Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by DS-MAX Properties Team. If you also belong to the team, you can get access from here

DS-MAX Properties Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

DS-MAX Properties Executive Engineer Interview Questions and Answers

Updated 28 Jun 2024

DS-MAX Properties Executive Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. How you do plaster?
  • Ans. 

    Plastering involves applying a layer of plaster to walls or ceilings to create a smooth surface.

    • Prepare the surface by cleaning and dampening it

    • Mix plaster with water to create a workable consistency

    • Apply the plaster using a trowel, starting from the top and working downwards

    • Smooth and level the plaster with a float or trowel

    • Allow the plaster to dry before applying additional coats or finishing touches

  • Answered by AI
  • Q2. Briefly describe the slab casting process
  • Ans. 

    Slab casting process involves pouring molten metal into a mold to create a flat, rectangular slab.

    • Preparation of mold with proper dimensions and materials

    • Heating and melting of metal to liquid state

    • Pouring molten metal into the mold

    • Cooling and solidifying of the metal slab

    • Removing the slab from the mold for further processing

  • Answered by AI
  • Q3. How & what are you check in BBS
  • Ans. 

    BBS (Behavior Based Safety) checks involve observing and evaluating behaviors to ensure safety protocols are being followed.

    • Observe workers performing tasks to ensure they are following safety procedures

    • Provide feedback and coaching to workers on safe behaviors

    • Document any unsafe behaviors or conditions observed

    • Conduct regular audits to monitor compliance with safety protocols

  • Answered by AI
  • Q4. Estimate and quantity

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good for freshers

Top trending discussions

View All
Interview Tips & Stories
2w (edited)
timepasstiwari
·
A Digital Markter
Nailed the interview, still rejected
Just had the BEST interview ever – super positive and encouraging! But got rejected. Interviewer said I was the most prepared, knew it was a full-time role (unlike others), and loved my answers. One of my questions was even called "the best ever asked!" He showed me around, said I was exactly what they wanted, and would get back by Friday. I was so hyped! Then today, I got the rejection email. No reason given, just "went with someone else." Feels bad when your best isn't enough. Anyone else been there? How'd you cope?
Got a question about DS-MAX Properties?
Ask anonymously on communities.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. Work experience
  • Q2. Technical questions
  • Q3. Personal information
  • Q4. Expectations from company
  • Ans. 

    I expect the company to provide opportunities for growth, a supportive work environment, and recognition for achievements.

    • Opportunities for professional development and advancement

    • A positive and supportive work culture

    • Recognition for achievements and contributions

    • Competitive compensation and benefits

    • Clear communication and feedback from management

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company for learners

Executive Engineer Interview Questions Asked at Other Companies

asked in TCS
Q1. Question 1: What is memory leak? Question 2: What is static varia ... read more
Q2. What are the main contaminants in safe drinking water?
Q3. What is material balance ? And wrote down the column material bal ... read more
Q4. What kind of nozzle is used for slab cooling in a continuous cast ... read more
Q5. What are the various ways to protect a distribution transformer?
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Describe in brief all the types of Building you have worked.
  • Ans. 

    I have worked on various types of buildings including residential, commercial, industrial, and institutional structures.

    • Residential buildings - single-family homes, apartments, condominiums

    • Commercial buildings - offices, retail stores, restaurants

    • Industrial buildings - factories, warehouses, manufacturing plants

    • Institutional buildings - schools, hospitals, government buildings

  • Answered by AI
  • Q2. Concrete mix design and their components
  • Ans. 

    Concrete mix design involves selecting the appropriate components and proportions to achieve desired properties.

    • Components of concrete mix design include cement, aggregates, water, and admixtures.

    • The proportions of each component are determined based on the desired strength, workability, and durability of the concrete.

    • For example, a typical mix design for a standard concrete mix may consist of 1 part cement, 2 parts fi...

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Different shuttering schemes you have worked
  • Ans. 

    I have worked on various shuttering schemes including traditional timber formwork, steel formwork, and modular formwork systems.

    • Traditional timber formwork: Used for simple structures and requires skilled carpenters.

    • Steel formwork: More durable and reusable, suitable for high-rise buildings and complex structures.

    • Modular formwork systems: Faster to assemble and disassemble, ideal for repetitive use in large projects.

    • Ex...

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. Overall experience in brief of variable structure you have worked
  • Ans. 

    I have extensive experience working with variable structures in civil engineering projects.

    • Designed and implemented variable structure systems for bridges to accommodate different loads and environmental conditions

    • Utilized variable structure techniques in building foundations to account for soil variability

    • Managed projects involving variable structure components such as retractable roofs and movable walls

  • Answered by AI
Round 4 - HR 

(1 Question)

  • Q1. Salary negotiation
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 4 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Previous roles and responsibilities, reason for leaving the previous job
  • Ans. 

    In my previous role, I led engineering projects, focusing on system optimization and team collaboration, leaving for career advancement.

    • Led a team of engineers to develop a new software application that improved processing speed by 30%.

    • Managed cross-functional projects, ensuring timely delivery and adherence to quality standards.

    • Implemented Agile methodologies, which increased team productivity and reduced project turn...

  • Answered by AI
  • Q2. What are the activities, you have handled
  • Ans. 

    I have managed diverse engineering projects, focusing on design, development, and team collaboration to deliver high-quality solutions.

    • Led a team of engineers in developing a scalable web application, improving performance by 30%.

    • Implemented Agile methodologies, resulting in a 25% increase in project delivery speed.

    • Conducted code reviews and mentoring sessions, enhancing team skills and code quality.

    • Collaborated with c...

  • Answered by AI
Round 2 - Technical 

(3 Questions)

  • Q1. Discussing the overall experience technically
  • Q2. Various activities, about steel, manpower management, procurement
  • Q3. Cranes, concrete pumps, RMC, vendor management, followup with different consultant and dept, coordination and correspondence.
Round 3 - Technical 

(2 Questions)

  • Q1. This was also technical round, Challanges faced on last project
  • Q2. Project details of all executed projects
Round 4 - HR 

(1 Question)

  • Q1. Why do you want to change, expectations and the type of project you have done so far, & final negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared about you previous experience, the roles and responsibilities. And technically sound.
Be confident
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. LT Side Equipments
Round 3 - HR 

(1 Question)

  • Q1. Introduction & Salary

I applied via Walk-in and was interviewed in Jun 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Related to building &infrastructure execution

Interview Preparation Tips

Interview preparation tips for other job seekers - Detail execution process, billing related issue, contractor issue, material problem, hr related queries, technical interview
Are these interview questions helpful?

Executive Engineer Interview Questions & Answers

JLL user image Sahansheel Yadav

posted on 20 Jan 2025

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is the purpose of using a (PAC) in a data center?
  • Ans. 

    PACs in data centers are used for controlling and monitoring the power supply to equipment.

    • PACs help in managing power distribution efficiently in data centers.

    • They provide real-time monitoring of power usage and can help in identifying potential issues.

    • PACs can also help in implementing power-saving measures to reduce energy consumption.

    • Examples of PACs include Schneider Electric's PowerLogic system and Eaton's Power ...

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. Earthing, UPS block diagram, DG Checks, transformer maintenance etc.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jul 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Case Study 

Asking about the past experience

Round 3 - Technical 

(1 Question)

  • Q1. Taken by internal team, completely technical in electro-mechanical
Round 4 - Technical 

(1 Question)

  • Q1. By the client, completely technical

DS-MAX Properties Interview FAQs

How many rounds are there in DS-MAX Properties Executive Engineer interview?
DS-MAX Properties interview process usually has 1 rounds. The most common rounds in the DS-MAX Properties interview process are Technical.
What are the top questions asked in DS-MAX Properties Executive Engineer interview?

Some of the top questions asked at the DS-MAX Properties Executive Engineer interview -

  1. How & what are you check in ...read more
  2. Briefly describe the slab casting proc...read more
  3. How you do plast...read more

Tell us how to improve this page.

Overall Interview Experience Rating

5/5

based on 1 interview experience

Difficulty level

Moderate 100%

Duration

Less than 2 weeks 100%
View more

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 406 Interviews
CBRE Interview Questions
4.1
 • 298 Interviews
NoBroker Interview Questions
3.1
 • 253 Interviews
Lodha Group Interview Questions
4.0
 • 139 Interviews
Colliers India Interview Questions
3.9
 • 74 Interviews
K Raheja Corp Interview Questions
4.3
 • 52 Interviews
Knight Frank Interview Questions
4.1
 • 49 Interviews
SMEC Interview Questions
3.7
 • 27 Interviews
JP Infra Interview Questions
3.7
 • 20 Interviews
View all

DS-MAX Properties Executive Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

3.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

3.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Civil Site Engineer
39 salaries
unlock blur

₹2 L/yr - ₹5 L/yr

Site Engineer
31 salaries
unlock blur

₹2 L/yr - ₹4.6 L/yr

Project Engineer
20 salaries
unlock blur

₹3 L/yr - ₹6.5 L/yr

Project Manager
17 salaries
unlock blur

₹3 L/yr - ₹8 L/yr

Store Officer
16 salaries
unlock blur

₹3 L/yr - ₹5.6 L/yr

Explore more salaries
Compare DS-MAX Properties with

JLL

4.1
Compare

CBRE

4.1
Compare

NoBroker

3.1
Compare

Lodha Group

4.0
Compare
write
Share an Interview