Major breakdowns in heat treatment include improper quenching, overheating, and inadequate tempering.
Improper quenching can lead to distortion, cracking, and insufficient hardness.
Overheating can cause grain growth, loss of hardness, and reduced toughness.
Inadequate tempering can result in excessive hardness, brittleness, and reduced ductility.
Other breakdowns may include equipment failure, improper cleaning, and ...
The major problem in endo generator is overheating.
Overheating can cause damage to the generator and affect the quality of the end product.
The cooling system must be properly maintained to prevent overheating.
Other potential problems include electrical issues and mechanical failures.
Regular maintenance and inspections can help prevent these problems.
Proper training and education for operators is also important to ...
VA is value analysis, while VE is value engineering. Both are cost-saving techniques used in product development.
VA is a systematic review of a product's components and functions to identify areas where cost can be reduced without affecting performance.
VE is a more comprehensive approach that involves rethinking the entire product design to achieve cost savings while improving performance.
VA is typically used in t...
The cost of plastic molding components can be calculated by considering factors such as material cost, tooling cost, labor cost, and overhead cost.
Determine the material cost per unit of the component
Calculate the tooling cost, which includes the cost of the mold and any necessary equipment
Factor in the labor cost, which includes the cost of operating the molding machine and any necessary labor for finishing and a...
MSA stands for Measurement System Analysis.
MSA is a statistical method used to determine the variation and accuracy of a measurement system.
It helps to identify the sources of variation in a measurement system and improve its reliability.
MSA is commonly used in manufacturing and quality control processes.
Examples of measurement systems include scales, gauges, and thermometers.
The question includes topics such as HPDC process calculation, 5S, Kaizen implementation, reducing process rejection, and plan vs actual.
HPDC process calculation involves determining the parameters for high-pressure die casting.
5S is a methodology for workplace organization and standardization.
Kaizen is a continuous improvement approach that focuses on small incremental changes.
To reduce process rejection, one can...
OEE (Overall Equipment Effectiveness) and TPM (Total Productive Maintenance) are two important concepts in manufacturing.
OEE measures the efficiency of a machine or process by taking into account availability, performance, and quality.
TPM is a maintenance strategy that aims to maximize the productivity of equipment by involving all employees in the maintenance process.
OEE and TPM are often used together to improve...
In case of line stop, I will immediately assess the situation and take necessary actions to minimize the impact on production.
Identify the cause of line stoppage
Communicate with production team to understand the impact on production
Prioritize the purchase of necessary materials to resume production
Explore alternative suppliers or materials if necessary
Ensure timely delivery of materials to minimize downtime
M codes and G codes are commands used in CNC machines to control various functions and operations.
M codes are used for miscellaneous functions like stopping the machine or changing tools.
G codes are used for specific movements and operations like cutting, drilling, or milling.
Examples of M codes: M00 (program stop), M06 (tool change), M30 (end of program)
Examples of G codes: G00 (rapid positioning), G01 (linear in...
HPDC department stands for High Pressure Die Casting department, which specializes in manufacturing complex metal components.
Specializes in manufacturing complex metal components
Utilizes high pressure to inject molten metal into molds
Requires precision and expertise in operating machinery
Plays a crucial role in automotive and aerospace industries
I appeared for an interview in Jan 2025.
I have experience with both CNC and VMC machines, handling various types of breakdowns.
I have experience troubleshooting mechanical issues such as tool wear or breakage in CNC machines.
I am familiar with programming errors and software glitches that can occur in VMC machines.
I have dealt with electrical problems like motor failures or sensor malfunctions in both types of machines.
I have experience in conducting regular...
I appeared for an interview in Jun 2025, where I was asked the following questions.
I applied via Company Website and was interviewed in Apr 2024. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.
Deferent between Tig and Mig welding
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There were 2 interview rounds.
I appeared for an interview in Sep 2024, where I was asked the following questions.
I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.
Top trending discussions
The duration of FCC Clutch interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 38 interview experiences
Difficulty level
Duration
based on 559 reviews
Rating in categories
Engineer
185
salaries
| ₹2.7 L/yr - ₹6 L/yr |
Senior Engineer
180
salaries
| ₹4.2 L/yr - ₹8.4 L/yr |
Assistant Manager
159
salaries
| ₹6 L/yr - ₹12.6 L/yr |
Production Engineer
122
salaries
| ₹3 L/yr - ₹6 L/yr |
Quality Engineer
83
salaries
| ₹2.4 L/yr - ₹6.4 L/yr |
Hitachi Astemo
Faurecia
CIE Automotive India Limited (Formerly known as Mahindra CIE Automotive Limited)
DENSO