bro I was shocked! It was like talking to someone jisne english nahi kuch ar hi seekh liya ho, if the HR’s English is this I can only imagine the rest of the company I decided to drop the interview with this chinese english😶‍🌫️
FeedCard Image
Got a question about Blue Star?
Ask anonymously on communities.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. (1)Why transformers rating is in kva ?
  • Ans. 

    Transformers rating is in kVA because it takes into account both voltage and current.

    • kVA is a unit of apparent power, which is the combination of real power (measured in kW) and reactive power (measured in kVAR).

    • Transformers are designed to handle a certain amount of power, and kVA rating takes into account both the voltage and current that the transformer can handle.

    • For example, a transformer with a rating of 100 kVA ...

  • Answered by AI
  • Q2. What is difference between ground and earth

Interview Preparation Tips

Topics to prepare for Bajaj Electricals Site Engineer interview:
  • Transformers
  • Transmission

Site Engineer Interview Questions & Answers

Voltas user image ROHIT KUMAR MALAKAR

posted on 17 Aug 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Naukri.com and was interviewed in Jun 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(6 Questions)

  • Q1. Treated fresh unit equipment parts name ??
  • Ans. 

    Treated fresh unit equipment parts are components used in the treatment of fresh water in a unit.

    • Pumps

    • Filters

    • Valves

    • Chemical dosing systems

    • Control panels

    • Flow meters

  • Answered by AI
  • Q2. TFA working principle ??
  • Ans. 

    TFA stands for Thin Film Antenna. It is a type of antenna that uses a thin film of conductive material to transmit and receive signals.

    • TFA works on the principle of using a thin film of conductive material as the antenna element.

    • The conductive film is usually made of materials like copper or gold.

    • The film is deposited on a substrate, which provides mechanical support and insulation.

    • TFA antennas are lightweight, flexibl...

  • Answered by AI
  • Q3. Heat load calculation??
  • Q4. How to calculate duct size ??
  • Ans. 

    Duct size can be calculated based on the required airflow, velocity, and friction loss.

    • Determine the required airflow for the space or system.

    • Calculate the velocity of the air based on the desired airflow and the cross-sectional area of the duct.

    • Consider the friction loss in the duct system due to fittings, bends, and length.

    • Use duct sizing charts or software to find the appropriate duct size based on the calculated ve...

  • Answered by AI
  • Q5. AHU and chiller working with diagram ??
  • Ans. 

    AHU and chiller are essential components of HVAC systems.

    • AHU stands for Air Handling Unit and is responsible for circulating and conditioning air within a building.

    • Chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle.

    • AHU and chiller work together to provide cooled air to the building.

    • AHU takes in outside air, filters it, cools or heats it, and then distributes i...

  • Answered by AI
  • Q6. How ventilation CFM calculate.
  • Ans. 

    Ventilation CFM is calculated by determining the volume of air to be exchanged per minute.

    • CFM stands for Cubic Feet per Minute.

    • To calculate ventilation CFM, you need to know the volume of the space and the desired air exchange rate.

    • The formula to calculate CFM is: CFM = (Volume of Space) x (Air Exchange Rate)

    • For example, if the volume of a room is 1000 cubic feet and the desired air exchange rate is 5 times per hour, t...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Current CTC and expected CTC ??
  • Ans. 

    The current CTC and expected CTC are financial aspects of the job that need to be discussed during the negotiation process.

    • Current CTC refers to the current salary or compensation package of the candidate.

    • Expected CTC refers to the salary or compensation package the candidate is looking for in the new role.

    • These figures are important for both the employer and the candidate to ensure alignment and avoid any misunderstan...

  • Answered by AI
  • Q2. Notice period and sooner you can join ??
Round 4 - Technical 

(2 Questions)

  • Q1. How to calculate Exhaust CFM calculate??
  • Ans. 

    Exhaust CFM can be calculated by determining the air volume flow rate in cubic feet per minute.

    • Determine the area of the exhaust opening

    • Measure the velocity of the air being exhausted

    • Multiply the area by the velocity to get the air volume flow rate in cubic feet per minute

  • Answered by AI
  • Q2. Duct size with gauge??
  • Ans. 

    Duct size is determined by the gauge of the material used.

    • Duct size refers to the dimensions of the ductwork used in HVAC systems.

    • The gauge of the material refers to its thickness or weight.

    • Thicker gauge materials are used for larger duct sizes to ensure structural integrity.

    • Common gauges for ductwork range from 26 to 16, with lower numbers indicating thicker materials.

    • For example, a 16-gauge duct would be used for lar...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Voltas Site Engineer interview:
  • Great
  • Technical
Interview preparation tips for other job seekers - More Preparation required for big companies??
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Assignment 

How to work in HT line

Round 3 - Technical 

(2 Questions)

  • Q1. Explain , what types of work you have completed.
  • Q2. Explain, each every individual work which is you doing in project work.

I applied via Naukri.com and was interviewed in Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Ask about my previous experience relevent to upcoming new job.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident about your relevent field knowledge.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. Earthing dimension
  • Q2. How many pole 1km cabling
  • Ans. 

    The number of pole 1km cabling required depends on the specific project requirements and design considerations.

    • The number of pole 1km cabling needed will depend on the distance to be covered and the spacing between poles.

    • Factors such as terrain, existing infrastructure, and local regulations will also impact the number of poles required.

    • For example, in a straight road with no obstacles, fewer poles may be needed compar...

  • Answered by AI
  • Q3. Pole base plate size
  • Ans. 

    The size of the pole base plate depends on the load requirements and soil conditions.

    • The size of the pole base plate should be determined by the structural engineer based on the load requirements of the pole.

    • The soil conditions at the site also play a crucial role in determining the size of the base plate.

    • Factors such as wind load, seismic activity, and the weight of the pole itself should be considered when determinin...

  • Answered by AI
  • Q4. Stay plate dimension
  • Ans. 

    Stay plate dimensions are typically specified by the engineer or designer based on the specific requirements of the structure.

    • Stay plate dimensions are determined based on the load and stress requirements of the structure.

    • The dimensions of stay plates can vary depending on the material used and the design specifications.

    • Stay plates are often designed to distribute loads and provide stability in structures such as bridg...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Notice period of joining

Interview Questionnaire 

1 Question

  • Q1. All technical questions raised

Blue Star Interview FAQs

How many rounds are there in Blue Star Site Engineer interview?
Blue Star interview process usually has 1-2 rounds. The most common rounds in the Blue Star interview process are Technical and One-on-one Round.
How to prepare for Blue Star Site Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Blue Star. The most common topics and skills that interviewers at Blue Star expect are Chillers, Engineering Drawing, Engineering Projects, HVAC and HVAC Engineering.
What are the top questions asked in Blue Star Site Engineer interview?

Some of the top questions asked at the Blue Star Site Engineer interview -

  1. How many type of pipe use in hv...read more
  2. What is the standard earthing volt...read more
  3. What's materials used for earth...read more

Tell us how to improve this page.

Overall Interview Experience Rating

3.8/5

based on 4 interview experiences

Difficulty level

Moderate 100%

Duration

Less than 2 weeks 100%
View more
Join Blue Star India's leading Air Conditioning and Commercial Refrigeration Company
Blue Star Site Engineer Salary
based on 146 salaries
₹2.6 L/yr - ₹7.5 L/yr
19% more than the average Site Engineer Salary in India
View more details

Blue Star Site Engineer Reviews and Ratings

based on 47 reviews

3.6/5

Rating in categories

3.2

Skill development

3.0

Work-life balance

3.2

Salary

3.1

Job security

3.2

Company culture

2.7

Promotions

3.0

Work satisfaction

Explore 47 Reviews and Ratings
Assistant Manager
860 salaries
unlock blur

₹9 L/yr - ₹15 L/yr

Senior Engineer
372 salaries
unlock blur

₹4.5 L/yr - ₹10 L/yr

Deputy Manager
291 salaries
unlock blur

₹13.5 L/yr - ₹21.9 L/yr

AC Technician
207 salaries
unlock blur

₹1.8 L/yr - ₹5 L/yr

Safety Officer
161 salaries
unlock blur

₹2.4 L/yr - ₹6.5 L/yr

Explore more salaries
Compare Blue Star with

OPPO

3.9
Compare

LG Electronics

3.9
Compare

Bajaj Electricals

3.9
Compare

Voltas

4.0
Compare
write
Share an Interview