Filter interviews by
Explanation of how to calculate OEE, 7 QC tools, TPM, JH steps, SPC
OEE = Availability x Performance x Quality
7 QC tools include Pareto chart, fishbone diagram, control chart, etc.
TPM involves total employee involvement in maintenance
JH steps include job analysis, job design, job instruction, etc.
SPC involves statistical analysis of process data
Plant maintenance activities include Why-Why analysis of breakdowns and energy saving projects.
Plant maintenance activities are crucial for ensuring smooth operations and preventing breakdowns.
Why-Why analysis is a problem-solving technique used to identify the root cause of breakdowns and prevent their recurrence.
Energy saving projects involve identifying opportunities to reduce energy consumption and implementin...
Polymers are large molecules made up of repeating units called monomers. They have a wide range of applications in various fields.
Polyethylene
Polypropylene
Polyvinyl chloride
Polystyrene
Polyester
Polyurethane
Nylon
Teflon
Silicone
Rubber
I appeared for an interview in Jan 2025.
I have experience with both CNC and VMC machines, handling various types of breakdowns.
I have experience troubleshooting mechanical issues such as tool wear or breakage in CNC machines.
I am familiar with programming errors and software glitches that can occur in VMC machines.
I have dealt with electrical problems like motor failures or sensor malfunctions in both types of machines.
I have experience in conducting regular...
I appeared for an interview in Jun 2025, where I was asked the following questions.
I applied via Company Website and was interviewed in Apr 2024. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.
Deferent between Tig and Mig welding
I applied via Recruitment Consulltant and was interviewed in Jan 2024. There were 2 interview rounds.
I appeared for an interview in Sep 2024, where I was asked the following questions.
I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.
Top trending discussions
The duration of FCC Clutch interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 38 interview experiences
Difficulty level
Duration
based on 559 reviews
Rating in categories
Engineer
185
salaries
| ₹2.7 L/yr - ₹6 L/yr |
Senior Engineer
180
salaries
| ₹4.2 L/yr - ₹8.4 L/yr |
Assistant Manager
159
salaries
| ₹6 L/yr - ₹12.6 L/yr |
Production Engineer
122
salaries
| ₹3 L/yr - ₹6 L/yr |
Quality Engineer
83
salaries
| ₹2.4 L/yr - ₹6.4 L/yr |
Hitachi Astemo
Faurecia
CIE Automotive India Limited (Formerly known as Mahindra CIE Automotive Limited)
DENSO