I applied via Company Website and was interviewed in Nov 2022. There were 3 interview rounds.
Half an hour duration.Site related questions.
Workability of concrete refers to its ease of mixing, placing, and compacting.
Workability is affected by water content, aggregate size and shape, and admixtures.
A concrete mix with good workability will be easy to place and compact, resulting in a smooth finish.
However, if the mix is too workable, it may be prone to segregation and bleeding.
Longitudinal cracks on concrete pavements can be caused by a variety of factors...
Hollow blocks are commonly used in construction as they are lightweight, durable and provide good insulation.
Hollow blocks are made of concrete with hollow cores.
They are used for walls, partitions, and fences.
They are lightweight and easy to handle, reducing construction time and labor costs.
Hollow blocks provide good insulation, reducing energy costs for heating and cooling.
They are durable and resistant to fire, pes...
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 2 interview rounds.
I have over five years of experience as a Site Engineer, managing construction projects and ensuring quality and safety standards.
Managed a team of 10 workers on a residential project, completing it 2 weeks ahead of schedule.
Implemented safety protocols that reduced on-site accidents by 30%.
Coordinated with architects and contractors to ensure project specifications were met.
Conducted regular site inspections to monito...
I appeared for an interview in Apr 2025, where I was asked the following questions.
Waterproofing involves techniques to prevent water ingress in structures, ensuring durability and safety.
Membrane Waterproofing: Uses sheets or liquid membranes to create a barrier (e.g., bituminous membranes).
Cementitious Waterproofing: Involves applying a cement-based product to surfaces (e.g., for basements).
Crystalline Waterproofing: Utilizes chemical reactions to form crystals that block water pathways (e.g., in c...
The building finishing process involves final touches to enhance aesthetics and functionality using various materials.
1. Wall Finishes: Paint, wallpaper, or tiles are applied to enhance appearance.
2. Flooring: Options include tiles, hardwood, laminate, or carpet for durability and style.
3. Ceiling Treatments: Gypsum board, acoustic tiles, or decorative panels for aesthetics and sound control.
4. Fixtures: Installation o...
Aptitude test like mathematics question ,reasoning & our department like mechanical engineer
I appeared for an interview in Apr 2025, where I was asked the following questions.
I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.
CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.
CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.
It is often required in HVAC projects to ensure quality and compliance.
CoC may include details such as product specifications, testing results, and manufacturer information.
Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.
Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.
Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.
BOD is a ...
A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.
Monitors voltage levels in electrical systems
Triggers alarm or protective action if voltage exceeds or falls below set threshold
Used to protect equipment from damage due to voltage fluctuations
posted on 18 Mar 2025
I appeared for an interview in Feb 2025, where I was asked the following questions.
based on 1 interview experience
Difficulty level
Duration
based on 11 reviews
Rating in categories
Civil Site Engineer
39
salaries
| ₹2 L/yr - ₹5 L/yr |
Site Engineer
33
salaries
| ₹2 L/yr - ₹5.1 L/yr |
Project Engineer
20
salaries
| ₹3.6 L/yr - ₹8.2 L/yr |
Project Manager
18
salaries
| ₹3.3 L/yr - ₹8 L/yr |
Store Officer
18
salaries
| ₹3 L/yr - ₹5.6 L/yr |
JLL
CBRE
NoBroker
Lodha Group